← Back to home

City of Sweetwater, FloridaLocal Government

EIN: 596002299

UEI: S8EVLUGN85U5

Audited by: GEMRT CPA

Oversight agency: 21 [Department of the Treasury]

View federal awards & risk assessment →

Data as of August 28, 2026

City of Sweetwater, Florida6 audit years5 findings3 repeat
6
Audit Years
5
Total Findings
3
Repeat Findings
$4.1M
Federal Awards Expended (FY 2024)

FY 2024-09-30

$4,075,833 federal awards expended

Management decision deadline — for entities that funded this organization

The FAC accepted this audit on December 24, 2025. Under 2 CFR 200.521(d), a pass-through entity that provided federal funds to this organization for this audit period must issue a management decision on these findings by June 24, 2026 (68 days ago).

What is a management decision? →
2024-003
Reporting
SIGNIFICANT DEFICIENCYREPEAT OF 2023-003

Criteria or Specific Requirement 2 CFR 200.328 and 31 CFR section 35.4(c) requires submission of quarterly and annual project and expenditure reports which are due to the Department of Treasury 30 days after the end of each quarter and April 30th, of the year proceeding, respectively. The project and expenditure report contains specific instructions on how to complete the report. Within the project and expenditure report, ‘Expenditure Categories’ is a critical component to be completed by reporting “obligations” and “expenditures” on each project. As defined in the report, “obligation” is an order placed (such as a contract) and similar transactions that require payment; “expenditure” is when the service has been rendered or the good has been delivered to the entity, and payment is due. Condition Upon review and testing of the quarterly reports as submitted to the Department of Treasury, it was noted that amounts reported as expenditures for certain projects included amounts that were obligated but not yet incurred (service was not yet rendered or the good was not yet received) until a subsequent quarter. The expenditures as reported were allowable expenditures, but the timing of the expenditures was reported in the incorrect period. Cause The Grants Administrator’s lack of understanding of the proper manner in which the obligations and expenditures are required to be reported in the quarterly reports resulted in expenditure amounts being reported in the incorrect quarters. The City’s year-end procedures did not identify certain necessary adjustments in a timely manner in order to remove capital outlay expenditures that were incorrectly included in the unadjusted schedule of expenditures of federal awards. The Grants Administrator utilized the original amounts recorded as expenditures in the accounting system to prepare the quarterly reports. Expenditures should be recorded in the City’s general ledger utilizing the date services are rendered and/or goods are received. Proper monthly review of the expenditure accounts should have led to identifying expenditures that were recorded but not yet incurred. Effect or Potential Effect The condition listed above resulted in differences between expenditure amounts as correctly adjusted and reported in the schedule of expenditures of federal awards, versus expenditure amounts as reported and submitted to the Department of Treasury in the quarterly reports. Future and final reports may be incorrectly completed if obligation amounts and expenditure amounts are not following the criteria to properly enter amounts in the quarterly reports. Questioned Costs None. Context During compliance testing of the reporting compliance requirement, it was noted that the total expenditures included in the schedule of expenditures of federal awards for the fiscal year ended September 30, 2024 did not agree to the total expenditures reported in the quarterly expenditure reports as submitted to the Department of Treasury for the same period. Repeat Finding This is a variation of a prior year finding from 2022 and 2023. See summary schedule of prior audit findings. Recommendation The Grants Administrator and Finance Department should prepare a reconciliation of the expenditures as reported in the schedule of expenditures of federal awards for the major Federal program for the fiscal year ended September 30, 2024, as well as expenditures incurred from October 1, 2024 through today, and compare to the expenditures as reported in all quarterly reports through September 30, 2024 and September 30, 2025. An analysis should be completed to determine the differences between the expenditures incurred by quarter versus expenditures as reported by quarter, and to determine the differences in total between expenditures incurred and expenditures reported in the quarterly and annual project and expenditure reports. The Grants Administrator should then review the Department of Treasury’s Project and Expenditure Report User Guide of State and Local Fiscal Recovery Funds, and/or contact the grantor, to determine if reports as previously submitted should be corrected for the timing difference, or to determine what the correct course of action should be.

