La Porte Community School Corporation5 audit years27 findings6 repeat
5
Audit Years
27
Total Findings
6
Repeat Findings
$25.7M
Federal Awards Expended (FY 2024)

FY 2024-06-30

ADVERSE OPINION, NON-GAAP BASISMATERIAL NONCOMPLIANCE DISCLOSED$25,723,998 federal awards expended

Management decision deadline — for entities that funded this organization

The FAC accepted this audit on March 11, 2025. Under 2 CFR 200.521(d), a pass-through entity that provided federal funds to this organization for this audit period must issue a management decision on these findings by September 11, 2025 (352 days ago).

What is a management decision? →
2024-003
Matching, Level of Effort, Earmarking
SIGNIFICANT DEFICIENCYREPEAT OF 2022-005OTHER MATTERS

FINDING 2024-003 Subject: Special Education Cluster (IDEA) - Earmarking Federal Agency: Department of Education Federal Program: Special Education Grants to States Assistance Listings Number: 84.027 Federal Award Number and Year (or Other Identifying Number): 22611-053-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Matching, Level of Effort, Earmarking Audit Findings: Significant Deficiency, Other Matters INDIANA STATE BOARD OF ACCOUNTS 21 LA PORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Repeat Finding This is a repeat finding from the immediately prior audit report. The prior audit finding number was 2022-005. Condition and Context The School Corporation is a member of the South La Porte County Special Education (Cooperative). During fiscal year 2022-2023, the Cooperative operated the special education program and spent the federal money on behalf of all its members. As the grant agreement was between the Indiana Department of Education (IDOE) and each member school, the School Corporation was responsible for ensuring and providing oversight of the Cooperative. The School Corporation did not have internal controls in place to ensure that the Cooperative complied with the earmarking requirements. The Cooperative did not have adequate procedures in place to ensure that the required level of expenditures for nonpublic school students with disabilities was met for each member school. The Cooperative did not have effective internal controls to ensure nonpublic school expenditures were appropriately identified and reported. Due to the timing of the Cooperative's corrective action, the nonpublic expenditures spent did not meet the earmarking requirements for grant award number 22611-053-PN01. From the beginning of the grant awards until March 2023, total grant expenditures were posted as expended. The nonpublic proportionate share expenditures were determined by applying a percentage to the nonpublic school budgeted expenditures. Beginning in March 2023, the Cooperative began tracking expenditures by member school for the nonpublic services. As such, we were unable to identify if the minimum amount per the grant award was expended and properly reported to the IDOE from the beginning of the grant awards through March 2023, as required. The lack of internal controls and noncompliance was isolated to 22611-053-PN01 grant award. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: . . . (g) Be adequately documented. . . ." INDIANA STATE BOARD OF ACCOUNTS 22 LA PORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 511 IAC 7-34-7(b) states: "The public agency, in providing special education and related services to students in nonpublic schools must expend at least an amount that is the same proportion of the public agency total subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities, who are enrolled by their parents in nonpublic schools within its boundaries, is to the total number of students with disabilities of the same age range." Cause Through management inquiry, they were unaware of the requirements to track nonpublic proportionate share expenditures directly for each member school. While the Cooperative did implement new processes and procedures to ensure expenditures were tracked by member school starting in March 2023, most of the grant award had been allocated to the member schools based on a percentage of the budget. Effect Without the proper implementation of an effectively designed system of internal controls, the Cooperative was unable to track expenditures for nonpublic services for each member school. Consequently, the amounts requested for reimbursement were not supported by actual expenditures, but rather a percentage based on the budget per member school. Because of this, expenditures were not accurately reported to the oversight agency. Questioned Costs There were no questioned costs identified. Recommendation Management of the Cooperative should develop written policies and procedures which would require tracking of actual nonpublic proportionate share expenditures by member school. Documentation should be maintained to show how these expenditures are being tracked to ensure compliance with the Earmarking requirements. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Show full finding ▾
Full finding narrative

FINDING 2024-003 Subject: Special Education Cluster (IDEA) - Earmarking Federal Agency: Department of Education Federal Program: Special Education Grants to States Assistance Listings Number: 84.027 Federal Award Number and Year (or Other Identifying Number): 22611-053-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Matching, Level of Effort, Earmarking Audit Findings: Significant Deficiency, Other Matters INDIANA STATE BOARD OF ACCOUNTS 21 LA PORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Repeat Finding This is a repeat finding from the immediately prior audit report. The prior audit finding number was 2022-005. Condition and Context The School Corporation is a member of the South La Porte County Special Education (Cooperative). During fiscal year 2022-2023, the Cooperative operated the special education program and spent the federal money on behalf of all its members. As the grant agreement was between the Indiana Department of Education (IDOE) and each member school, the School Corporation was responsible for ensuring and providing oversight of the Cooperative. The School Corporation did not have internal controls in place to ensure that the Cooperative complied with the earmarking requirements. The Cooperative did not have adequate procedures in place to ensure that the required level of expenditures for nonpublic school students with disabilities was met for each member school. The Cooperative did not have effective internal controls to ensure nonpublic school expenditures were appropriately identified and reported. Due to the timing of the Cooperative's corrective action, the nonpublic expenditures spent did not meet the earmarking requirements for grant award number 22611-053-PN01. From the beginning of the grant awards until March 2023, total grant expenditures were posted as expended. The nonpublic proportionate share expenditures were determined by applying a percentage to the nonpublic school budgeted expenditures. Beginning in March 2023, the Cooperative began tracking expenditures by member school for the nonpublic services. As such, we were unable to identify if the minimum amount per the grant award was expended and properly reported to the IDOE from the beginning of the grant awards through March 2023, as required. The lack of internal controls and noncompliance was isolated to 22611-053-PN01 grant award. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: . . . (g) Be adequately documented. . . ." INDIANA STATE BOARD OF ACCOUNTS 22 LA PORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 511 IAC 7-34-7(b) states: "The public agency, in providing special education and related services to students in nonpublic schools must expend at least an amount that is the same proportion of the public agency total subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities, who are enrolled by their parents in nonpublic schools within its boundaries, is to the total number of students with disabilities of the same age range." Cause Through management inquiry, they were unaware of the requirements to track nonpublic proportionate share expenditures directly for each member school. While the Cooperative did implement new processes and procedures to ensure expenditures were tracked by member school starting in March 2023, most of the grant award had been allocated to the member schools based on a percentage of the budget. Effect Without the proper implementation of an effectively designed system of internal controls, the Cooperative was unable to track expenditures for nonpublic services for each member school. Consequently, the amounts requested for reimbursement were not supported by actual expenditures, but rather a percentage based on the budget per member school. Because of this, expenditures were not accurately reported to the oversight agency. Questioned Costs There were no questioned costs identified. Recommendation Management of the Cooperative should develop written policies and procedures which would require tracking of actual nonpublic proportionate share expenditures by member school. Documentation should be maintained to show how these expenditures are being tracked to ensure compliance with the Earmarking requirements. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Corrective Action Plan

