EIN: 736006395
UEI: NMJKMBUDAA58
Audited by: OSAI
Oversight agency: 21 [Department of the Treasury]
View federal awards & risk assessment →
Data as of August 28, 2026
Management decision deadline — for entities that funded this organization
The FAC accepted this audit on September 24, 2025. Under 2 CFR 200.521(d), a pass-through entity that provided federal funds to this organization for this audit period must issue a management decision on these findings by March 24, 2026 (160 days ago).
What is a management decision? →Lack of County-Wide Controls Over Major Federal Program – Coronavirus State and Local Fiscal Recovery Funds (Repeat Finding – 2022-014, 2023-004)
Show full finding ▾Hide full finding ▴Lack of County-Wide Controls Over Major Federal Program – Coronavirus State and Local Fiscal Recovery Funds (Repeat Finding – 2022-014, 2023-004)
The Board of County Commissioners will work with all elected officials, the new county grant administrator, and federal, state and local partners to develop policies, procedures, and internal controls designed to accurately track grants, including the application process, verification, oversight, and reporting of grant requirements.
2023-004
Lack of Internal Controls Over Major Federal Program – Coronavirus State and Local Fiscal Recovery Funds (Repeat Finding – 2022-015, 2023-005)
Show full finding ▾Hide full finding ▴Lack of Internal Controls Over Major Federal Program – Coronavirus State and Local Fiscal Recovery Funds (Repeat Finding – 2022-015, 2023-005)
The Board of County Commissioners will work with all elected officials, the new county grant administrator, and federal, state and local partners to develop policies, procedures, and internal controls designed to accurately track grants, including the application process, verification, oversight, and reporting of grant requirements.
2023-005
Noncompliance Over Procurement and Suspension and Debarment – Coronavirus State and Local Fiscal Recovery Funds (Repeat Finding – 2022-011, 2023-006)
Show full finding ▾Hide full finding ▴Noncompliance Over Procurement and Suspension and Debarment – Coronavirus State and Local Fiscal Recovery Funds (Repeat Finding – 2022-011, 2023-006)
The Board of County Commissioners, with the cooperation and participation of all elected officials, reviews, develops and implements policies and procedures to create a strong internal control environment. The Board of County Commissioners will work with all elected officials, the new county grant administrator, and federal, state and local partners to develop policies, procedures, and internal controls designed to accurately track grants, including the application process, verification, oversight, and reporting of grant requirements. The Board of County Commissioners will work with the new county grant administrator to ensure proper grant administration.
2023-006
Noncompliance Over Reporting – Coronavirus State and Local Fiscal Recovery Funds (Repeat Finding – 2022-013, 2023-007)
Show full finding ▾Hide full finding ▴Noncompliance Over Reporting – Coronavirus State and Local Fiscal Recovery Funds (Repeat Finding – 2022-013, 2023-007)
The Board of County Commissioners, with the cooperation and participation of all elected officials, reviews, develops and implements policies and procedures to create a strong internal control environment. The Board of County Commissioners will work with all elected officials, the new county grant administrator, and federal, state and local partners to develop policies, procedures, and internal controls designed to accurately track grants, including the application process, verification, oversight, and reporting of grant requirements. The Board of County Commissioners will work with the new county grant administrator to ensure proper grant administration.
2023-007
FAC accepted this audit on September 24, 2025 — management decision was due March 24, 2026.
Lack of County-Wide Controls Over Major Federal Program – Coronavirus State and Local Fiscal Recovery Funds (Repeat Finding – 2022-014)
Show full finding ▾Hide full finding ▴Lack of County-Wide Controls Over Major Federal Program – Coronavirus State and Local Fiscal Recovery Funds (Repeat Finding – 2022-014)
The Board of County Commissioners will work with all elected officials, the new county grant administrator, and federal, state and local partners to develop policies, procedures, and internal controls designed to accurately track grants, including the application process, verification, oversight, and reporting of grant requirements
2022-014
Lack of Internal Controls Over Major Federal Program – Coronavirus State and Local Fiscal Recovery Funds (Repeat Finding – 2022-015)
Show full finding ▾Hide full finding ▴Lack of Internal Controls Over Major Federal Program – Coronavirus State and Local Fiscal Recovery Funds (Repeat Finding – 2022-015)
The Board of County Commissioners will work with all elected officials, the new county grant administrator, and federal, state and local partners to develop policies, procedures, and internal controls designed to accurately track grants, including the application process, verification, oversight, and reporting of grant requirements.
2022-015
Noncompliance Over Procurement and Suspension and Debarment – Coronavirus State and Local Fiscal Recovery Funds (Repeat Finding – 2022-011)
Show full finding ▾Hide full finding ▴Noncompliance Over Procurement and Suspension and Debarment – Coronavirus State and Local Fiscal Recovery Funds (Repeat Finding – 2022-011)
The Board of County Commissioners, with the cooperation and participation of all elected officials, reviews, develops and implements policies and procedures to create a strong internal control environment. The Board of County Commissioners will work with all elected officials, the new county grant administrator, and federal, state and local partners to develop policies, procedures, and internal controls designed to accurately track grants, including the application process, verification, oversight, and reporting of grant requirements. The Board of County Commissioners will work with the new county grant administrator to ensure proper grant administration.