Show full finding ▾
Full finding narrative

Criteria or Specific Requirement 2 CFR 200.328 and 31 CFR section 35.4(c) requires submission of quarterly and annual project and expenditure reports which are due to the Department of Treasury 30 days after the end of each quarter and April 30th, of the year proceeding, respectively. The project and expenditure report contains specific instructions on how to complete the report. Within the project and expenditure report, ‘Expenditure Categories’ is a critical component to be completed by reporting “obligations” and “expenditures” on each project. As defined in the report, “obligation” is an order placed (such as a contract) and similar transactions that require payment; “expenditure” is when the service has been rendered or the good has been delivered to the entity, and payment is due. Condition Upon review and testing of the quarterly reports as submitted to the Department of Treasury, it was noted that amounts reported as expenditures for certain projects included amounts that were obligated but not yet incurred (service was not yet rendered or the good was not yet received) until a subsequent quarter. The expenditures as reported were allowable expenditures, but the timing of the expenditures was reported in the incorrect period. Cause The Grants Administrator’s lack of understanding of the proper manner in which the obligations and expenditures are required to be reported in the quarterly reports resulted in expenditure amounts being reported in the incorrect quarters. The City’s year-end procedures did not identify certain necessary adjustments in a timely manner in order to remove capital outlay expenditures that were incorrectly included in the unadjusted schedule of expenditures of federal awards. The Grants Administrator utilized the original amounts recorded as expenditures in the accounting system to prepare the quarterly reports. Expenditures should be recorded in the City’s general ledger utilizing the date services are rendered and/or goods are received. Proper monthly review of the expenditure accounts should have led to identifying expenditures that were recorded but not yet incurred. Effect or Potential Effect The condition listed above resulted in differences between expenditure amounts as correctly adjusted and reported in the schedule of expenditures of federal awards, versus expenditure amounts as reported and submitted to the Department of Treasury in the quarterly reports. Future and final reports may be incorrectly completed if obligation amounts and expenditure amounts are not following the criteria to properly enter amounts in the quarterly reports. Questioned Costs None. Context During compliance testing of the reporting compliance requirement, it was noted that the total expenditures included in the schedule of expenditures of federal awards for the fiscal year ended September 30, 2024 did not agree to the total expenditures reported in the quarterly expenditure reports as submitted to the Department of Treasury for the same period. Repeat Finding This is a variation of a prior year finding from 2022 and 2023. See summary schedule of prior audit findings. Recommendation The Grants Administrator and Finance Department should prepare a reconciliation of the expenditures as reported in the schedule of expenditures of federal awards for the major Federal program for the fiscal year ended September 30, 2024, as well as expenditures incurred from October 1, 2024 through today, and compare to the expenditures as reported in all quarterly reports through September 30, 2024 and September 30, 2025. An analysis should be completed to determine the differences between the expenditures incurred by quarter versus expenditures as reported by quarter, and to determine the differences in total between expenditures incurred and expenditures reported in the quarterly and annual project and expenditure reports. The Grants Administrator should then review the Department of Treasury’s Project and Expenditure Report User Guide of State and Local Fiscal Recovery Funds, and/or contact the grantor, to determine if reports as previously submitted should be corrected for the timing difference, or to determine what the correct course of action should be.

Corrective Action Plan

Views of Responsible Officials and Planned Corrective Actions The Grants Administrator and the Finance Department is working closely to compare all expenditures incurred by quarter to the expenditures as reported to the grantor in the quarterly reports. The Grants Administrator and Finance Department have been working to make any corrections necessary for reporting purposes and to address the timing and presentation issues of expenditures as incurred versus as reported. Going forward, the Grants Administrator will be more involved in communicating with the Finance Department, at a minimum on a monthly basis, in regard to the reporting of expenditures that are being funded by federal, state, and local awards.

Prior Finding References

2023-003

About Reporting →

FY 2023-09-30

$1,461,438 federal awards expended

FAC accepted this audit on January 15, 2025 — management decision was due July 15, 2025.

2023-002
Reporting
SIGNIFICANT DEFICIENCYREPEAT OF 2022-002

Criteria or Specific Requirement 2 CFR 200.303 requires that non-federal entities receiving federal awards establish and maintain internal control over the federal awards that provides reasonable assurance that the non-federal entity is managing the federal awards in compliance with federal statutes, regulations, and the terms and conditions of the federal awards. One of the objectives of internal control over compliance as found in 2 CFR section 200.1 include that transactions should be properly recorded and accounted for in order to permit the preparation of reliable financial statements and federal reports. Condition This deficiency is related to the financial statements finding 2023-01, as listed in Part II above. The City’s financial statements required material audit adjusting journal entries for the financial statements to be presented in accordance with generally accepted accounting principles (GAAP). The financial statements are required to be the product of a financial reporting system that offers reasonable assurance that management is able to produce financial statements in accordance with GAAP. A portion of the adjustments were related to expenditures which were paid by and applied to funding provided by the ARPA Coronavirus State and Local Fiscal Recovery Funds Program. The issue pertained to the financial statement assertion of cutoff; the expenditures were allowable expenditures in accordance with the federal award requirements. Cause The City’s year-end procedures did not identify certain necessary adjustments in a timely manner in order to remove capital outlay expenditures that were incorrectly recorded during the fiscal year ended September 30, 2023. Effect or Potential Effect Adjusting journal entries were proposed as certain accounts were misstated on the unadjusted financial statements, resulting in expenditures being incorrectly included in the unadjusted schedule of expenditures of federal awards. Questioned Costs None. Context During testing of subsequent disbursements and the potential for unrecorded liabilities and during internal control and compliance testing of the major Federal program, it was noted there were two invoices, amounting to a total of $415,821, recorded within accounts payable as capital outlay expenditures which were improperly recorded in the fiscal year ended September 30, 2023. As evidenced by the invoice date and ship date within the invoices, the equipment was not shipped, and the equipment was not received by the City, until after year-end. The expenditures should be recorded in the fiscal year ended September 30, 2024. Repeat Finding This is a variation of a prior year finding from 2022. See summary schedule of prior audit findings. Recommendation Management should ensure year-end closing procedures are completed in a timely manner and are sufficient to assure accounts and financial statements are prepared in accordance with GAAP. Management should assess the risk associated with this condition and identify any additional processes that can be incorporated into their existing controls to improve the deficiency; such as, minimizing the likelihood of year-end material audit adjustments through review of transactions and balances for general propriety and accuracy within one month after year-end. Follow-up and inquiries can be made timely for any transactions for which proper recording is unclear to management, if any. The Grants Administrator should maintain an up-to-date listing of expenditures by award (for all federal, state, and local awards) and should communicate with the Finance Department on a monthly basis to review the listing and determine the proper period in which the expenditures should be recorded and presented.