FINDING 2024-003 Finding Subject: Special Education Cluster (IDEA) - Earmarking Summary of Finding: Lack of Internal Controls in Place to Ensure the Cooperative Complied with Earmarking Requirements The Cooperative did not have adequate procedures in place to ensure that the required level of expenditures for non-public school students with disabilities was net for each member school. The Cooperative did not have effective internal controls to ensure non-public school expenditures were appropriately identified and reported. The non-public proportionate share expenditures were determined by a percentage to the non-public school budgeted expenditures. Beginning in March 2023, the Cooperative began tracking expenditures by member schools for the non-public services. Contact Person Responsible for Corrective Action: Greg Hunt Contact Phone Number: (219) 362-7056 Views of Responsible Official: We concur with the finding. Description of Corrective Action Plan: Corrective actions have already been taken beginning in March 2023. The Cooperative began tracking expenditures by member schools for the non-public services. Anticipated Completion Date: March 2023

Prior Finding References

2022-005

About Matching, Level of Effort, Earmarking →
2024-004
Procurement & Suspension/Debarment
MATERIAL WEAKNESSMODIFIED OPINION

FINDING 2024-004 Subject: Special Education Cluster (IDEA) - Procurement and Suspension and Debarment Federal Agency: Department of Education Federal Program: Special Education Grants to States Assistance Listings Number: 84.027 Federal Award Numbers and Years (or Other Identifying Numbers): 22611-053-PN01, 22611-053-ARP Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Findings: Material Weakness, Modified Opinion INDIANA STATE BOARD OF ACCOUNTS 23 LA PORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Condition and Context The School Corporation is a member of the South La Porte County Special Education Cooperative (Cooperative). The Cooperative operated the special education program and spent the federal money on behalf of all its members. As the grant agreement was between the Indiana Department of Education (IDOE) and each member school, the School Corporation was responsible for ensuring and providing oversight of the Cooperative. Procurement - Small Purchase When the value of the procurement for property or services are within the small purchase threshold, or a lower threshold established by a nonfederal entity, quotes and a contract are required. The small purchase threshold is between $10,000 and $150,000; however, the threshold between $10,000 and $50,000 require quotes from an adequate number of qualified sources. Indiana Code 5-22-8 has more restrictive requirements for the small purchase threshold between $50,000 and $150,000, which require three quotes and a contract to be awarded. In fiscal year 2023, the Cooperative had five vendors which fell within the small purchase threshold and all five vendors were tested. The Cooperative did not obtain quotes or competitive proposals, nor was a circumstance met that would have allowed for a noncompetitive procurement for the purchases. The total amount spent with all five vendors was $292,806. The lack of internal controls and noncompliance was isolated to 2023. Suspension and Debarment Prior to entering into subawards and covered transactions with federal award funds, recipients are required to verify that such contractors and subrecipients are not suspended, debarred, or otherwise excluded. "Covered transactions" include, but are not limited to, contracts for goods and services awarded under a nonprocurement transaction (i.e., grant agreement) that are expected to equal or exceed $25,000. The verification is to be done by checking the SAM exclusions, collecting a certification from that person, or adding a clause or condition to the covered transaction with that person. Six vendors paid from the grant funds were identified as being covered transactions during the audit period. Three vendors each fiscal year provided goods or services which equaled or exceeded $25,000 and were selected for testing. The total amount spent on covered transactions was $266,063 and $142,639 for 2023 and 2024, respectively. For all six vendors, the Cooperative did not verify the vendors' suspension and debarment status prior to payment. The lack of internal controls and noncompliance was isolated to the 22611-053-PN01 and 22611-053-ARP grant awards. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: INDIANA STATE BOARD OF ACCOUNTS 24 LA PORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.320 states in part: "The non-Federal entity must have and use documented procurement procedures, consistent with the standards of this section and §§ 200.317, 200.318, and 200.319 for any of the following methods of procurement used for the acquisition of property or services required under a Federal award or sub-award. (a) Informal procurement methods. When the value of the procurement for property or services under a Federal award does not exceed the simplified acquisition threshold (SAT), as defined in § 200.1, or a lower threshold established by a non-Federal entity, formal procurement methods are not required. The non-Federal entity may use informal procurement methods to expedite the completion of its transactions and minimize the associated administrative burden and cost. The informal methods used for procurement of property or services at or below the SAT include: . . . (2) Small purchases — (i) Small purchase procedures. The acquisition of property or services, the aggregate dollar amount of which is higher than the micro-purchase threshold but does not exceed the simplified acquisition threshold. If small purchase procedures are used, price or rate quotations must be obtained from an adequate number of qualified sources as determined appropriate by the non-Federal entity. . . ." 2 CFR 180.300 states: "When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you intend to do business is not excluded or disqualified. You do this by: (a) Checking the SAM.gov Exclusions, or (b) Collecting a certification from that person, or (c) Adding a clause or condition to the covered transaction with that person." Cause The Cooperative noted they were unaware of the procurement requirements of expenditures within the Small Purchase Threshold and for suspension and debarment. They stated they have used the same vendors to provide professional services for several years but only recently started using federal grant award funds for the services. INDIANA STATE BOARD OF ACCOUNTS 25 LA PORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper implementation of an effectively designed system of internal controls, the Cooperative cannot ensure the vendors paid with federal award funds are procured using the required methods and are not suspended or debarred from receiving federal funds. Without following the required methods for procurement and suspension and debarment, the Cooperative could be overpaying for services or could be paying vendors who are precluded from receiving federal funds. Questioned Costs There were no questioned costs identified. Recommendation Management of the Cooperative should develop written policies and procedures which would require that appropriate procurement methods are used for vendors that are within the Small Purchase Threshold and to ensure vendors are not suspended or debarred. Appropriate documentation should be maintained to ensure compliance with procurement and suspension and debarment. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Show full finding ▾
Full finding narrative

