EIN: 850462470
UEI: YZ9TE3GLSRM7
Audited by: Hinkle + Landers, PC
Oversight agency: 14 [Department of Housing and Urban Development]
View federal awards & risk assessment →
Showing data from August 28, 2026 — the Federal Audit Clearinghouse is under high demand right now, so this couldn't be refreshed. This is the most recent data on record, not necessarily today's.
Management decision deadline — for entities that funded this organization
The FAC accepted this audit on September 30, 2025. Under 2 CFR 200.521(d), a pass-through entity that provided federal funds to this organization for this audit period must issue a management decision on these findings by March 30, 2026 (154 days ago).
What is a management decision? →FAC accepted this audit on September 27, 2024 — management decision was due March 27, 2025.
FAC accepted this audit on September 25, 2023 — management decision was due March 25, 2024.
2022-001 (2020-002) ? FEDERAL REPORTING COMPLIANCEType of Finding: (E, F) ? Significant Deficiency in Internal Control Over Compliance of Federal Awards and Instance of Non-Compliance Related to Federal AwardsFunding Agency: U.S. Department of Health and Human ServicesTitle: Transitional Living for Homeless YouthAL #: 93.550Award #: 90CX717705Award Period: September 30, 2021 ? September 29, 2022Questioned Costs: NoneStatement of ConditionDuring our testing of the Reporting Compliance requirement for the major program, Transitional Living for Homeless Youth (AL #93.550), we noted Federal Financial Reporting (FFR) and Program Progress Reports (PPR) were submitted past the due date deadlines as follows: See Schedule of Findings and Questioned Costs for chart/tableCriteriaPer grant awards:? The submission of SF-425 FFR will be on a semi-annual basis. A final FFR shall be submitted at the completion of the award agreement. For final FFRs, the reporting period end date shall be the end date of the project or grant period. Semi-annual reports shall be submitted no later than 30 days after the end of each reporting period. Annual reports shall be submitted no later than 90 days after the end of each reporting period. Final reports shall be submitted no later than 90 days after the project or grant period end date.? The PPR is due 30 days after the end of the second and fourth quarter of the budget period (every six months). The final PPR is due 90 days after the project period end date.CauseDreamTree Project experienced substantial growth in prior years, while keeping a similar number of administrative staff. This caused the reporting deadlines to be missed.EffectDreamTree Project, Inc. is not in compliance with grant reporting requirements and could jeopardize future federal funding.RecommendationDreamTree Project, Inc. should implement procedures and controls to ensure that the federal reports are completed and submitted prior to the deadline. Such as setting up a tracker for all the required reports, by grant, with deadlines and calendar reminders prior to the deadline.
Show full finding ▾Hide full finding ▴2022-001 (2020-002) ? FEDERAL REPORTING COMPLIANCEType of Finding: (E, F) ? Significant Deficiency in Internal Control Over Compliance of Federal Awards and Instance of Non-Compliance Related to Federal AwardsFunding Agency: U.S. Department of Health and Human ServicesTitle: Transitional Living for Homeless YouthAL #: 93.550Award #: 90CX717705Award Period: September 30, 2021 ? September 29, 2022Questioned Costs: NoneStatement of ConditionDuring our testing of the Reporting Compliance requirement for the major program, Transitional Living for Homeless Youth (AL #93.550), we noted Federal Financial Reporting (FFR) and Program Progress Reports (PPR) were submitted past the due date deadlines as follows: See Schedule of Findings and Questioned Costs for chart/tableCriteriaPer grant awards:? The submission of SF-425 FFR will be on a semi-annual basis. A final FFR shall be submitted at the completion of the award agreement. For final FFRs, the reporting period end date shall be the end date of the project or grant period. Semi-annual reports shall be submitted no later than 30 days after the end of each reporting period. Annual reports shall be submitted no later than 90 days after the end of each reporting period. Final reports shall be submitted no later than 90 days after the project or grant period end date.? The PPR is due 30 days after the end of the second and fourth quarter of the budget period (every six months). The final PPR is due 90 days after the project period end date.CauseDreamTree Project experienced substantial growth in prior years, while keeping a similar number of administrative staff. This caused the reporting deadlines to be missed.EffectDreamTree Project, Inc. is not in compliance with grant reporting requirements and could jeopardize future federal funding.RecommendationDreamTree Project, Inc. should implement procedures and controls to ensure that the federal reports are completed and submitted prior to the deadline. Such as setting up a tracker for all the required reports, by grant, with deadlines and calendar reminders prior to the deadline.