Show full finding ▾
Full finding narrative

Criteria or Specific Requirement 2 CFR 200.303 requires that non-federal entities receiving federal awards establish and maintain internal control over the federal awards that provides reasonable assurance that the non-federal entity is managing the federal awards in compliance with federal statutes, regulations, and the terms and conditions of the federal awards. One of the objectives of internal control over compliance as found in 2 CFR section 200.1 include that transactions should be properly recorded and accounted for in order to permit the preparation of reliable financial statements and federal reports. Condition This deficiency is related to the financial statements finding 2023-01, as listed in Part II above. The City’s financial statements required material audit adjusting journal entries for the financial statements to be presented in accordance with generally accepted accounting principles (GAAP). The financial statements are required to be the product of a financial reporting system that offers reasonable assurance that management is able to produce financial statements in accordance with GAAP. A portion of the adjustments were related to expenditures which were paid by and applied to funding provided by the ARPA Coronavirus State and Local Fiscal Recovery Funds Program. The issue pertained to the financial statement assertion of cutoff; the expenditures were allowable expenditures in accordance with the federal award requirements. Cause The City’s year-end procedures did not identify certain necessary adjustments in a timely manner in order to remove capital outlay expenditures that were incorrectly recorded during the fiscal year ended September 30, 2023. Effect or Potential Effect Adjusting journal entries were proposed as certain accounts were misstated on the unadjusted financial statements, resulting in expenditures being incorrectly included in the unadjusted schedule of expenditures of federal awards. Questioned Costs None. Context During testing of subsequent disbursements and the potential for unrecorded liabilities and during internal control and compliance testing of the major Federal program, it was noted there were two invoices, amounting to a total of $415,821, recorded within accounts payable as capital outlay expenditures which were improperly recorded in the fiscal year ended September 30, 2023. As evidenced by the invoice date and ship date within the invoices, the equipment was not shipped, and the equipment was not received by the City, until after year-end. The expenditures should be recorded in the fiscal year ended September 30, 2024. Repeat Finding This is a variation of a prior year finding from 2022. See summary schedule of prior audit findings. Recommendation Management should ensure year-end closing procedures are completed in a timely manner and are sufficient to assure accounts and financial statements are prepared in accordance with GAAP. Management should assess the risk associated with this condition and identify any additional processes that can be incorporated into their existing controls to improve the deficiency; such as, minimizing the likelihood of year-end material audit adjustments through review of transactions and balances for general propriety and accuracy within one month after year-end. Follow-up and inquiries can be made timely for any transactions for which proper recording is unclear to management, if any. The Grants Administrator should maintain an up-to-date listing of expenditures by award (for all federal, state, and local awards) and should communicate with the Finance Department on a monthly basis to review the listing and determine the proper period in which the expenditures should be recorded and presented.

Corrective Action Plan

Views of Responsible Officials and Planned Corrective Actions The Deputy Finance Director and the Finance Department identified the transactions as potentially being incorrectly recorded; however, it was not identified timely and/or officially addressed, and was not detected by the Grants Administrator as being recorded in the incorrect period. The Deputy Finance Director and Finance Department were working diligently to review the accounting and handle various tasks, but were not able to timely address the issue with the specific transactions mentioned above. During June 2023, the City hired a Finance Director which was expected to allow the Deputy Finance Director and staff to improve year-end closing procedures and provide additional support to the Finance Department to ensure controls in place over financial reporting are sufficient. The Grants Administrator will be more involved in communicating with the Finance Department, at a minimum on a monthly basis, as related to reporting of expenditures that are being funded by federal, state, and local awards. Management expects this finding to be fully corrected for fiscal year ended September 30, 2024.