2022-011
Noncompliance Over Reporting – Coronavirus State and Local Fiscal Recovery Funds (Repeat Finding – 2022-013)
Show full finding ▾Hide full finding ▴Noncompliance Over Reporting – Coronavirus State and Local Fiscal Recovery Funds (Repeat Finding – 2022-013)
The Board of County Commissioners, with the cooperation and participation of all elected officials, reviews, develops and implements policies and procedures to create a strong internal control environment. The Board of County Commissioners will work with all elected officials, the new county grant administrator, and federal, state and local partners to develop policies, procedures, and internal controls designed to accurately track grants, including the application process, verification, oversight, and reporting of grant requirements. The Board of County Commissioners will work with the new county grant administrator to ensure proper grant administration.
2022-013
Noncompliance Over Activities Allowed or Unallowed and Allowable Costs/Cost Principles – Coronavirus State and Loal Fiscal Recovery Funds
Show full finding ▾Hide full finding ▴Noncompliance Over Activities Allowed or Unallowed and Allowable Costs/Cost Principles – Coronavirus State and Loal Fiscal Recovery Funds
The Board of County Commissioners will work with all elected officials, the new county grant administrator, and federal, state and local partners to develop policies, procedures, and internal controls designed to accurately track grants, including the application process, verification, oversight, and reporting of grant requirements. The Board of County Commissioners will work with the new county grant administrator to ensure proper grant administration.
Noncompliance Over Subrecipient Monitoring – Coronavirus State and Local Fiscal Recovery Funds
Show full finding ▾Hide full finding ▴Noncompliance Over Subrecipient Monitoring – Coronavirus State and Local Fiscal Recovery Funds
The Board of County Commissioners, with the cooperation and participation of all elected officials, reviews, develops and implements policies and procedures to create a strong internal control environment. The Board of County Commissioners will work with all elected officials, the new county grant administrator, and federal, state and local partners to develop policies, procedures, and internal controls designed to accurately track grants, including the application process, verification, oversight, and reporting of grant requirements. The Board of County Commissioners will work with the new county grant administrator to ensure proper grant administration.
FAC accepted this audit on March 13, 2025 — management decision was due September 13, 2025.
During our review of the disbursement data from Muskogee County regarding procurement and suspension and debarment as per the Uniform Guidance 2 CFR 200.317 through 200.327, we identified the following: • One (1) ambulance was purchased in the amount of $203,000 for the Muskogee County EMS. There were no bids or quotes provide by the County or found in the BOCC meeting minutes supporting expenditure documentation. • There were six (6) vendors, in which the County did not check the www.SAM.gov website to review if the vendor had been suspended or debarred for those disbursements that warranted a bid, on the 6-month bid list, or received quotes. Cause of Condition: Policies and procedures have not been designed and implemented to ensure compliance of expenditures for all federal awards. Effect of Condition: This condition resulted in noncompliance to grant requirements and could lead to a loss of federal funds to the County. Recommendation: OSAI recommends county officials and department heads gain an understanding of federal programs awarded to Muskogee County. Internal control procedures should be designed and implemented to ensure accurate procurement and suspension and debarment and to ensure compliance with federal requirements. Management Response: Chairman of the Board of County Commissioners: Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended. This includes that all expenditures are properly documented and that all vendors are federally eligible to perform services. Criteria: 2 CFR § 200.317 through 200.327 General Procurement Standards reads as follows: When procuring property and services under a Federal award, a State must follow the same policies and procedures it uses for procurements from its non-Federal funds. The State will comply with §§ 200.321, 200.322, and 200.323 and ensure that every purchase order or other contract includes any clauses required by § 200.327. All other non-Federal entities, including subrecipients of a State, must follow the procurement standards in §§ 200.318 through 200.327. The non-Federal entity must have and use documented procurement procedures, consistent with State, local, and tribal laws and regulations and the standards of this section, for the acquisition of property or services required under a Federal award or subaward. The non- Federal entity's documented procurement procedures must conform to the procurement standards identified in §§ 200.317 through 200.327. (b) Non-Federal entities must maintain oversight to ensure that contractors perform in accordance with the terms, conditions, and specifications of their contracts or purchase orders. 2 CFR 180.700 – 180.760 Suspension and 2 CFR 180.800 – 180.885 Debarment Non-federal entities are prohibited from contracting with or making subawards under covered transactions to parties that are suspended or debarred. “Covered transactions” include contracts for goods and services awarded under a non-procurement transaction (e.g., grant or cooperative agreement) that are expected to equal or exceed $25,000 or meet certain other criteria as specified in 2 CFR section 180.220. All non-procurement transactions entered into by a pass-through entity (i.e., subawards to subrecipients), irrespective of award amount, are considered covered transactions, unless they are exempt as provided in 2 CFR section 180.215.