View of Responsible Official and Corrective Action PlanDreamTree Project, Inc. had experienced steady growth through 2019, which created a challenge for our administrative team. In 2020 and 2021, we dramatically expanded programs and services, which more than doubled our budget and exacerbated the challenges. We have created new administrative positions and invested in project management software; and have established a new shared calendar with all reporting deadlines and are reviewing upcoming deadlines each month. We are now on track to be ahead of our deadlines for the remainder of 2023 and all of 2024. Catherine Hummel, Executive Director, is responsible for the resolution of this finding.
2021-002
FAC accepted this audit on May 24, 2023 — management decision was due November 24, 2023.
2021-001 (2020-001) ? LATE DATA COLLECTION FORMType of Finding: (F) ? Instance of Non-Compliance Related to Federal AwardsFunding Agency: AllTitle: AllAL #: AllAward #: AllAward Period: All periodsEstimated Questioned Costs: NoneStatement of ConditionDreamTree Project, Inc. submitted the data collection form after the required due date.CriteriaThe audit shall be completed and the data collection form and reporting package shall be electronically transmitted within the earlier of 30 days after receipt of the auditor's reports, or nine months after the end of the audit period. If the due date falls on a Saturday, Sunday, or Federal holiday, the reporting package is due the next business day (2 CFR 200.512(a)).CauseDreamTree Project, Inc. did not submit the December 31, 2021, data collection form and reporting package by the due date due to significant program expansion and the backlog created for the administrative team. This also caused a delay in preparing and completing the fiscal year 2021 audit.EffectDreamTree Project, Inc. is not in compliance with Federal Award data collection form requirements and could jeopardize future federal funding.RecommendationDreamTree Project, Inc. should implement procedures and controls to ensure that all future audit reports and data collection forms are completed in a timely manner.View of Responsible Official and Corrective Action PlanSignificant program expansion and change of fiscal year end in 2020 created a backlog for our administrative team, which delayed the 2020 and 2021 audits. DreamTree Project, Inc. has hired additional administrative staff and implemented procedures, including project management software, to ensure that 2022 and future audit reports and data collection forms are completed on time.
Show full finding ▾Hide full finding ▴2021-001 (2020-001) ? LATE DATA COLLECTION FORMType of Finding: (F) ? Instance of Non-Compliance Related to Federal AwardsFunding Agency: AllTitle: AllAL #: AllAward #: AllAward Period: All periodsEstimated Questioned Costs: NoneStatement of ConditionDreamTree Project, Inc. submitted the data collection form after the required due date.CriteriaThe audit shall be completed and the data collection form and reporting package shall be electronically transmitted within the earlier of 30 days after receipt of the auditor's reports, or nine months after the end of the audit period. If the due date falls on a Saturday, Sunday, or Federal holiday, the reporting package is due the next business day (2 CFR 200.512(a)).CauseDreamTree Project, Inc. did not submit the December 31, 2021, data collection form and reporting package by the due date due to significant program expansion and the backlog created for the administrative team. This also caused a delay in preparing and completing the fiscal year 2021 audit.EffectDreamTree Project, Inc. is not in compliance with Federal Award data collection form requirements and could jeopardize future federal funding.RecommendationDreamTree Project, Inc. should implement procedures and controls to ensure that all future audit reports and data collection forms are completed in a timely manner.View of Responsible Official and Corrective Action PlanSignificant program expansion and change of fiscal year end in 2020 created a backlog for our administrative team, which delayed the 2020 and 2021 audits. DreamTree Project, Inc. has hired additional administrative staff and implemented procedures, including project management software, to ensure that 2022 and future audit reports and data collection forms are completed on time.