FINDING 2024-004 Subject: Special Education Cluster (IDEA) - Procurement and Suspension and Debarment Federal Agency: Department of Education Federal Program: Special Education Grants to States Assistance Listings Number: 84.027 Federal Award Numbers and Years (or Other Identifying Numbers): 22611-053-PN01, 22611-053-ARP Pass-Through Entity: Indiana Department of Education Compliance Requirement: Procurement and Suspension and Debarment Audit Findings: Material Weakness, Modified Opinion INDIANA STATE BOARD OF ACCOUNTS 23 LA PORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Condition and Context The School Corporation is a member of the South La Porte County Special Education Cooperative (Cooperative). The Cooperative operated the special education program and spent the federal money on behalf of all its members. As the grant agreement was between the Indiana Department of Education (IDOE) and each member school, the School Corporation was responsible for ensuring and providing oversight of the Cooperative. Procurement - Small Purchase When the value of the procurement for property or services are within the small purchase threshold, or a lower threshold established by a nonfederal entity, quotes and a contract are required. The small purchase threshold is between $10,000 and $150,000; however, the threshold between $10,000 and $50,000 require quotes from an adequate number of qualified sources. Indiana Code 5-22-8 has more restrictive requirements for the small purchase threshold between $50,000 and $150,000, which require three quotes and a contract to be awarded. In fiscal year 2023, the Cooperative had five vendors which fell within the small purchase threshold and all five vendors were tested. The Cooperative did not obtain quotes or competitive proposals, nor was a circumstance met that would have allowed for a noncompetitive procurement for the purchases. The total amount spent with all five vendors was $292,806. The lack of internal controls and noncompliance was isolated to 2023. Suspension and Debarment Prior to entering into subawards and covered transactions with federal award funds, recipients are required to verify that such contractors and subrecipients are not suspended, debarred, or otherwise excluded. "Covered transactions" include, but are not limited to, contracts for goods and services awarded under a nonprocurement transaction (i.e., grant agreement) that are expected to equal or exceed $25,000. The verification is to be done by checking the SAM exclusions, collecting a certification from that person, or adding a clause or condition to the covered transaction with that person. Six vendors paid from the grant funds were identified as being covered transactions during the audit period. Three vendors each fiscal year provided goods or services which equaled or exceeded $25,000 and were selected for testing. The total amount spent on covered transactions was $266,063 and $142,639 for 2023 and 2024, respectively. For all six vendors, the Cooperative did not verify the vendors' suspension and debarment status prior to payment. The lack of internal controls and noncompliance was isolated to the 22611-053-PN01 and 22611-053-ARP grant awards. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: INDIANA STATE BOARD OF ACCOUNTS 24 LA PORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.320 states in part: "The non-Federal entity must have and use documented procurement procedures, consistent with the standards of this section and §§ 200.317, 200.318, and 200.319 for any of the following methods of procurement used for the acquisition of property or services required under a Federal award or sub-award. (a) Informal procurement methods. When the value of the procurement for property or services under a Federal award does not exceed the simplified acquisition threshold (SAT), as defined in § 200.1, or a lower threshold established by a non-Federal entity, formal procurement methods are not required. The non-Federal entity may use informal procurement methods to expedite the completion of its transactions and minimize the associated administrative burden and cost. The informal methods used for procurement of property or services at or below the SAT include: . . . (2) Small purchases — (i) Small purchase procedures. The acquisition of property or services, the aggregate dollar amount of which is higher than the micro-purchase threshold but does not exceed the simplified acquisition threshold. If small purchase procedures are used, price or rate quotations must be obtained from an adequate number of qualified sources as determined appropriate by the non-Federal entity. . . ." 2 CFR 180.300 states: "When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you intend to do business is not excluded or disqualified. You do this by: (a) Checking the SAM.gov Exclusions, or (b) Collecting a certification from that person, or (c) Adding a clause or condition to the covered transaction with that person." Cause The Cooperative noted they were unaware of the procurement requirements of expenditures within the Small Purchase Threshold and for suspension and debarment. They stated they have used the same vendors to provide professional services for several years but only recently started using federal grant award funds for the services. INDIANA STATE BOARD OF ACCOUNTS 25 LA PORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Effect Without the proper implementation of an effectively designed system of internal controls, the Cooperative cannot ensure the vendors paid with federal award funds are procured using the required methods and are not suspended or debarred from receiving federal funds. Without following the required methods for procurement and suspension and debarment, the Cooperative could be overpaying for services or could be paying vendors who are precluded from receiving federal funds. Questioned Costs There were no questioned costs identified. Recommendation Management of the Cooperative should develop written policies and procedures which would require that appropriate procurement methods are used for vendors that are within the Small Purchase Threshold and to ensure vendors are not suspended or debarred. Appropriate documentation should be maintained to ensure compliance with procurement and suspension and debarment. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Corrective Action Plan