Prior Finding References

2022-002

About Reporting →
2023-003
Reporting
REPEAT OF 2022-003OTHER MATTERS

Criteria or Specific Requirement 2 CFR 200.328 and 31 CFR section 35.4(c) requires submission of quarterly and annual project and expenditure reports which are due to the Department of Treasury 30 days after the end of each quarter and April 30th, of the year proceeding, respectively. The project and expenditure report contains specific instructions on how to complete the report. Within the project and expenditure report, ‘Expenditure Categories’ is a critical component to be completed by reporting “obligations” and “expenditures” on each project. As defined in the report, “obligation” is an order placed (such as a contract) and similar transactions that require payment; “expenditure” is when the service has been rendered or the good has been delivered to the entity, and payment is due. Condition Upon review and testing of the quarterly reports as submitted to the Department of Treasury, it was noted that amounts reported as expenditures for certain projects included amounts that were obligated but not yet incurred (service was not yet rendered or the good was not yet received) until a subsequent quarter. The expenditures as reported were allowable expenditures, but the timing of the expenditures was reported in the incorrect period. In addition, upon testing the expenditures as reported in the unadjusted schedule of expenditures of federal awards (the “schedule”), it was noted that $415,821 was improperly included as expenditures belonging to the fiscal year ended September 30, 2023. The expenditures identified were prematurely recorded in the general ledger since the equipment was not received until after year-end. The City’s schedule of expenditures of federal awards for the fiscal year ended September 30, 2023 required a correction to remove those amounts from the schedule and to add those amounts to the subsequent fiscal year’s schedule. Cause The Grants Administrator’s lack of understanding of the proper manner in which the obligations and expenditures are required to be reported in the quarterly reports resulted in expenditure amounts being reported in the incorrect quarters. The City’s year-end procedures did not identify certain necessary adjustments in a timely manner in order to remove capital outlay expenditures that were incorrectly recorded during the fiscal year ended September 30, 2023 and were incorrectly included in the unadjusted schedule of expenditures of federal awards. The Grants Administrator utilized the amounts recorded as expenditures in the accounting system to prepare the quarterly reports. Expenditures should be recorded in the City’s general ledger utilizing the date services are rendered and/or goods are received. Proper monthly review of the expenditure accounts should have led to identifying expenditures that were recorded but not yet incurred. Effect or Potential Effect The two conditions listed above resulted in differences between expenditure amounts as correctly adjusted and reported in the schedule of expenditures of federal awards, versus expenditure amounts as reported and submitted to the Department of Treasury in the quarterly reports. Future reports may be incorrectly completed if obligation amounts and expenditure amounts are not following the criteria to properly enter amounts in the quarterly reports. Questioned Costs None. Context During compliance testing of the reporting compliance requirement, it was noted that the total expenditures included in the schedule of expenditures of federal awards for the fiscal year ended September 30, 2023 did not agree to the total expenditures reported in the quarterly expenditure reports as submitted to the Department of Treasury for the same period. During testing of disbursements as included in the schedule of expenditures of federal awards for the major Federal program, and during internal control and compliance testing, it was noted there were two disbursements, amounting to a total of $415,821, recorded within accounts payable as capital outlay expenditures which were improperly recorded in the fiscal year ended September 30, 2023 and improperly included in the schedule of expenditures of federal awards. As evidenced by the invoice date and ship date within the invoices, the equipment was not shipped, and the equipment was not received by the City, until after year-end. The expenditures should be recorded and reported in the fiscal year ended September 30, 2023. Adjustments were made accordingly for proper recording, reporting, and presentation in the financial statements and schedule of expenditures of federal awards. Repeat Finding This is a variation of a prior year finding from 2022. See summary schedule of prior audit findings. Recommendation Management should ensure year-end closing procedures are completed in a timely manner and are sufficient to assure accounts and financial statements are prepared in accordance with GAAP. If properly prepared and recorded, the subledgers for expenditures by federal awards will be generated with accurate expenditure amounts for the fiscal year. Management should assess the risk associated with this condition and identify any additional processes that can be incorporated into their existing controls to improve the deficiency; such as, minimizing the likelihood of year-end material audit adjustments through review of transactions and balances for general propriety and accuracy within one month after year-end. Follow-up and inquiries can be made timely for any transactions for which proper recording is unclear to management, if any. The Grants Administrator should maintain an up-to-date listing of expenditures by award (for all federal, state, and local awards) and should communicate with the Finance Department on a monthly basis to review the listing and determine the proper period in which the expenditures should be recorded and presented. The Grants Administrator and Finance Department should prepare a reconciliation of the expenditures as reported in the schedule of expenditures of federal awards for the major Federal program for the fiscal year ended September 30, 2023, as well as expenditures incurred from October 1, 2023 through today, and compare to the expenditures as reported in all quarterly reports through September 30, 2023 and September 30, 2024. An analysis should be completed to determine the differences between the expenditures incurred by quarter versus expenditures as reported by quarter, and to determine the differences in total between expenditures incurred and expenditures reported in the quarterly and annual project and expenditure reports. The Grants Administrator should then review the Department of Treasury’s Project and Expenditure Report User Guide of State and Local Fiscal Recovery Funds, and/or contact the grantor, to determine if reports as previously submitted should be corrected for the timing difference, or to determine what the correct course of action should be.