View of Responsible Official and Corrective Action PlanSignificant program expansion and change of fiscal year end in 2020 created a backlog for our administrative team, which delayed the 2020 and 2021 audits. DreamTree Project, Inc. has hired additional administrative staff and implemented procedures, including project management software, to ensure that 2022 and future audit reports and data collection forms are completed on time. Catherine Hummel, Executive Director, is responsible for the resolution of this finding.
2020-001
2021-002 (2020-002) ? FEDERAL REPORTING COMPLIANCEType of Finding: (E, F) ? Significant Deficiency in Internal Control Over Compliance of Federal Awards and Instance of Non-Compliance Related to Federal AwardsFunding Agency: U.S. Department of Health and Human ServicesTitle: Transitional Living for Homeless YouthAL #: 93.550Award #: 90CX717704, 90CX717703C3Award Period: September 30, 2020 ? September 29, 2021Estimated Questioned Costs: NoneStatement of ConditionDuring testing of the Federal Financial Reporting requirements of major program 93.550, for periods ending during fiscal year 2021, the following reports were submitted after the deadline: See Schedule of Findings and Questioned Costs for chart/tableCriteriaPer grant awards:? The submission of interim FFRs will be on a quarterly, semi-annual, or annual basis, as directed by the Federal agency. A final FFR shall be submitted at the completion of the award agreement. The following reporting period end dates shall be used for interim reports: 3/31, 6/30, 9/30, or 12/31. For final FFRs, the reporting period end date shall be the end date of the project or grant period.? Quarterly and semi-annual interim reports shall be submitted no later than 30 days after the end of each reporting period. Annual reports shall be submitted no later than 90 days after the end of each reporting period. Final reports shall be submitted no later than 90 days after the project or grant period end date.CauseDreamTree Project experienced substantial growth in 2020 and 2021, while keeping a similar number of administrative staff. This caused the reporting deadlines to be missed.EffectDreamTree Project, Inc. is not in compliance with grant reporting requirements and could jeopardize future federal funding.RecommendationDreamTree Project, Inc. should implement procedures and controls to ensure that the federal reports are completed and submitted prior to the deadline. Such as setting up a tracker for all the required reports, by grant, with deadlines and calendar reminders prior to the deadline.View of Responsible Official and Corrective Action PlanDreamTree Project, Inc. had experienced steady growth through 2019, which created a challenge for our administrative team. In 2020 and 2021, we dramatically expanded programs and services, which more than doubled our budget and exacerbated the challenges. After having created & filled 4 new admin positions, implementing new procedures, and investing in project management software, we are now on track to be ahead of our deadlines for 2022.