Show full finding ▾Hide full finding ▴Finding 2022-011 - Noncompliance Over Procurement and Suspension and Debarment – Coronavirus State and Local Fiscal Recovery Funds PASS THROUGH GRANTOR: Direct Grant FEDERAL AGENCY: U.S. Department of Treasury ASSISTANCE LISTING: 21.027 FEDERAL PROGRAM NAME: Coronavirus State and Local Fiscal Recovery Funds (SLFRF) FEDERAL AWARD NUMBER: SLFRP3720 FEDERAL AWARD YEAR: 2022 CONTROL CATEGORY: Procurement and Suspension and Debarment QUESTIONED COSTS: $203,000 Condition: During our review of the disbursement data from Muskogee County regarding procurement and suspension and debarment as per the Uniform Guidance 2 CFR 200.317 through 200.327, we identified the following: • One (1) ambulance was purchased in the amount of $203,000 for the Muskogee County EMS. There were no bids or quotes provide by the County or found in the BOCC meeting minutes supporting expenditure documentation. • There were six (6) vendors, in which the County did not check the www.SAM.gov website to review if the vendor had been suspended or debarred for those disbursements that warranted a bid, on the 6-month bid list, or received quotes. Cause of Condition: Policies and procedures have not been designed and implemented to ensure compliance of expenditures for all federal awards. Effect of Condition: This condition resulted in noncompliance to grant requirements and could lead to a loss of federal funds to the County. Recommendation: OSAI recommends county officials and department heads gain an understanding of federal programs awarded to Muskogee County. Internal control procedures should be designed and implemented to ensure accurate procurement and suspension and debarment and to ensure compliance with federal requirements. Management Response: Chairman of the Board of County Commissioners: Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended. This includes that all expenditures are properly documented and that all vendors are federally eligible to perform services. Criteria: 2 CFR § 200.317 through 200.327 General Procurement Standards reads as follows: When procuring property and services under a Federal award, a State must follow the same policies and procedures it uses for procurements from its non-Federal funds. The State will comply with §§ 200.321, 200.322, and 200.323 and ensure that every purchase order or other contract includes any clauses required by § 200.327. All other non-Federal entities, including subrecipients of a State, must follow the procurement standards in §§ 200.318 through 200.327. The non-Federal entity must have and use documented procurement procedures, consistent with State, local, and tribal laws and regulations and the standards of this section, for the acquisition of property or services required under a Federal award or subaward. The non- Federal entity's documented procurement procedures must conform to the procurement standards identified in §§ 200.317 through 200.327. (b) Non-Federal entities must maintain oversight to ensure that contractors perform in accordance with the terms, conditions, and specifications of their contracts or purchase orders. 2 CFR 180.700 – 180.760 Suspension and 2 CFR 180.800 – 180.885 Debarment Non-federal entities are prohibited from contracting with or making subawards under covered transactions to parties that are suspended or debarred. “Covered transactions” include contracts for goods and services awarded under a non-procurement transaction (e.g., grant or cooperative agreement) that are expected to equal or exceed $25,000 or meet certain other criteria as specified in 2 CFR section 180.220. All non-procurement transactions entered into by a pass-through entity (i.e., subawards to subrecipients), irrespective of award amount, are considered covered transactions, unless they are exempt as provided in 2 CFR section 180.215.
Assistance Listing Number 21.027 Noncompliance Over Procurement and Suspension/Debarment - Major Federal Program - Coronavirus State and Local Fiscal Recovery Funds Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended. This includes that all expenditures are properly documented and that all vendors are ferderally eligible to perform services
During the process of documenting the County’s internal controls regarding federal reporting process, we noted that the County has not established procedures to ensure compliance with reporting requirement. Furthermore, while performing a test over the reporting requirement, we noted the following: • Interim report was not submitted. • Variances between expenditures reported on the quarterly reports and the County’s expenditure data: o Quarterly reports during the period of March through December 2021 expenditure amounts were more than County’s the expenditure data by $124,984. o Quarterly report Q1 2022 expenditure amount was more than the County’s expenditure data by $1,140,410. o Quarterly report Q2 2022 expenditure amount was less than the County’s expenditure data by $39,146. Cause of Condition: Policies and procedures have not been designed and implemented to ensure compliance of reporting compliance requirements. Effect of Condition: This condition resulted in noncompliance with grant requirements. Recommendation: OSAI recommends the County comply with federal laws and regulations and grant agreements by submitting required reports to the U.S. Department of the Treasury timely. In addition, OSAI recommends the County design and implement a system of internal controls to ensure the accuracy and completeness of information submitted. Management Response: Chairman of the Board of County Commissioners: Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended and properly reported. Criteria: GAO Standards – Section 2 – Establishing an Effective Internal Control System – OV2.23 states in part: Objectives of an Entity – Compliance Objectives Management conducts activities in accordance with applicable laws and regulations. As part of specifying compliance objectives, the entity determines which laws and regulations apply to the entity. Management is expected to set objectives that incorporate these requirements. 2 CFR § 200.303(a) Internal Controls reads as follows: The non-Federal entity must: Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in “Standards for Internal Control in the Federal Government” issued by the Comptroller General of the United States or the “Internal Control Integrated Framework”, issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Compliance and Reporting Guide – State and Local Fiscal Recovery Funds – Version 5.2 also states in part: States, U.S. territories, metropolitan cities, counties, and Tribal governments were required to submit a one-time interim report with expenditures7 by Expenditure Category covering the period from March 3rd to July 31, 2021, by August 31, 2021 or sixty (60) days after first receiving funding if the recipient’s date of award was between July 15, 2021 and October 15, 2021.