Show full finding ▾
Full finding narrative

Criteria or Specific Requirement 2 CFR 200.328 and 31 CFR section 35.4(c) requires submission of quarterly and annual project and expenditure reports which are due to the Department of Treasury 30 days after the end of each quarter and April 30th, of the year proceeding, respectively. The project and expenditure report contains specific instructions on how to complete the report. Within the project and expenditure report, ‘Expenditure Categories’ is a critical component to be completed by reporting “obligations” and “expenditures” on each project. As defined in the report, “obligation” is an order placed (such as a contract) and similar transactions that require payment; “expenditure” is when the service has been rendered or the good has been delivered to the entity, and payment is due. Condition Upon review and testing of the quarterly reports as submitted to the Department of Treasury, it was noted that amounts reported as expenditures for certain projects included amounts that were obligated but not yet incurred (service was not yet rendered or the good was not yet received) until a subsequent quarter. The expenditures as reported were allowable expenditures, but the timing of the expenditures was reported in the incorrect period. In addition, upon testing the expenditures as reported in the unadjusted schedule of expenditures of federal awards (the “schedule”), it was noted that $415,821 was improperly included as expenditures belonging to the fiscal year ended September 30, 2023. The expenditures identified were prematurely recorded in the general ledger since the equipment was not received until after year-end. The City’s schedule of expenditures of federal awards for the fiscal year ended September 30, 2023 required a correction to remove those amounts from the schedule and to add those amounts to the subsequent fiscal year’s schedule. Cause The Grants Administrator’s lack of understanding of the proper manner in which the obligations and expenditures are required to be reported in the quarterly reports resulted in expenditure amounts being reported in the incorrect quarters. The City’s year-end procedures did not identify certain necessary adjustments in a timely manner in order to remove capital outlay expenditures that were incorrectly recorded during the fiscal year ended September 30, 2023 and were incorrectly included in the unadjusted schedule of expenditures of federal awards. The Grants Administrator utilized the amounts recorded as expenditures in the accounting system to prepare the quarterly reports. Expenditures should be recorded in the City’s general ledger utilizing the date services are rendered and/or goods are received. Proper monthly review of the expenditure accounts should have led to identifying expenditures that were recorded but not yet incurred. Effect or Potential Effect The two conditions listed above resulted in differences between expenditure amounts as correctly adjusted and reported in the schedule of expenditures of federal awards, versus expenditure amounts as reported and submitted to the Department of Treasury in the quarterly reports. Future reports may be incorrectly completed if obligation amounts and expenditure amounts are not following the criteria to properly enter amounts in the quarterly reports. Questioned Costs None. Context During compliance testing of the reporting compliance requirement, it was noted that the total expenditures included in the schedule of expenditures of federal awards for the fiscal year ended September 30, 2023 did not agree to the total expenditures reported in the quarterly expenditure reports as submitted to the Department of Treasury for the same period. During testing of disbursements as included in the schedule of expenditures of federal awards for the major Federal program, and during internal control and compliance testing, it was noted there were two disbursements, amounting to a total of $415,821, recorded within accounts payable as capital outlay expenditures which were improperly recorded in the fiscal year ended September 30, 2023 and improperly included in the schedule of expenditures of federal awards. As evidenced by the invoice date and ship date within the invoices, the equipment was not shipped, and the equipment was not received by the City, until after year-end. The expenditures should be recorded and reported in the fiscal year ended September 30, 2023. Adjustments were made accordingly for proper recording, reporting, and presentation in the financial statements and schedule of expenditures of federal awards. Repeat Finding This is a variation of a prior year finding from 2022. See summary schedule of prior audit findings. Recommendation Management should ensure year-end closing procedures are completed in a timely manner and are sufficient to assure accounts and financial statements are prepared in accordance with GAAP. If properly prepared and recorded, the subledgers for expenditures by federal awards will be generated with accurate expenditure amounts for the fiscal year. Management should assess the risk associated with this condition and identify any additional processes that can be incorporated into their existing controls to improve the deficiency; such as, minimizing the likelihood of year-end material audit adjustments through review of transactions and balances for general propriety and accuracy within one month after year-end. Follow-up and inquiries can be made timely for any transactions for which proper recording is unclear to management, if any. The Grants Administrator should maintain an up-to-date listing of expenditures by award (for all federal, state, and local awards) and should communicate with the Finance Department on a monthly basis to review the listing and determine the proper period in which the expenditures should be recorded and presented. The Grants Administrator and Finance Department should prepare a reconciliation of the expenditures as reported in the schedule of expenditures of federal awards for the major Federal program for the fiscal year ended September 30, 2023, as well as expenditures incurred from October 1, 2023 through today, and compare to the expenditures as reported in all quarterly reports through September 30, 2023 and September 30, 2024. An analysis should be completed to determine the differences between the expenditures incurred by quarter versus expenditures as reported by quarter, and to determine the differences in total between expenditures incurred and expenditures reported in the quarterly and annual project and expenditure reports. The Grants Administrator should then review the Department of Treasury’s Project and Expenditure Report User Guide of State and Local Fiscal Recovery Funds, and/or contact the grantor, to determine if reports as previously submitted should be corrected for the timing difference, or to determine what the correct course of action should be.

Corrective Action Plan

Views of Responsible Officials and Planned Corrective Actions The Grants Administrator and the Finance Department will work closely to compare all expenditures incurred by quarter to the expenditures as reported to the grantor in the quarterly reports. The Grants Administrator and Finance Department have been working to make any corrections as needed for reporting purposes and to address the timing and presentation issues of expenditures as incurred versus as reported. Going forward, the Grants Administrator will be more involved in communicating with the Finance Department, at a minimum on a monthly basis, as related to the reporting of expenditures that are being funded by federal, state, and local awards.

Prior Finding References

2022-003

About Reporting →

FY 2022-09-30

$3,624,959 federal awards expended

FAC accepted this audit on December 1, 2023 — management decision was due June 1, 2024.