Show full finding ▾Hide full finding ▴2021-002 (2020-002) ? FEDERAL REPORTING COMPLIANCEType of Finding: (E, F) ? Significant Deficiency in Internal Control Over Compliance of Federal Awards and Instance of Non-Compliance Related to Federal AwardsFunding Agency: U.S. Department of Health and Human ServicesTitle: Transitional Living for Homeless YouthAL #: 93.550Award #: 90CX717704, 90CX717703C3Award Period: September 30, 2020 ? September 29, 2021Estimated Questioned Costs: NoneStatement of ConditionDuring testing of the Federal Financial Reporting requirements of major program 93.550, for periods ending during fiscal year 2021, the following reports were submitted after the deadline: See Schedule of Findings and Questioned Costs for chart/tableCriteriaPer grant awards:? The submission of interim FFRs will be on a quarterly, semi-annual, or annual basis, as directed by the Federal agency. A final FFR shall be submitted at the completion of the award agreement. The following reporting period end dates shall be used for interim reports: 3/31, 6/30, 9/30, or 12/31. For final FFRs, the reporting period end date shall be the end date of the project or grant period.? Quarterly and semi-annual interim reports shall be submitted no later than 30 days after the end of each reporting period. Annual reports shall be submitted no later than 90 days after the end of each reporting period. Final reports shall be submitted no later than 90 days after the project or grant period end date.CauseDreamTree Project experienced substantial growth in 2020 and 2021, while keeping a similar number of administrative staff. This caused the reporting deadlines to be missed.EffectDreamTree Project, Inc. is not in compliance with grant reporting requirements and could jeopardize future federal funding.RecommendationDreamTree Project, Inc. should implement procedures and controls to ensure that the federal reports are completed and submitted prior to the deadline. Such as setting up a tracker for all the required reports, by grant, with deadlines and calendar reminders prior to the deadline.View of Responsible Official and Corrective Action PlanDreamTree Project, Inc. had experienced steady growth through 2019, which created a challenge for our administrative team. In 2020 and 2021, we dramatically expanded programs and services, which more than doubled our budget and exacerbated the challenges. After having created & filled 4 new admin positions, implementing new procedures, and investing in project management software, we are now on track to be ahead of our deadlines for 2022.
View of Responsible Official and Corrective Action PlanDreamTree Project, Inc. had experienced steady growth through 2019, which created a challenge for our administrative team. In 2020 and 2021, we dramatically expanded programs and services, which more than doubled our budget and exacerbated the challenges. After having created & filled 4 new admin positions, implementing new procedures, and investing in project management software, we are now on track to be ahead of our deadlines for 2022. ShayAnn Golden Eagle, Finance Director, is responsible for the resolution of this finding.
2020-002
FAC accepted this audit on May 10, 2022 — management decision was due November 10, 2022.
2020-001 ? LATE DATA COLLECTION FORMType of Finding: (F) ? Instance of Non-Compliance Related to Federal AwardsFunding Agency: AllTitle: AllAL #: AllAward #: AllAward Period: All periodsEstimated Questioned Costs: NoneStatement of ConditionDreamTree Project, Inc. has submitted the Data Collection Form after the required due date.CriteriaThe audit shall be completed and the data collection form and reporting package shall be electronically transmitted within the earlier of 30 days after receipt of the auditor's reports, or nine months after the end of the audit period. If the due date falls on a Saturday, Sunday, or Federal holiday, the reporting package is due the next business day (2 CFR 200.512(a)). However, due to the extension issued by the OMB DreamTree Project, Inc.?s deadline with extension was March 31, 2022.Per the Executive Office of the President Office of Management and Budget Memorandum #M-21-20 For the Heads of Executive Departments and Agencies on March 19, 2021: Awarding agencies, in their capacity as cognizant or oversight agencies for audit, should allow recipients and subrecipients that have not yet filed their single audits with the Federal Audit Clearinghouse as of the date of the issuance of this memorandum that have fiscal year-ends through June 30, 2021, to delay the completion and submission of the Single Audit reporting package, as required under Subpart F of 2 CFR ?200.501 to six months beyond the normal due date.CauseDreamTree Project, Inc. was unable to submit the December 31, 2020 Data Collection Form and reporting package on a timely basis as they changed fiscal year periods which delayed the completion of the previous period. This also caused a delay in preparing for the fiscal year 2020 audit.EffectDreamTree Project, Inc. is not in compliance with Federal Award data collection form requirements and could jeopardize future federal funding.RecommendationDreamTree Project, Inc. should implement procedures and controls to ensure that all future audit reports and data collection forms are completed in a timely manner.