Show full finding ▾Hide full finding ▴Finding 2022-013 - Noncompliance Over Reporting – Coronavirus State and Local Fiscal Recovery Funds PASS THROUGH GRANTOR: Direct Grant FEDERAL AGENCY: United States Department of the Treasury ASSISTANCE LISTING: 21.027 FEDERAL PROGRAM NAME: Coronavirus State and Local Fiscal Recovery Funds (SLFRF) FEDERAL AWARD NUMBER: SLFRP3720 FEDERAL AWARD YEAR: 2022 CONTROL CATEGORY: Reporting QUESTIONED COSTS: $0 Condition: During the process of documenting the County’s internal controls regarding federal reporting process, we noted that the County has not established procedures to ensure compliance with reporting requirement. Furthermore, while performing a test over the reporting requirement, we noted the following: • Interim report was not submitted. • Variances between expenditures reported on the quarterly reports and the County’s expenditure data: o Quarterly reports during the period of March through December 2021 expenditure amounts were more than County’s the expenditure data by $124,984. o Quarterly report Q1 2022 expenditure amount was more than the County’s expenditure data by $1,140,410. o Quarterly report Q2 2022 expenditure amount was less than the County’s expenditure data by $39,146. Cause of Condition: Policies and procedures have not been designed and implemented to ensure compliance of reporting compliance requirements. Effect of Condition: This condition resulted in noncompliance with grant requirements. Recommendation: OSAI recommends the County comply with federal laws and regulations and grant agreements by submitting required reports to the U.S. Department of the Treasury timely. In addition, OSAI recommends the County design and implement a system of internal controls to ensure the accuracy and completeness of information submitted. Management Response: Chairman of the Board of County Commissioners: Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended and properly reported. Criteria: GAO Standards – Section 2 – Establishing an Effective Internal Control System – OV2.23 states in part: Objectives of an Entity – Compliance Objectives Management conducts activities in accordance with applicable laws and regulations. As part of specifying compliance objectives, the entity determines which laws and regulations apply to the entity. Management is expected to set objectives that incorporate these requirements. 2 CFR § 200.303(a) Internal Controls reads as follows: The non-Federal entity must: Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in “Standards for Internal Control in the Federal Government” issued by the Comptroller General of the United States or the “Internal Control Integrated Framework”, issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Compliance and Reporting Guide – State and Local Fiscal Recovery Funds – Version 5.2 also states in part: States, U.S. territories, metropolitan cities, counties, and Tribal governments were required to submit a one-time interim report with expenditures7 by Expenditure Category covering the period from March 3rd to July 31, 2021, by August 31, 2021 or sixty (60) days after first receiving funding if the recipient’s date of award was between July 15, 2021 and October 15, 2021.
Assistance Listing Number 21.027 Noncompliance Over Reporting - Major Federal Program - Coronavirus State and Local Fiscal Recovery Funds Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended and properly reported.
County-wide controls regarding Control Environment, Risk Assessment, Information and Communication, and Monitoring have not been designed. Cause of Condition: Policies and procedures have not been designed and implemented to ensure the County complies with grant requirements. Effect of Condition: This condition could result in noncompliance with grant requirements. Recommendation: OSAI recommends that the County design and implement a system of internal controls to ensure compliance with grant requirements. Management Response: Chairman Board of County Commissioners: Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended. Criteria: The GAO Standards – Section 1 – Fundamental Concepts of Internal Control – OV1.01 states in part: Definition of Internal Control Internal control is a process effected by an entity’s oversight body, management, and other personnel that provides reasonable assurance that the objectives of an entity will be achieved. Additionally, GAO Standards – Section 2 – Establishing an Effective Internal Control System – OV2.04 states in part: Components, Principles, and Attributes Control Environment - The foundation for an internal control system. It provides the discipline and structure to help an entity achieve its objectives. Risk Assessment - Assesses the risks facing the entity as it seeks to achieve its objectives. This assessment provides the basis for developing appropriate risk responses. Information and Communication - The quality information management and personnel communicate and use to support the internal control system. Monitoring - Activities management establishes and operates to assess the quality of performance over time and promptly resolve the findings of audits and other reviews.