2022-002
Reporting
SIGNIFICANT DEFICIENCY

This deficiency is directly related to the financial statements finding 2022-01, as listed in Part II above. The City’s financial statements required material audit adjusting journal entries for the financial statements to be presented in accordance with generally accepted accounting principles (GAAP). The financial statements are required to be the product of a financial reporting system that offers reasonable assurance that management is able to produce financial statements in accordance with GAAP. The adjustment was related to expenditures which were paid by and applied to funding provided by the ARPA Coronavirus State and Local Fiscal Recovery Funds Program. The issue pertained to the financial statement assertion of cutoff; the expenditures were allowable expenditures in accordance with the federal award requirements. Cause: The City’s year-end procedures did not identify certain necessary adjustments in a timely manner in order to remove capital outlay expenditures that were incorrectly recorded during the fiscal year ended September 30, 2022. Effect or Potential Effect: Adjusting journal entries were proposed as certain accounts were misstated on the unadjusted financial statements, resulting in expenditures being incorrectly included in the unadjusted schedule of expenditures of federal awards. Questioned Costs: None. Context: During testing of subsequent disbursements and the potential for unrecorded liabilities and during internal control and compliance testing of the major Federal program, it was noted there were four invoices, amounting to a total of $549,431, recorded within accounts payable as capital outlay expenditures which were improperly recorded in the fiscal year ended September 30, 2022. As evidenced by the invoice date and ship date within the invoices, the equipment was not shipped, and the equipment was not received by the City, until after year-end. The expenditures should be recorded in the fiscal year ended September 30, 2023. Recommendation: Management should ensure year-end closing procedures are completed in a timely manner and are sufficient to assure accounts and financial statements are prepared in accordance with GAAP. Management should assess the risk associated with this condition and identify any additional processes that can be incorporated into their existing controls to improve the deficiency; such as, minimizing the likelihood of year-end material audit adjustments through review of transactions and balances for general propriety and accuracy within one month after year-end. Follow-up and inquiries can be made timely for any transactions for which proper recording is unclear to management, if any. The Grants Administrator should maintain an up-to-date listing of expenditures by award (for all federal, state, and local awards) and should communicate with the Finance Department on a monthly basis to review the listing and determine the proper period in which the expenditures should be recorded and presented.

Show full finding ▾
Full finding narrative

Criteria or Specific Requirement: 2 CFR 200.303 requires that non-federal entities receiving federal awards establish and maintain internal control over the federal awards that provides reasonable assurance that the non-federal entity is managing the federal awards in compliance with federal statutes, regulations, and the terms and conditions of the federal awards. One of the objectives of internal control over compliance as found in 2 CFR section 200.1 include that transactions should be properly recorded and accounted for in order to permit the preparation of reliable financial statements and federal reports. Condition: This deficiency is directly related to the financial statements finding 2022-01, as listed in Part II above. The City’s financial statements required material audit adjusting journal entries for the financial statements to be presented in accordance with generally accepted accounting principles (GAAP). The financial statements are required to be the product of a financial reporting system that offers reasonable assurance that management is able to produce financial statements in accordance with GAAP. The adjustment was related to expenditures which were paid by and applied to funding provided by the ARPA Coronavirus State and Local Fiscal Recovery Funds Program. The issue pertained to the financial statement assertion of cutoff; the expenditures were allowable expenditures in accordance with the federal award requirements. Cause: The City’s year-end procedures did not identify certain necessary adjustments in a timely manner in order to remove capital outlay expenditures that were incorrectly recorded during the fiscal year ended September 30, 2022. Effect or Potential Effect: Adjusting journal entries were proposed as certain accounts were misstated on the unadjusted financial statements, resulting in expenditures being incorrectly included in the unadjusted schedule of expenditures of federal awards. Questioned Costs: None. Context: During testing of subsequent disbursements and the potential for unrecorded liabilities and during internal control and compliance testing of the major Federal program, it was noted there were four invoices, amounting to a total of $549,431, recorded within accounts payable as capital outlay expenditures which were improperly recorded in the fiscal year ended September 30, 2022. As evidenced by the invoice date and ship date within the invoices, the equipment was not shipped, and the equipment was not received by the City, until after year-end. The expenditures should be recorded in the fiscal year ended September 30, 2023. Recommendation: Management should ensure year-end closing procedures are completed in a timely manner and are sufficient to assure accounts and financial statements are prepared in accordance with GAAP. Management should assess the risk associated with this condition and identify any additional processes that can be incorporated into their existing controls to improve the deficiency; such as, minimizing the likelihood of year-end material audit adjustments through review of transactions and balances for general propriety and accuracy within one month after year-end. Follow-up and inquiries can be made timely for any transactions for which proper recording is unclear to management, if any. The Grants Administrator should maintain an up-to-date listing of expenditures by award (for all federal, state, and local awards) and should communicate with the Finance Department on a monthly basis to review the listing and determine the proper period in which the expenditures should be recorded and presented.

Corrective Action Plan

The Deputy Finance Director and the Finance Department identified the transactions as potentially being incorrectly recorded; however, it was not identified timely and/or officially addressed, and was not detected by the Grants Administrator as being recorded in the incorrect period. At the moment the trial balances and year-end closing procedures were being completed, the City was operating without a Finance Director. The Deputy Finance Director and Finance Department were working diligently to review the accounting and handle various tasks, but were not able to timely address the issue with the specific transactions mentioned above. During June 2023, the City hired a Finance Director which will allow the Deputy Finance Director and staff to improve year-end closing procedures and will provide additional support to the Finance Department to ensure controls in place over financial reporting are sufficient. The Grants Administrator will be more involved in communicating with the Finance Department, at a minimum on a monthly basis, as related to reporting of expenditures that are being funded by federal, state, and local awards.