Show full finding ▾Hide full finding ▴2020-001 ? LATE DATA COLLECTION FORMType of Finding: (F) ? Instance of Non-Compliance Related to Federal AwardsFunding Agency: AllTitle: AllAL #: AllAward #: AllAward Period: All periodsEstimated Questioned Costs: NoneStatement of ConditionDreamTree Project, Inc. has submitted the Data Collection Form after the required due date.CriteriaThe audit shall be completed and the data collection form and reporting package shall be electronically transmitted within the earlier of 30 days after receipt of the auditor's reports, or nine months after the end of the audit period. If the due date falls on a Saturday, Sunday, or Federal holiday, the reporting package is due the next business day (2 CFR 200.512(a)). However, due to the extension issued by the OMB DreamTree Project, Inc.?s deadline with extension was March 31, 2022.Per the Executive Office of the President Office of Management and Budget Memorandum #M-21-20 For the Heads of Executive Departments and Agencies on March 19, 2021: Awarding agencies, in their capacity as cognizant or oversight agencies for audit, should allow recipients and subrecipients that have not yet filed their single audits with the Federal Audit Clearinghouse as of the date of the issuance of this memorandum that have fiscal year-ends through June 30, 2021, to delay the completion and submission of the Single Audit reporting package, as required under Subpart F of 2 CFR ?200.501 to six months beyond the normal due date.CauseDreamTree Project, Inc. was unable to submit the December 31, 2020 Data Collection Form and reporting package on a timely basis as they changed fiscal year periods which delayed the completion of the previous period. This also caused a delay in preparing for the fiscal year 2020 audit.EffectDreamTree Project, Inc. is not in compliance with Federal Award data collection form requirements and could jeopardize future federal funding.RecommendationDreamTree Project, Inc. should implement procedures and controls to ensure that all future audit reports and data collection forms are completed in a timely manner.
Significant program expansion and change of fiscal year end created a backlog for our administrative team. DreamTree Project, Inc. has hired additional administrative staff and implemented procedures, including project management software, to ensure that 2021 and future audit reports and data collection forms are completed on time. Catherine Hummel, Executive Director is responsible for the resolution of this finding.
2020-002 ? FEDERAL REPORTING COMPLIANCEType of Finding: (E, F) ? Significant Deficiency in Internal Control Over Compliance of Federal Awards and Instance of Non-Compliance Related to Federal AwardsFunding Agency: U.S. Department of Health and Human ServicesTitle: Transitional Living for Homeless YouthAL #: 93.550Award #: 90CX717703, 90CX717704Award Period: September 30, 2019 ? September 29, 2020 and September 30, 2020 ? September 29, 2021Estimated Questioned Costs: NoneStatement of ConditionDuring testing of the Federal Financial Reporting requirements of major program 93.550, for periods ending during fiscal year 2020, the following reports were submitted after the deadline:Grant Award # Type of Report Period Ending Due Date Submission Date90CX717703 Quarterly SF-425 3/31/2020 4/30/2020 5/6/202090CX717703 Quarterly SF-425 6/30/2020 7/30/2020 8/24/202090CX717703 Quarterly SF-425 9/30/2020 10/30/2020 12/24/202090CX717703 Semi-Annual SF-425 3/31/2020 4/30/2020 5/6/202090CX717703 Semi-Annual SF-425 9/30/2020 10/30/2020 2/9/202190CX717703 Annual SF-425 9/29/2020 12/30/2020 2/9/202190CX717704 Quarterly SF-425 12/31/2020 1/30/2021 2/8/2021CriteriaPer both the 2020 and 2021 grant awards:The submission of interim FFRs will be on a quarterly, semi-annual, or annual basis, as directed by the Federal agency. A final FFR shall be submitted at the completion of the award agreement. The following reporting period end dates shall be used for interim reports: 3/31, 6/30, 9/30, or 12/31. For final FF Rs, the reporting period end date shall be the end date of the project or grant period.Quarterly and semi-annual interim reports shall be submitted no later than 30 days after the end of each reporting period. Annual reports shall be submitted no later than 90 days after the end of each reporting period. Final reports shall be submitted no later than 90 days after the project or grant period end date.CauseDreamTree Project experienced substantial growth in 2020 and 2021, while keeping a similar number of administrative staff. This caused the reporting deadlines to be missed.EffectDreamTree Project, Inc. is not in compliance with grant reporting requirements and could jeopardize future federal funding.RecommendationDreamTree Project, Inc. should implement procedures and controls to ensure that the federal reports are completed and submitted prior to the deadline. Such as setting up a tracker for all the required reports, by grant, with deadlines and calendar reminders prior to the deadline.