Show full finding ▾Hide full finding ▴Finding 2022-014 – Lack of County-Wide Controls Over Major Federal Program – Coronavirus State and Local Fiscal Recovery Funds PASS THROUGH GRANTOR: Direct Grant FEDERAL AGENCY: U.S. Department of Treasury ASSISTANCE LISTING: 21.027 FEDERAL PROGRAM NAME: Coronavirus State and Local Fiscal Recovery Funds (SLFRF) FEDERAL AWARD NUMBER: SLFRP3720 FEDERAL AWARD YEAR: 2022 CONTROL CATEGORY: Activities Allowed or Unallowed; Allowable Costs/Cost Principles; Period of Performance; Procurement and Suspension and Debarment; Reporting QUESTIONED COSTS: $-0- Condition: County-wide controls regarding Control Environment, Risk Assessment, Information and Communication, and Monitoring have not been designed. Cause of Condition: Policies and procedures have not been designed and implemented to ensure the County complies with grant requirements. Effect of Condition: This condition could result in noncompliance with grant requirements. Recommendation: OSAI recommends that the County design and implement a system of internal controls to ensure compliance with grant requirements. Management Response: Chairman Board of County Commissioners: Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended. Criteria: The GAO Standards – Section 1 – Fundamental Concepts of Internal Control – OV1.01 states in part: Definition of Internal Control Internal control is a process effected by an entity’s oversight body, management, and other personnel that provides reasonable assurance that the objectives of an entity will be achieved. Additionally, GAO Standards – Section 2 – Establishing an Effective Internal Control System – OV2.04 states in part: Components, Principles, and Attributes Control Environment - The foundation for an internal control system. It provides the discipline and structure to help an entity achieve its objectives. Risk Assessment - Assesses the risks facing the entity as it seeks to achieve its objectives. This assessment provides the basis for developing appropriate risk responses. Information and Communication - The quality information management and personnel communicate and use to support the internal control system. Monitoring - Activities management establishes and operates to assess the quality of performance over time and promptly resolve the findings of audits and other reviews.
Assistance Listing Number 21.027 Lack of County-Wide Controls Over Major Federal Programs -Coronavirus State and Local Fiscal Recovery Funds Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended.
During the process of documenting the County’s internal controls regarding federal disbursements, we noted that Muskogee County has not established procedures to ensure compliance with the following compliance requirements: Activities Allowed or Unallowed; Allowable Costs/Cost Principles; and Period of Performance, Procurement and Suspension and Debarment, and Reporting. Cause of Condition: Policies and procedures have not been designed and implemented to ensure federal expenditures are made in accordance with federal grant requirements. Effect of Condition: This condition could result in noncompliance to grant requirements and could lead to a loss of federal funds to the County. Recommendation: OSAI recommends that the County gain an understanding of requirements for these programs and implement a system of internal control procedures to ensure compliance with grant requirements. Management Response: Chairman of the Board of County Commissioners: Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended. Criteria: 2 CFR § 200.303 Internal Controls (a) reads as follows: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in “Standards for Internal Control in the Federal Government” issued by the Comptroller General of the United States or the “Internal Control Integrated Framework”, issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Further, accountability and stewardship should be overall goals in management’s accounting of federal funds. Internal controls should be designed to monitor compliance with laws and regulations pertaining to grant contracts.
Show full finding ▾Hide full finding ▴Finding 2022-015 – Lack of Internal Controls Over Major Federal Program – Coronavirus State and Local Fiscal Recovery Funds PASS THROUGH GRANTOR: Direct Grant FEDERAL AGENCY: U.S. Department of Treasury ASSISTANCE LISTING: 21.027 FEDERAL PROGRAM NAME: Coronavirus State and Local Fiscal Recovery Funds (SLFRF) FEDERAL AWARD NUMBER: SLFRP3720 FEDERAL AWARD YEAR: 2022 CONTROL CATEGORY: Activities Allowed or Unallowed; Allowable Costs/Cost Principles; Period of Performance; Procurement and Suspension and Debarment; Reporting QUESTIONED COSTS: $-0- Condition: During the process of documenting the County’s internal controls regarding federal disbursements, we noted that Muskogee County has not established procedures to ensure compliance with the following compliance requirements: Activities Allowed or Unallowed; Allowable Costs/Cost Principles; and Period of Performance, Procurement and Suspension and Debarment, and Reporting. Cause of Condition: Policies and procedures have not been designed and implemented to ensure federal expenditures are made in accordance with federal grant requirements. Effect of Condition: This condition could result in noncompliance to grant requirements and could lead to a loss of federal funds to the County. Recommendation: OSAI recommends that the County gain an understanding of requirements for these programs and implement a system of internal control procedures to ensure compliance with grant requirements. Management Response: Chairman of the Board of County Commissioners: Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended. Criteria: 2 CFR § 200.303 Internal Controls (a) reads as follows: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in “Standards for Internal Control in the Federal Government” issued by the Comptroller General of the United States or the “Internal Control Integrated Framework”, issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Further, accountability and stewardship should be overall goals in management’s accounting of federal funds. Internal controls should be designed to monitor compliance with laws and regulations pertaining to grant contracts.
Assistance Listing Number 21.027 Lack of Internal Controls Over Major Federal Programs - Coronavirus State and Local Fiscal Recovery Funds Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended.
FAC accepted this audit on March 13, 2025 — management decision was due September 13, 2025.