About Reporting →
2022-003
Reporting
OTHER MATTERS

Upon review and testing of the quarterly reports as submitted to the Department of Treasury, it was noted that amounts reported as expenditures for certain projects included amounts that were obligated but not yet incurred (service was not yet rendered or the good was not yet received) until a subsequent quarter. The expenditures as reported were allowable expenditures, but the timing of the expenditures was reported in the incorrect period. In addition, upon testing the expenditures as reported in the unadjusted schedule of expenditures of federal awards (the “schedule”), it was noted that $549,431 was improperly included as expenditures belonging to the fiscal year ended September 30, 2022. The expenditures identified were prematurely recorded in the general ledger since the equipment was not received until after year-end. The City’s schedule of expenditures of federal awards for the fiscal year ended September 30, 2022 required a correction to remove those amounts from the schedule and to add those amounts to the subsequent fiscal year’s schedule. Cause: The Grants Administrator’s lack of understanding of the proper manner in which the obligations and expenditures are required to be reported in the quarterly reports resulted in expenditure amounts being reported in the incorrect quarters. The City’s year-end procedures did not identify certain necessary adjustments in a timely manner in order to remove capital outlay expenditures that were incorrectly recorded during the fiscal year ended September 30, 2022 and were incorrectly included in the unadjusted schedule of expenditures of federal awards. The Grants Administrator utilized the amounts recorded as expenditures in the accounting system to prepare the quarterly reports. Expenditures should be recorded in the City’s general ledger utilizing the date services are rendered and/or goods are received. Proper monthly review of the expenditure accounts should have led to identifying expenditures that were recorded but not yet incurred. Effect or Potential Effect: The two conditions listed above resulted in differences between expenditure amounts as correctly adjusted and reported in the schedule of expenditures of federal awards, versus expenditure amounts as reported and submitted to the Department of Treasury in the quarterly reports. Future reports may be incorrectly completed if obligation amounts and expenditure amounts are not following the criteria to properly enter amounts in the quarterly reports. Questioned Costs: None. Context: During compliance testing of the reporting compliance requirement, it was noted that the total expenditures included in the schedule of expenditures of federal awards for the fiscal year ended September 30, 2022 did not agree to the total expenditures reported in the quarterly expenditure reports as submitted to the Department of Treasury for the same period. During testing of disbursements as included in the schedule of expenditures of federal awards for the major Federal program, and during internal control and compliance testing, from a total of forty-five disbursements it was noted there were four disbursements, amounting to a total of $549,431, recorded within accounts payable as capital outlay expenditures which were improperly recorded in the fiscal year ended September 30, 2022 and improperly included in the schedule of expenditures of federal awards. As evidenced by the invoice date and ship date within the invoices, the equipment was not shipped, and the equipment was not received by the City, until after year-end. The expenditures should be recorded and reported in the fiscal year ended September 30, 2023. Adjustments were made accordingly for proper recording, reporting, and presentation in the financial statements and schedule of expenditures of federal awards. Recommendation: Management should ensure year-end closing procedures are completed in a timely manner and are sufficient to assure accounts and financial statements are prepared in accordance with GAAP. If properly prepared and recorded, the subledgers for expenditures by federal awards will be generated with accurate expenditure amounts for the fiscal year. Management should assess the risk associated with this condition and identify any additional processes that can be incorporated into their existing controls to improve the deficiency; such as, minimizing the likelihood of year-end material audit adjustments through review of transactions and balances for general propriety and accuracy within one month after year-end. Follow-up and inquiries can be made timely for any transactions for which proper recording is unclear to management, if any. The Grants Administrator should maintain an up-to-date listing of expenditures by award (for all federal, state, and local awards) and should communicate with the Finance Department on a monthly basis to review the listing and determine the proper period in which the expenditures should be recorded and presented. The Grants Administrator and Finance Department should prepare a reconciliation of the expenditures as reported in the schedule of expenditures of federal awards for the major Federal program for the fiscal year ended September 30, 2022, as well as expenditures incurred from October 1, 2022 through today, and compare to the expenditures as reported in all quarterly reports through September 30, 2023. An analysis should be completed to determine the differences between the expenditures incurred by quarter versus expenditures as reported by quarter, and to determine the differences in total between expenditures incurred and expenditures reported in the quarterly and annual project and expenditure reports. The Grants Administrator should then review the Department of Treasury’s Project and Expenditure Report User Guide of State and Local Fiscal Recovery Funds, and/or contact the grantor, to determine if reports as previously submitted should be corrected for the timing difference, or to determine what the correct course of action should be.