Show full finding ▾Hide full finding ▴2020-002 ? FEDERAL REPORTING COMPLIANCEType of Finding: (E, F) ? Significant Deficiency in Internal Control Over Compliance of Federal Awards and Instance of Non-Compliance Related to Federal AwardsFunding Agency: U.S. Department of Health and Human ServicesTitle: Transitional Living for Homeless YouthAL #: 93.550Award #: 90CX717703, 90CX717704Award Period: September 30, 2019 ? September 29, 2020 and September 30, 2020 ? September 29, 2021Estimated Questioned Costs: NoneStatement of ConditionDuring testing of the Federal Financial Reporting requirements of major program 93.550, for periods ending during fiscal year 2020, the following reports were submitted after the deadline:Grant Award # Type of Report Period Ending Due Date Submission Date90CX717703 Quarterly SF-425 3/31/2020 4/30/2020 5/6/202090CX717703 Quarterly SF-425 6/30/2020 7/30/2020 8/24/202090CX717703 Quarterly SF-425 9/30/2020 10/30/2020 12/24/202090CX717703 Semi-Annual SF-425 3/31/2020 4/30/2020 5/6/202090CX717703 Semi-Annual SF-425 9/30/2020 10/30/2020 2/9/202190CX717703 Annual SF-425 9/29/2020 12/30/2020 2/9/202190CX717704 Quarterly SF-425 12/31/2020 1/30/2021 2/8/2021CriteriaPer both the 2020 and 2021 grant awards:The submission of interim FFRs will be on a quarterly, semi-annual, or annual basis, as directed by the Federal agency. A final FFR shall be submitted at the completion of the award agreement. The following reporting period end dates shall be used for interim reports: 3/31, 6/30, 9/30, or 12/31. For final FF Rs, the reporting period end date shall be the end date of the project or grant period.Quarterly and semi-annual interim reports shall be submitted no later than 30 days after the end of each reporting period. Annual reports shall be submitted no later than 90 days after the end of each reporting period. Final reports shall be submitted no later than 90 days after the project or grant period end date.CauseDreamTree Project experienced substantial growth in 2020 and 2021, while keeping a similar number of administrative staff. This caused the reporting deadlines to be missed.EffectDreamTree Project, Inc. is not in compliance with grant reporting requirements and could jeopardize future federal funding.RecommendationDreamTree Project, Inc. should implement procedures and controls to ensure that the federal reports are completed and submitted prior to the deadline. Such as setting up a tracker for all the required reports, by grant, with deadlines and calendar reminders prior to the deadline.
DreamTree Project, Inc. had experienced steady growth through 2019, which created a challenge for our administrative team. In 2020 and 2021, we dramatically expanded programs and services, which more than doubled our budget and exacerbated the challenges. After having created & filled 4 new admin positions, implementing new procedures, and investing in project management software, we are now on track to be ahead of our deadlines for 2022. ShayAnn Golden Eagle, Finance Director is responsible for the resolution of this finding.
FAC accepted this audit on January 19, 2021 — management decision was due July 19, 2021.
Data source: This information comes from the Federal Audit Clearinghouse, the official repository of Single Audit data. All data is public domain. Verify this organization's audit history at fac.gov.
Browse other Single Audit organizations in New Mexico →
Track your findings and corrective action plans across audit cycles.
Start tracking findings →Monitor subrecipient audit findings and filing records.
Start monitoring →© 2026 Single Audit Intelligence. All data is public domain.