FINDING 2024-004 Finding Subject: Special Education Cluster (IDEA) – Procurement and Suspension and Debarment Summary of Finding: Procurement- Small Purchase In fiscal year 2023, the Cooperative had five vendors which fell within the small purchase threshold (between $10,000 and $150,000). The Cooperative did not obtain quotes or competitive proposals, nor was a circumstance met that would have allowed for a noncompetitive procurement for the purchases. The total amount spent in was $292,806. Suspension and Debarment Verification to verify that contractors and subrecipients are not suspended, debarred, or otherwise under a nonprocurement transaction through SAM was not being completed. Three vendors each fiscal year provided goods or services which equaled or exceeded $25,000 were selected for testing. The total amount spent on covered transactions was $266,063 and $142,639 for fiscal years 2023 and 2024. For all six vendors, the Cooperative did not verify the vendors’ suspension and debarment status prior to payment. Contact Person Responsible for Corrective Action: Greg Hunt Contact Phone Number: (219) 362-7056 Views of Responsible Official: We concur with the finding. Description of Corrective Action Plan: Our Special Education Administrative Assistant has already begun checking on SAM for any federal purchases to verify suspension and debarment. She has also been provided with the LaPorte Community School Corporation’s Procurement Policy number po6325 and will adhere to those guidelines for any future purchases. Anticipated Completion Date: January 2025

About Procurement and Suspension and Debarment →
2024-005
Equipment & Real Property
MATERIAL WEAKNESSMODIFIED OPINION

FINDING 2024-005 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance related to the purchase of equipment with federal award dollars. A property record or capital asset listing is required to be maintained for all equipment purchased with the School Corporation's Education Stabilization Fund grant award. Equipment to be included in the listing is that which exceeds the School Corporation's capital asset threshold. The School Corporation's capital asset policy identifies a capital asset as an item which cost at or above $5,000. The School Corporation hired a consultant to compile and provide to them a fixed asset report that contained all inventory and assets purchased that exceeded the School Corporation's capitalization threshold through June 30, 2024. The consultant prepared the report; however, the School Corporation did not have any policies or procedures in place to ensure the listing was complete, nor was there any documentation that differences between the compiled asset report and the School Corporation's equipment records were reviewed and resolved. INDIANA STATE BOARD OF ACCOUNTS 26 LA PORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) The School Corporation's capital asset listing did not include all the required asset information for assets purchased with federal awards. The following information for each asset was not included in the School Corporation's capital asset listing: the source of funding for the property (including the federal award identification number (FAIN)), percentage of federal participation in the project costs for the federal award under which the property was acquired, and the use and condition of the property. During the audit period, the School Corporation had improvement projects totaling $8,022,149 with Education Stabilization Funds (ESF). These assets were not included on the capital asset listing or physical inventory prepared by the consultant. As such, the School Corporation did not maintain a capital asset listing with the equipment purchased with the ESF; the School Corporation could not have conducted a complete physical inventory biannually as required and could not properly maintain and safeguard the equipment as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: ". . . (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. . . ." INDIANA STATE BOARD OF ACCOUNTS 27 LA PORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Cause The School Corporation stated it did not include the recent improvements to the HVAC on the capital asset listing as it was waiting to receive an appraisal to determine how much of the project was equipment related rather than the whole contracted amount. Per the School Corporation's Policy 7455, entitled Accounting System for Capital Assets, capital assets are to be "capitalized in accordance with GAAP," which would include the full cost to bring the asset (equipment) to a location and condition for its use such as installation, assembly, freight, etc. Effect Without the proper implementation of an effectively designed system of internal controls, the School Corporation cannot ensure the capital asset purchases are properly accounted for. Not properly accounting for equipment that meets the capital asset threshold does not provide an accurate depiction of the total capital assets maintained by the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommend that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records include all the necessary information, new assets are properly added, and any discrepancies are reconciled. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Show full finding ▾
Full finding narrative

FINDING 2024-005 Subject: COVID-19 - Education Stabilization Fund - Equipment and Real Property Management Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Equipment and Real Property Management Audit Findings: Material Weakness, Modified Opinion Condition and Context The School Corporation had not properly designed or implemented a system of internal controls, which would include appropriate segregation of duties, that would likely be effective in preventing, or detecting and correcting, noncompliance related to the purchase of equipment with federal award dollars. A property record or capital asset listing is required to be maintained for all equipment purchased with the School Corporation's Education Stabilization Fund grant award. Equipment to be included in the listing is that which exceeds the School Corporation's capital asset threshold. The School Corporation's capital asset policy identifies a capital asset as an item which cost at or above $5,000. The School Corporation hired a consultant to compile and provide to them a fixed asset report that contained all inventory and assets purchased that exceeded the School Corporation's capitalization threshold through June 30, 2024. The consultant prepared the report; however, the School Corporation did not have any policies or procedures in place to ensure the listing was complete, nor was there any documentation that differences between the compiled asset report and the School Corporation's equipment records were reviewed and resolved. INDIANA STATE BOARD OF ACCOUNTS 26 LA PORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) The School Corporation's capital asset listing did not include all the required asset information for assets purchased with federal awards. The following information for each asset was not included in the School Corporation's capital asset listing: the source of funding for the property (including the federal award identification number (FAIN)), percentage of federal participation in the project costs for the federal award under which the property was acquired, and the use and condition of the property. During the audit period, the School Corporation had improvement projects totaling $8,022,149 with Education Stabilization Funds (ESF). These assets were not included on the capital asset listing or physical inventory prepared by the consultant. As such, the School Corporation did not maintain a capital asset listing with the equipment purchased with the ESF; the School Corporation could not have conducted a complete physical inventory biannually as required and could not properly maintain and safeguard the equipment as required. The lack of internal controls and noncompliance were systemic issues throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.313(d) states in part: ". . . (1) Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the FAIN), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. (2) A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. (3) A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. (4) Adequate maintenance procedures must be developed to keep the property in good condition. . . ." INDIANA STATE BOARD OF ACCOUNTS 27 LA PORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Cause The School Corporation stated it did not include the recent improvements to the HVAC on the capital asset listing as it was waiting to receive an appraisal to determine how much of the project was equipment related rather than the whole contracted amount. Per the School Corporation's Policy 7455, entitled Accounting System for Capital Assets, capital assets are to be "capitalized in accordance with GAAP," which would include the full cost to bring the asset (equipment) to a location and condition for its use such as installation, assembly, freight, etc. Effect Without the proper implementation of an effectively designed system of internal controls, the School Corporation cannot ensure the capital asset purchases are properly accounted for. Not properly accounting for equipment that meets the capital asset threshold does not provide an accurate depiction of the total capital assets maintained by the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommend that management of the School Corporation establish a proper system of internal controls and develop policies and procedures to ensure asset records include all the necessary information, new assets are properly added, and any discrepancies are reconciled. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Corrective Action Plan