County-wide controls regarding Control Environment, Risk Assessment, Information and Communication, and Monitoring have not been designed. Cause of Condition: Policies and procedures have not been designed and implemented to ensure the County complies with grant requirements. Effect of Condition: This condition could result in noncompliance with grant requirements. Recommendation: OSAI recommends that the County design and implement a system of internal controls to ensure compliance with grant requirements. Management Response: Chairman of the Board of County Commissioners: Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended. Criteria: The GAO Standards – Section 1 – Fundamental Concepts of Internal Control – OV1.01 states in part: Definition of Internal Control Internal control is a process effected by an entity’s oversight body, management, and other personnel that provides reasonable assurance that the objectives of an entity will be achieved. Additionally, GAO Standards – Section 2 – Establishing an Effective Internal Control System – OV2.04 states in part: Components, Principles, and Attributes Control Environment - The foundation for an internal control system. It provides the discipline and structure to help an entity achieve its objectives. Risk Assessment - Assesses the risks facing the entity as it seeks to achieve its objectives. This assessment provides the basis for developing appropriate risk responses. Information and Communication - The quality information management and personnel communicate and use to support the internal control system. Monitoring - Activities management establishes and operates to assess the quality of performance over time and promptly resolve the findings of audits and other reviews.
Show full finding ▾Hide full finding ▴Finding 2021-010 – Lack of County-Wide Controls Over Major Federal Program – Coronavirus Relief Fund PASS THROUGH GRANTOR: Office of Management and Enterprise Services FEDERAL AGENCY: U. S. Department of the Treasury ASSISTANCE LISTING: 21.019 FEDERAL PROGRAM NAME: Coronavirus Relief Fund FEDERAL PROGRAM NUMBER: SA-0187 FEDERAL AWARD YEAR: 2021 CONTROL CATEGORY: Activities Allowed or Unallowed; Allowable Costs/Cost Principles; Period of Performance QUESTIONED COSTS: $-0- Condition: County-wide controls regarding Control Environment, Risk Assessment, Information and Communication, and Monitoring have not been designed. Cause of Condition: Policies and procedures have not been designed and implemented to ensure the County complies with grant requirements. Effect of Condition: This condition could result in noncompliance with grant requirements. Recommendation: OSAI recommends that the County design and implement a system of internal controls to ensure compliance with grant requirements. Management Response: Chairman of the Board of County Commissioners: Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended. Criteria: The GAO Standards – Section 1 – Fundamental Concepts of Internal Control – OV1.01 states in part: Definition of Internal Control Internal control is a process effected by an entity’s oversight body, management, and other personnel that provides reasonable assurance that the objectives of an entity will be achieved. Additionally, GAO Standards – Section 2 – Establishing an Effective Internal Control System – OV2.04 states in part: Components, Principles, and Attributes Control Environment - The foundation for an internal control system. It provides the discipline and structure to help an entity achieve its objectives. Risk Assessment - Assesses the risks facing the entity as it seeks to achieve its objectives. This assessment provides the basis for developing appropriate risk responses. Information and Communication - The quality information management and personnel communicate and use to support the internal control system. Monitoring - Activities management establishes and operates to assess the quality of performance over time and promptly resolve the findings of audits and other reviews.
Assistance Listing Number 21.019 Lack of County-Wide Controls Over Major Federal Programs Coronavirus Relief Fund Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended.
During the process of documenting the County’s internal controls regarding federal disbursements, we noted that Muskogee County has not established procedures to ensure compliance with the following compliance requirements: Activities Allowed or Unallowed; Allowable Costs/Cost Principles; and Period of Performance. Cause of Condition: Policies and procedures have not been designed and implemented to ensure federal expenditures are made in accordance with federal grant requirements. Effect of Condition: This condition could result in noncompliance to grant requirements and could lead to a loss of federal funds to the County. Recommendation: OSAI recommends that the County gain an understanding of requirements for these programs and implement a system of internal control procedures to ensure compliance with grant requirements. Management Response: Chairman of the Board of County Commissioners: Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended. Criteria: 2 CFR § 200.303 Internal Controls (a) reads as follows: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in “Standards for Internal Control in the Federal Government” issued by the Comptroller General of the United States or the “Internal Control Integrated Framework”, issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Further, accountability and stewardship should be overall goals in management’s accounting of federal funds. Internal controls should be designed to monitor compliance with laws and regulations pertaining to grant contracts.