Show full finding ▾
Full finding narrative

Criteria or Specific Requirement: 2 CFR 200.328 and 31 CFR section 35.4(c) requires submission of quarterly and annual project and expenditure reports which are due to the Department of Treasury 30 days after the end of each quarter and April 30th, of the year proceeding, respectively. The project and expenditure report contains specific instructions on how to complete the report. Within the project and expenditure report, ‘Expenditure Categories’ is a critical component to be completed by reporting “obligations” and “expenditures” on each project. As defined in the report, “obligation” is an order placed (such as a contract) and similar transactions that require payment; “expenditure” is when the service has been rendered or the good has been delivered to the entity, and payment is due. Condition: Upon review and testing of the quarterly reports as submitted to the Department of Treasury, it was noted that amounts reported as expenditures for certain projects included amounts that were obligated but not yet incurred (service was not yet rendered or the good was not yet received) until a subsequent quarter. The expenditures as reported were allowable expenditures, but the timing of the expenditures was reported in the incorrect period. In addition, upon testing the expenditures as reported in the unadjusted schedule of expenditures of federal awards (the “schedule”), it was noted that $549,431 was improperly included as expenditures belonging to the fiscal year ended September 30, 2022. The expenditures identified were prematurely recorded in the general ledger since the equipment was not received until after year-end. The City’s schedule of expenditures of federal awards for the fiscal year ended September 30, 2022 required a correction to remove those amounts from the schedule and to add those amounts to the subsequent fiscal year’s schedule. Cause: The Grants Administrator’s lack of understanding of the proper manner in which the obligations and expenditures are required to be reported in the quarterly reports resulted in expenditure amounts being reported in the incorrect quarters. The City’s year-end procedures did not identify certain necessary adjustments in a timely manner in order to remove capital outlay expenditures that were incorrectly recorded during the fiscal year ended September 30, 2022 and were incorrectly included in the unadjusted schedule of expenditures of federal awards. The Grants Administrator utilized the amounts recorded as expenditures in the accounting system to prepare the quarterly reports. Expenditures should be recorded in the City’s general ledger utilizing the date services are rendered and/or goods are received. Proper monthly review of the expenditure accounts should have led to identifying expenditures that were recorded but not yet incurred. Effect or Potential Effect: The two conditions listed above resulted in differences between expenditure amounts as correctly adjusted and reported in the schedule of expenditures of federal awards, versus expenditure amounts as reported and submitted to the Department of Treasury in the quarterly reports. Future reports may be incorrectly completed if obligation amounts and expenditure amounts are not following the criteria to properly enter amounts in the quarterly reports. Questioned Costs: None. Context: During compliance testing of the reporting compliance requirement, it was noted that the total expenditures included in the schedule of expenditures of federal awards for the fiscal year ended September 30, 2022 did not agree to the total expenditures reported in the quarterly expenditure reports as submitted to the Department of Treasury for the same period. During testing of disbursements as included in the schedule of expenditures of federal awards for the major Federal program, and during internal control and compliance testing, from a total of forty-five disbursements it was noted there were four disbursements, amounting to a total of $549,431, recorded within accounts payable as capital outlay expenditures which were improperly recorded in the fiscal year ended September 30, 2022 and improperly included in the schedule of expenditures of federal awards. As evidenced by the invoice date and ship date within the invoices, the equipment was not shipped, and the equipment was not received by the City, until after year-end. The expenditures should be recorded and reported in the fiscal year ended September 30, 2023. Adjustments were made accordingly for proper recording, reporting, and presentation in the financial statements and schedule of expenditures of federal awards. Recommendation: Management should ensure year-end closing procedures are completed in a timely manner and are sufficient to assure accounts and financial statements are prepared in accordance with GAAP. If properly prepared and recorded, the subledgers for expenditures by federal awards will be generated with accurate expenditure amounts for the fiscal year. Management should assess the risk associated with this condition and identify any additional processes that can be incorporated into their existing controls to improve the deficiency; such as, minimizing the likelihood of year-end material audit adjustments through review of transactions and balances for general propriety and accuracy within one month after year-end. Follow-up and inquiries can be made timely for any transactions for which proper recording is unclear to management, if any. The Grants Administrator should maintain an up-to-date listing of expenditures by award (for all federal, state, and local awards) and should communicate with the Finance Department on a monthly basis to review the listing and determine the proper period in which the expenditures should be recorded and presented. The Grants Administrator and Finance Department should prepare a reconciliation of the expenditures as reported in the schedule of expenditures of federal awards for the major Federal program for the fiscal year ended September 30, 2022, as well as expenditures incurred from October 1, 2022 through today, and compare to the expenditures as reported in all quarterly reports through September 30, 2023. An analysis should be completed to determine the differences between the expenditures incurred by quarter versus expenditures as reported by quarter, and to determine the differences in total between expenditures incurred and expenditures reported in the quarterly and annual project and expenditure reports. The Grants Administrator should then review the Department of Treasury’s Project and Expenditure Report User Guide of State and Local Fiscal Recovery Funds, and/or contact the grantor, to determine if reports as previously submitted should be corrected for the timing difference, or to determine what the correct course of action should be.

Corrective Action Plan

The Grants Administrator and the Finance Department will work closely to compare all expenditures incurred by quarter to the expenditures as reported to the grantor in the quarterly reports. The Grants Administrator will contact the grantor to determine if any corrections are requested for any reports previously submitted to address the timing and presentation issues of expenditures as incurred versus as reported. Going forward, the Grants Administrator will be more involved in communicating with the Finance Department, at a minimum on a monthly basis, as related to the reporting of expenditures that are being funded by federal, state, and local awards.

About Reporting →

FY 2021-09-30

$1,737,716 federal awards expendedNo findings recorded this year

FAC accepted this audit on January 24, 2023 — management decision was due July 24, 2023.

FY 2019-09-30

$1,013,930 federal awards expendedNo findings recorded this year

FAC accepted this audit on October 12, 2020 — management decision was due April 12, 2021.

FY 2018-09-30

$764,348 federal awards expendedNo findings recorded this year

FAC accepted this audit on October 27, 2019 — management decision was due April 27, 2020.

Data source: This information comes from the Federal Audit Clearinghouse, the official repository of Single Audit data. All data is public domain. Verify this organization's audit history at fac.gov.

Browse other Single Audit organizations in Florida

Are you this organization?

Track your findings and corrective action plans across audit cycles.

Start tracking findings →

Do you fund this organization?

Monitor subrecipient audit findings and filing records.

Start monitoring →

Product

Resources

Legal

Single Audit Intelligence is an independent tool powered by Federal Audit Clearinghouse data. Not affiliated with GSA, OMB, or any federal agency.

© 2026 Single Audit Intelligence. All data is public domain.