FINDING 2024-005 Finding Subject: Education Stabilization Fund – Equipment and Real Property Management Summary of Finding: The School Corporation’s capital asset listing did not include all the required asset information for assets purchased with federal awards. The following information for each asset was not included in the School Corporations capital asset listing: the source of funding for the property (including the federal award identification number (FAIN)), percentage of federal participation in the project costs for the federal award under which the property was acquired, and the use and condition of the property. During the audit period, the School Corporation had improvement projects totaling $8,022,149 with Education Stabilization Funds (ESF). These assets were not included on the asset listing or physical inventory prepared by the consultant. The School Corporation did not maintain a capital asset listing with the equipment purchased with ESF and could not have conducted a complete physical inventory bi-annually as required and could not properly maintain and safeguard the equipment as required. Contact Person Responsible for Corrective Action: Greg Hunt Contact Phone Number: (219) 362-7056 Views of Responsible Official: We concur with the finding. Description of Corrective Action Plan: We have contacted our appraisal company and provided documentation to include the HVAC equipment into our next appraisal document update. We anticipate the next official appraisal listing will be in July 2025. Anticipated Completion Date: July 2025

About Equipment and Real Property Management →
2024-006
Special Tests & Provisions
MATERIAL WEAKNESSMODIFIED OPINIONREPEAT OF 2022-003

FINDING 2024-006 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Repeat Finding This is a repeat finding from the immediately prior audit report. The prior audit finding number was 2022-003. Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 28 LA PORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the wage rate requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. The School Corporation did not have adequate policies or procedures to ensure that all construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. The School Corporation had four contracts related to an HVAC project during the audit period that was subject to the wage rate requirements. Three of the four contracts did not have the required prevailing wage rate clause included in the contract. The lack of control and noncompliance was isolated to the three contracts mentioned above. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head will cause or require the contracting officer to require the contracting officer to insert in full, or (for contracts covered by the Federal Acquisition Regulation (48 CFR chapter 1)) by reference, in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the laws referenced by § 5.1, the following clauses. . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or otherwise working in construction or development of the project under a development statute), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of basic hourly wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . ." INDIANA STATE BOARD OF ACCOUNTS 29 LA PORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause Management had not established a system of internal controls that would have ensured compliance or that the required clause was included in the contracts for the Special Tests and Provisions - Wage Rate Requirements compliance requirement. The School Corporation posted Davis Bacon posters at the jobsite of the HVAC project in lieu of including the cause in the contract for the identified vendors. Effect The failure to establish an effective system of internal controls over the Special Test and Provisions - Wage Rate Requirement resulted in three contracts not meeting the guidelines established. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Show full finding ▾
Full finding narrative

FINDING 2024-006 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Numbers: 84.425D, 84.425U Federal Award Numbers and Years (or Other Identifying Numbers): S425D210013, S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Repeat Finding This is a repeat finding from the immediately prior audit report. The prior audit finding number was 2022-003. Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. INDIANA STATE BOARD OF ACCOUNTS 28 LA PORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the wage rate requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. The School Corporation did not have adequate policies or procedures to ensure that all construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. The School Corporation had four contracts related to an HVAC project during the audit period that was subject to the wage rate requirements. Three of the four contracts did not have the required prevailing wage rate clause included in the contract. The lack of control and noncompliance was isolated to the three contracts mentioned above. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 29 CFR 5.5 states in part: "(a) The Agency head will cause or require the contracting officer to require the contracting officer to insert in full, or (for contracts covered by the Federal Acquisition Regulation (48 CFR chapter 1)) by reference, in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the laws referenced by § 5.1, the following clauses. . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or otherwise working in construction or development of the project under a development statute), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of basic hourly wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . ." INDIANA STATE BOARD OF ACCOUNTS 29 LA PORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." Cause Management had not established a system of internal controls that would have ensured compliance or that the required clause was included in the contracts for the Special Tests and Provisions - Wage Rate Requirements compliance requirement. The School Corporation posted Davis Bacon posters at the jobsite of the HVAC project in lieu of including the cause in the contract for the identified vendors. Effect The failure to establish an effective system of internal controls over the Special Test and Provisions - Wage Rate Requirement resulted in three contracts not meeting the guidelines established. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Corrective Action Plan

FINDING 2024-006 Finding Subject: Education Stabilization Fund – Special Tests and Provisions – Wage Rate Summary of Finding: The School Corporation did not have adequate policies or procedures to ensure that all construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. The School Corporation had four contracts related to an HVAC project during the audit period that was subject to the wage rate requirements. Three of the four contracts did not have the required prevailing wage rate clause included in the contract. Contact Person Responsible for Corrective Action: Greg Hunt Contact Phone Number: (219) 362-7056 Views of Responsible Official: We concur with the finding. Description of Corrective Action Plan: The AIA contracts references following the construction manual and the Davis Bacon Law is referenced in the construction manual. In addition, certified payroll was submitted with each pay application to verify prevailing wages was adhered to. If there are any future funded construction projects, LPCSC will ensure that the Davis Bacon Law is sited in the individual contract. Anticipated Completion Date: February 14, 2025

Prior Finding References

2022-003

About Special Tests and Provisions →

FY 2022-06-30

ADVERSE OPINION, NON-GAAP BASISMATERIAL NONCOMPLIANCE DISCLOSED$15,455,888 federal awards expended

FAC accepted this audit on March 27, 2023 — management decision was due September 27, 2023.