Show full finding ▾Hide full finding ▴Finding 2021-011 – Lack of Internal Controls Over Major Federal Program – Coronavirus Relief Fund PASS THROUGH GRANTOR: Oklahoma Office of Management and Enterprise Services FEDERAL AGENCY: U. S. Department of the Treasury ASSISTANCE LISTING: 21.019 FEDERAL PROGRAM NAME: Coronavirus Relief Fund FEDERAL AWARD NUMBER: SA-0187 FEDERAL AWARD YEAR: 2021 CONTROL CATEGORY: Activities Allowed or Unallowed; Allowable Costs/Cost Principles; Period of Performance QUESTIONED COSTS: $-0- Condition: During the process of documenting the County’s internal controls regarding federal disbursements, we noted that Muskogee County has not established procedures to ensure compliance with the following compliance requirements: Activities Allowed or Unallowed; Allowable Costs/Cost Principles; and Period of Performance. Cause of Condition: Policies and procedures have not been designed and implemented to ensure federal expenditures are made in accordance with federal grant requirements. Effect of Condition: This condition could result in noncompliance to grant requirements and could lead to a loss of federal funds to the County. Recommendation: OSAI recommends that the County gain an understanding of requirements for these programs and implement a system of internal control procedures to ensure compliance with grant requirements. Management Response: Chairman of the Board of County Commissioners: Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended. Criteria: 2 CFR § 200.303 Internal Controls (a) reads as follows: The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in “Standards for Internal Control in the Federal Government” issued by the Comptroller General of the United States or the “Internal Control Integrated Framework”, issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Further, accountability and stewardship should be overall goals in management’s accounting of federal funds. Internal controls should be designed to monitor compliance with laws and regulations pertaining to grant contracts.
Assistance Listing Number21.019 Lack of Internal Controls Over Major Federal Programs Coronavirus Relief Fund Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended.
During the test of 100% of federal expenditures for Coronavirus Relief Fund, program disbursement totaling $1,089,096 were not expended in accordance with the Activities Allowed or Unallowed and Allowable Costs/Cost Principles due to unsubstantiated, duplicated, and ineligible costs as detailed below: Payroll Reimbursements • Unallowable reimbursement in the amount of $1,900 for longevity bonus. • Sick leave totaling $2,285 for a county official. • Duplicate payroll reimbursements totaling $17,668 were reimbursed by another grant. Expenditure Reimbursements • Reimbursements totaling $1,059,350 for hazard runs on behalf of Muskogee EMS District. • Reimbursements totaling $7,879 were not supported with adequate documentation. • Reimbursement in the amount of $14 that exceeded the purchase order amount. Cause of Condition: Policies and procedures have not been designed and implemented to ensure compliance with federal award requirements. Effect of Condition: This condition resulted in noncompliance with federal grant requirements for this program and could result in loss of federal funds. Recommendation: OSAI recommends the County gain an understanding of the requirements for this program and design and implement policies and procedures to ensure compliance with these requirements. Management Response: Chairman of the Board of County Commissioners: Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended within the allowable period of performance. It should be noted that Oklahoma Office of Management Enterprise Services did not review any of the submitted information to determine eligibility prior to sending reimbursements for items that have now been determined questionable. County Clerk: Documentation was scanned into the Purchase Order’s images and once the Purchase Order was paid, the images were then deleted by the Board of County Commissioners secretary. Images were later recovered by the software system and since the incident, restrictions have been implemented to no longer allow deletions. Criteria: 2 CFR § 200.303(a) - Internal Controls reads as follows: The non-Federal entity must: Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in “Standards for Internal Control in the Federal Government” issued by the Comptroller General of the United States or the “Internal Control Integrated Framework”, issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Additionally, 2 CFR § 200.403 - Factors affecting allowability costs states in part, Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: (g) Be adequately documented. The Department of the Treasury Federal Register, Vol. 86, No. 10 states, “Fund payments may not be used for expenses that have been or will be reimbursed by another federal program.” Additional guidance provided in the Subrecipient Agreement - Federal Funding Certification executed 6/3/20 between Muskogee County and the State of Oklahoma states in part, “4.Funds provided as direct payment from the State of Oklahoma pursuant to this certification for necessary expenditures that were or will be incurred during the period that begins on March 1, 2020, and ending on December 30, 2020, that are not expended on those necessary expenditures on or before March 31, 2021, by the political subdivision or its grantee(s), must be returned to the State of Oklahoma on or before April 1, 2021.”, 5. Funds provided as a direct payment from the State of Oklahoma pursuant to this certification must adhere to official federal guidance issued or to be issued on what constitutes a necessary expenditure. Any funds expended by a political subdivision or its grantee(s) in any manner that does not adhere to official federal guidance or in violation of this certification shall be returned to the State of Oklahoma Coronavirus Relief Fund. 6. Any local government entity receiving funds pursuant to this certification shall retain documentation of all uses of the funds… 8. Any funds provided pursuant to this certification cannot be used as a revenue replacement for lower than expected tax or other revenue collections. 10. I acknowledge and certify that Recipient has not received, and will not apply for, federal funds from any other source, to reimburse it for the expenditures for which funds are sought pursuant hereto.”