2022-003
Special Tests & Provisions
MATERIAL WEAKNESSMODIFIED OPINION

FINDING 2022-003 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425U Federal Award Number and Year (or Other Identifying Number): S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation did not have adequate policies or procedures to ensure that all construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Two construction contracts during the audit period were subject to the wage rate requirements; however, the contracts did not have the required prevailing wage rate clause included in the contract, nor were certified payrolls submitted by the contractors. The lack of internal controls and noncompliance were systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 19 LAPORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in ? 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." INDIANA STATE BOARD OF ACCOUNTS 20 LAPORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Cause Management had not established a system of internal controls that would have ensured compliance or that the required clause was included in the contracts for the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective system of internal controls and include the required clause in contracts prevented the determination of the School Corporation's compliance with the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Show full finding ▾
Full finding narrative

FINDING 2022-003 Subject: COVID-19 - Education Stabilization Fund - Special Tests and Provisions - Wage Rate Requirements Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425U Federal Award Number and Year (or Other Identifying Number): S425U210013 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Special Tests and Provisions - Wage Rate Requirements Audit Findings: Material Weakness, Modified Opinion Condition and Context An effective internal control system was not designed or implemented at the School Corporation to ensure compliance with requirements related to the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Construction contracts in excess of $2,000 financed by federal assistance funds must pay wages not less than those established for the locality of the project (prevailing wage rates) by the Department of Labor (DOL) to their laborers and mechanics. Nonfederal entities are to include in their construction contracts subject to the Wage Rate Requirements a provision that the contractor or subcontractor comply with these requirements and the DOL regulations. This would include a requirement to submit a copy of the payroll and statement of compliance to the entity for each week in which contract work was performed. The School Corporation did not have adequate policies or procedures to ensure that all construction contracts in excess of $2,000 paid from federal grant funds included a prevailing wage rate clause. Two construction contracts during the audit period were subject to the wage rate requirements; however, the contracts did not have the required prevailing wage rate clause included in the contract, nor were certified payrolls submitted by the contractors. The lack of internal controls and noncompliance were systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 19 LAPORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 29 CFR 5.5 states in part: "(a) The Agency head shall cause or require the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the acts listed in ? 5.1, the following clauses . . . (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. . . . (3) Payrolls and basic records. . . . (ii) (A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the (write in name of appropriate federal agency) if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the (write in name of agency). . . ." 2 CFR 200 Appendix II states in part: "In addition to other provisions required by the Federal agency or non-Federal entity; all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable. . . . (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non- Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, 'Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction'). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. . . ." INDIANA STATE BOARD OF ACCOUNTS 20 LAPORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Cause Management had not established a system of internal controls that would have ensured compliance or that the required clause was included in the contracts for the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Effect The failure to establish an effective system of internal controls and include the required clause in contracts prevented the determination of the School Corporation's compliance with the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Special Tests and Provisions - Wage Rate Requirements compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Corrective Action Plan

FINDING 2022-003 (Auditor Assigned Reference Number) Contact Person Responsible for Corrective Action: Greg Hunt Contact Phone Number: (219) 362-7056 Views of Responsible Official: We concur with the finding. Description of Corrective Action Plan: LaPorte Community School Corporation will review the wage schedule of contractors associated with federal grants with each pay application submitted to ensure proper documentation has been submitted. Anticipated Completion Date: May 15, 2023

About Special Tests and Provisions →
2022-004
Reporting
MATERIAL WEAKNESSOTHER MATTERS

FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C Federal Award Number and Year (or Other Identifying Number): S425C200018 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Material Weakness, Other Matters Condition and Context An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation filed the four Elementary and Secondary School Emergency Relief (ESSER) and the two Governor's Emergency Education Relief (GEER) annual data reports due during the audit period. However, for GEER I, Year 2, the School Corporation reported $56,149 in expenditures although the School Corporation had $314,301 in expenditures from the GEER fund during the Year 2 reporting period. The lack of internal controls and noncompliance was isolated to the GEER Year 2 annual report. INDIANA STATE BOARD OF ACCOUNTS 21 LAPORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.302(b) states in part: "The financial management system of each non-Federal entity must provide for the following . . . (2) Accurate, current, and complete disclosure of the financial results of each Federal award or program in accordance with the reporting requirements set forth in ?? 200.328 and 200.329. . . ." 34 CFR 76.722 states: "A State may require a subgrantee to submit reports in a manner and format that assists the State in complying with the requirements under 34 CFR 76.720 and in carrying out other responsibilities under the program." Cause Management had not developed a system of internal controls that would have ensured compliance with the Reporting compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Reporting compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Show full finding ▾
Full finding narrative

FINDING 2022-004 Subject: COVID-19 - Education Stabilization Fund - Reporting Federal Agency: Department of Education Federal Program: COVID-19 - Education Stabilization Fund Assistance Listings Number: 84.425C Federal Award Number and Year (or Other Identifying Number): S425C200018 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Reporting Audit Findings: Material Weakness, Other Matters Condition and Context An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The School Corporation filed the four Elementary and Secondary School Emergency Relief (ESSER) and the two Governor's Emergency Education Relief (GEER) annual data reports due during the audit period. However, for GEER I, Year 2, the School Corporation reported $56,149 in expenditures although the School Corporation had $314,301 in expenditures from the GEER fund during the Year 2 reporting period. The lack of internal controls and noncompliance was isolated to the GEER Year 2 annual report. INDIANA STATE BOARD OF ACCOUNTS 21 LAPORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.302(b) states in part: "The financial management system of each non-Federal entity must provide for the following . . . (2) Accurate, current, and complete disclosure of the financial results of each Federal award or program in accordance with the reporting requirements set forth in ?? 200.328 and 200.329. . . ." 34 CFR 76.722 states: "A State may require a subgrantee to submit reports in a manner and format that assists the State in complying with the requirements under 34 CFR 76.720 and in carrying out other responsibilities under the program." Cause Management had not developed a system of internal controls that would have ensured compliance with the Reporting compliance requirement. Effect The failure to establish an effective internal control system enabled material noncompliance to go undetected. Noncompliance with the grant agreement and the Reporting compliance requirement could result in the loss of future federal funds to the School Corporation. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance and comply with the grant agreement and the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Corrective Action Plan

FINDING 2022-004 (Auditor Assigned Reference Number) Contact Person Responsible for Corrective Action: Greg Hunt Contact Phone Number: (219) 362-7056 Views of Responsible Official: We concur with the finding. Description of Corrective Action Plan: LaPorte Community School Corporation will review the Education Stabilization Fund schedule of disbursements more closely prior to submission. Anticipated Completion Date: May 15, 2023

About Reporting →
2022-005
Matching, Level of Effort, Earmarking
MATERIAL WEAKNESSMODIFIED OPINIONREPEAT OF 2020-005

FINDING 2022-005 Subject: Special Education Cluster (IDEA) - Earmarking Federal Agency: Department of Education Federal Program: Special Education Grants to States Assistance Listings Number: 84.027 Federal Award Number and Year (or Other Identifying Number): 21611-053-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Matching, Level of Effort, Earmarking Audit Findings: Material Weakness, Modified Opinion Repeat Finding This is a repeat finding from the immediately prior audit report. The prior audit finding number was 2020-005. Condition and Context The School Corporation is a member of the South LaPorte County Special Education Cooperative (Cooperative). During fiscal year 2021-2022, the Cooperative operated the special education programs and spent the federal money on behalf of all its member schools. As the grant agreements were between the Indiana Department of Education (IDOE) and each member school, the School Corporation was responsible for ensuring and providing oversight of the Cooperative. There was inadequate oversight performed by the School Corporation in order to ensure compliance with the Matching, Level of Effort, Earmarking compliance requirement. The School Corporation did not have internal controls in place to ensure that the Cooperative complied with the earmarking requirements. The Cooperative did not have adequate procedures in place to ensure that the required level of expenditures for non-public school students with disabilities was met for each member school. The Cooperative did not have effective internal controls to ensure non-public school expenditures were appropriately identified and reported. The Non-Public Proportionate Share expenditures for the 21611-053-PN01 grant award could not be verified for the individual member schools. Total grant expenditures were posted as expended. The non-public proportionate share expenditures were determined by applying a percentage to the non-public school budgeted expenditures. These were the amounts reported to the IDOE. As such, we were unable to identify if the minimum amount per the grant awards was expended and properly reported to the IDOE as required. The lack of internal controls and noncompliance was isolated to the 21611-053-PN01 grant award. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 23 LAPORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: . . . (g) Be adequately documented. . . ." 2 CFR 200.208(b) states in part: "The Federal awarding agency or pass-through entity may adjust specific Federal award conditions as needed . . ." 511 IAC 7-34-7(b) states: "The public agency, in providing special education and related services to students in nonpublic schools must expend at least an amount that is the same proportion of the public agency total subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities, who are enrolled by their parents in nonpublic schools within its boundaries, is to the total number of students with disabilities of the same age range." Cause The School Corporation's management had not developed an effective system of internal controls that would have ensured compliance with the grant agreements and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. Effect The failure to establish an effective internal control system, as well as adequately document costs of federal awards, prevented the determination of the School Corporation's compliance with the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish an effective system of internal controls, as well as appropriately document and identify federal award expenditures to ensure compliance with the Matching, Level of Effort, Earmarking compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Show full finding ▾
Full finding narrative

FINDING 2022-005 Subject: Special Education Cluster (IDEA) - Earmarking Federal Agency: Department of Education Federal Program: Special Education Grants to States Assistance Listings Number: 84.027 Federal Award Number and Year (or Other Identifying Number): 21611-053-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Matching, Level of Effort, Earmarking Audit Findings: Material Weakness, Modified Opinion Repeat Finding This is a repeat finding from the immediately prior audit report. The prior audit finding number was 2020-005. Condition and Context The School Corporation is a member of the South LaPorte County Special Education Cooperative (Cooperative). During fiscal year 2021-2022, the Cooperative operated the special education programs and spent the federal money on behalf of all its member schools. As the grant agreements were between the Indiana Department of Education (IDOE) and each member school, the School Corporation was responsible for ensuring and providing oversight of the Cooperative. There was inadequate oversight performed by the School Corporation in order to ensure compliance with the Matching, Level of Effort, Earmarking compliance requirement. The School Corporation did not have internal controls in place to ensure that the Cooperative complied with the earmarking requirements. The Cooperative did not have adequate procedures in place to ensure that the required level of expenditures for non-public school students with disabilities was met for each member school. The Cooperative did not have effective internal controls to ensure non-public school expenditures were appropriately identified and reported. The Non-Public Proportionate Share expenditures for the 21611-053-PN01 grant award could not be verified for the individual member schools. Total grant expenditures were posted as expended. The non-public proportionate share expenditures were determined by applying a percentage to the non-public school budgeted expenditures. These were the amounts reported to the IDOE. As such, we were unable to identify if the minimum amount per the grant awards was expended and properly reported to the IDOE as required. The lack of internal controls and noncompliance was isolated to the 21611-053-PN01 grant award. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 23 LAPORTE COMMUNITY SCHOOL CORPORATION SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) 2 CFR 200.403 states in part: "Except where otherwise authorized by statute, costs must meet the following general criteria in order to be allowable under Federal awards: . . . (g) Be adequately documented. . . ." 2 CFR 200.208(b) states in part: "The Federal awarding agency or pass-through entity may adjust specific Federal award conditions as needed . . ." 511 IAC 7-34-7(b) states: "The public agency, in providing special education and related services to students in nonpublic schools must expend at least an amount that is the same proportion of the public agency total subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities, who are enrolled by their parents in nonpublic schools within its boundaries, is to the total number of students with disabilities of the same age range." Cause The School Corporation's management had not developed an effective system of internal controls that would have ensured compliance with the grant agreements and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. Effect The failure to establish an effective internal control system, as well as adequately document costs of federal awards, prevented the determination of the School Corporation's compliance with the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish an effective system of internal controls, as well as appropriately document and identify federal award expenditures to ensure compliance with the Matching, Level of Effort, Earmarking compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Corrective Action Plan