Show full finding ▾Hide full finding ▴Finding 2021-012 – Noncompliance Over Major Federal Program – Coronavirus Relief Fund – Activities Allowed or Unallowed and Allowable Costs/Cost Principles PASS-THROUGH GRANTOR: Oklahoma Office of Management and Enterprise Services FEDERAL AGENCY: U.S. Department of Treasury ASSISTANCE LISGING: 21.019 FEDERAL PROGRAM NAME: Coronavirus Relief Fund FEDERAL AWARD NUMBER: SA-0187 FEDERAL AWARD YEAR: 2021 CONTROL CATEGORY: Activities Allowed or Unallowed and Allowable Costs/Cost Principles QUESTIONED COSTS: $1,089,096 Condition: During the test of 100% of federal expenditures for Coronavirus Relief Fund, program disbursement totaling $1,089,096 were not expended in accordance with the Activities Allowed or Unallowed and Allowable Costs/Cost Principles due to unsubstantiated, duplicated, and ineligible costs as detailed below: Payroll Reimbursements • Unallowable reimbursement in the amount of $1,900 for longevity bonus. • Sick leave totaling $2,285 for a county official. • Duplicate payroll reimbursements totaling $17,668 were reimbursed by another grant. Expenditure Reimbursements • Reimbursements totaling $1,059,350 for hazard runs on behalf of Muskogee EMS District. • Reimbursements totaling $7,879 were not supported with adequate documentation. • Reimbursement in the amount of $14 that exceeded the purchase order amount. Cause of Condition: Policies and procedures have not been designed and implemented to ensure compliance with federal award requirements. Effect of Condition: This condition resulted in noncompliance with federal grant requirements for this program and could result in loss of federal funds. Recommendation: OSAI recommends the County gain an understanding of the requirements for this program and design and implement policies and procedures to ensure compliance with these requirements. Management Response: Chairman of the Board of County Commissioners: Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended within the allowable period of performance. It should be noted that Oklahoma Office of Management Enterprise Services did not review any of the submitted information to determine eligibility prior to sending reimbursements for items that have now been determined questionable. County Clerk: Documentation was scanned into the Purchase Order’s images and once the Purchase Order was paid, the images were then deleted by the Board of County Commissioners secretary. Images were later recovered by the software system and since the incident, restrictions have been implemented to no longer allow deletions. Criteria: 2 CFR § 200.303(a) - Internal Controls reads as follows: The non-Federal entity must: Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in “Standards for Internal Control in the Federal Government” issued by the Comptroller General of the United States or the “Internal Control Integrated Framework”, issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Additionally, 2 CFR § 200.403 - Factors affecting allowability costs states in part, Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: (g) Be adequately documented. The Department of the Treasury Federal Register, Vol. 86, No. 10 states, “Fund payments may not be used for expenses that have been or will be reimbursed by another federal program.” Additional guidance provided in the Subrecipient Agreement - Federal Funding Certification executed 6/3/20 between Muskogee County and the State of Oklahoma states in part, “4.Funds provided as direct payment from the State of Oklahoma pursuant to this certification for necessary expenditures that were or will be incurred during the period that begins on March 1, 2020, and ending on December 30, 2020, that are not expended on those necessary expenditures on or before March 31, 2021, by the political subdivision or its grantee(s), must be returned to the State of Oklahoma on or before April 1, 2021.”, 5. Funds provided as a direct payment from the State of Oklahoma pursuant to this certification must adhere to official federal guidance issued or to be issued on what constitutes a necessary expenditure. Any funds expended by a political subdivision or its grantee(s) in any manner that does not adhere to official federal guidance or in violation of this certification shall be returned to the State of Oklahoma Coronavirus Relief Fund. 6. Any local government entity receiving funds pursuant to this certification shall retain documentation of all uses of the funds… 8. Any funds provided pursuant to this certification cannot be used as a revenue replacement for lower than expected tax or other revenue collections. 10. I acknowledge and certify that Recipient has not received, and will not apply for, federal funds from any other source, to reimburse it for the expenditures for which funds are sought pursuant hereto.”
Assistance Listing Number 21.019 Noncompliance Over Major Federal Program Coronavirus Relief Fund Activities Allowed or Unallowed and Allowable Costs/Cost Principles Chairman Board of County Commissioners: Muskogee County has hired an internal grant administrator to assist in keeping the county compliant with all local, state, and federal requirements. Efforts will be made going forward to ensure that all grant funds are properly expended within the allowable period of performance. It should be noted that OMES did not review any of the submitted information to determine eligibility prior to sending reimbursements for items that have now been determined questionable. County Clerk: Documentation was scanned into the Purchase Order's images and once the Purchase Order was paid, the images were then deleted by the Board of County Commissioners secretary. Images were later recovered by the software system and since the incident, restrictions have been implemented to no longer allow deletions.
FAC accepted this audit on March 11, 2021 — management decision was due September 11, 2021.
GSA_MIGRATION
Show full finding ▾Hide full finding ▴GSA_MIGRATION
GSA_MIGRATION
2007-023, 2008-018, 2009-020, 2010-019, 2016-022, 2017-014
GSA_MIGRATION
Show full finding ▾Hide full finding ▴GSA_MIGRATION
GSA_MIGRATION
2014-018
GSA_MIGRATION
Show full finding ▾Hide full finding ▴GSA_MIGRATION
GSA_MIGRATION
2014-019
Data source: This information comes from the Federal Audit Clearinghouse, the official repository of Single Audit data. All data is public domain. Verify this organization's audit history at fac.gov.
Browse other Single Audit organizations in Oklahoma →
Track your findings and corrective action plans across audit cycles.
Start tracking findings →Monitor subrecipient audit findings and filing records.
Start monitoring →© 2026 Single Audit Intelligence. All data is public domain.