FINDING 2022-005 (Auditor Assigned Reference Number) Contact Person Responsible for Corrective Action: Greg Hunt, Assistant Superintendent of Business & Operations Contact Phone Number: (219) 362-7056 Views of Responsible Official: We concur with the finding. Description of Corrective Action Plan: LaPorte Community School Corporation will review more closely the submission of costs of the Federal Special Education Grant to ensure that earmarking requirements of the Matching, Level of Effort, Earmarking compliance is followed. Anticipated Completion Date: May 15, 2023

Prior Finding References

2020-005

About Matching, Level of Effort, Earmarking →

FY 2020-06-30

ADVERSE OPINION, NON-GAAP BASISMATERIAL NONCOMPLIANCE DISCLOSED$11,316,192 federal awards expended

FAC accepted this audit on January 3, 2022 — management decision was due July 3, 2022.

2020-002
Eligibility / Program Income
MATERIAL WEAKNESS

FINDING 2020-002 Subject: Child Nutrition Cluster - Internal Control Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program CFDA Number: 10.553, 10.555 Federal Award Numbers and Years (or Other Identifying Numbers): FY 18-19, FY 19-20 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Eligibility, Program Income Audit Finding: Material Weakness Condition and Context An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Eligibility and Program Income compliance requirements. Eligibility The School Corporation utilized computer software to determine eligibility. The Food Service Director/Coordinator was responsible for verifying the computer software made the correct determination by reviewing every fifth application verified by the computer software. There was no evidence of this review to ensure the eligibility determinations made by the software system were accurate. Program Income - Assessing The Food Service Coordinator was responsible for verifying that the approved school food prices were properly entered into the software system. There was no evidence of the Food Service Coordinator's review of the entered prices that would have ensured sales to students and adults were properly assessed. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Eligibility and Program Income compliance requirements. Effect The failure to establish an effective internal control system placed the School Corporation at risk of noncompliance with the grant agreement and the Eligibility and Program Income compliance requirements. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish an effective system of internal controls to ensure compliance with the grant agreement and the Eligibility and Program Income compliance requirements. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Show full finding ▾
Full finding narrative

FINDING 2020-002 Subject: Child Nutrition Cluster - Internal Control Federal Agency: Department of Agriculture Federal Programs: School Breakfast Program, National School Lunch Program CFDA Number: 10.553, 10.555 Federal Award Numbers and Years (or Other Identifying Numbers): FY 18-19, FY 19-20 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Eligibility, Program Income Audit Finding: Material Weakness Condition and Context An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Eligibility and Program Income compliance requirements. Eligibility The School Corporation utilized computer software to determine eligibility. The Food Service Director/Coordinator was responsible for verifying the computer software made the correct determination by reviewing every fifth application verified by the computer software. There was no evidence of this review to ensure the eligibility determinations made by the software system were accurate. Program Income - Assessing The Food Service Coordinator was responsible for verifying that the approved school food prices were properly entered into the software system. There was no evidence of the Food Service Coordinator's review of the entered prices that would have ensured sales to students and adults were properly assessed. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Eligibility and Program Income compliance requirements. Effect The failure to establish an effective internal control system placed the School Corporation at risk of noncompliance with the grant agreement and the Eligibility and Program Income compliance requirements. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish an effective system of internal controls to ensure compliance with the grant agreement and the Eligibility and Program Income compliance requirements. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Corrective Action Plan

FINDING 2020-002: Child Nutrition Cluster ? Internal Controls Contact Person Responsible for Corrective Action: Greg Hunt, Assistant Superintendent for Business & Operations Contact Phone Number: (219) 362-7056 Views of Responsible Official: We concur with the finding that we were unable to provide proof that we were reviewing and verifying food service eligibility applications and approved school food prices within the software. Description of Corrective Action Plan: Meal applications will be processed and reviewed by the Food Service Office Coordinator. Every 5th application will be checked to verify the status of the application by the Food Service Director. The application will be initialed and dated after completion of the review. A spreadsheet will be completed after each application is reviewed. It will include the application number, name of the student on the application, the application status, the date it was checked and the initials of the Food Service Director. (See attached copy of the spreadsheet.) The meal pricing will be entered into the software. The Food Service Office Coordinator will print the meal prices from the software and check them against the student and adult prices for the current school year. The coordinator will initial and date the printout before the Food Service Director reviews and initials as well. Anticipated Completion Date: July 1, 2021

About Eligibility, Program Income →
2020-003
Eligibility / Matching, Level of Effort, Earmarking / Reporting
MATERIAL WEAKNESS

FINDING 2020-003 Subject: Title I to Local Educational Agencies - Eligibility, Level of Effort - Maintenance of Effort, Reporting Federal Agency: Department of Education Federal Program: Title I Grants to Local Educational Agencies CFDA Number: 84.010 Federal Award Numbers and Years (or Other Identifying Numbers): S010A150014, S010A180014 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Eligibility; Matching, Level of Effort, Earmarking; Reporting Audit Finding: Material Weakness Condition and Context An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Eligibility; Matching, Level of Effort, Earmarking; and Reporting compliance requirements. Eligibility The School Corporation utilized computer software to determine eligibility. The Food Service Director/Coordinator was responsible for verifying the computer software made the correct determination by reviewing every fifth application verified by the computer software. There was no evidence of this review to ensure the eligibility determinations made by the software system were accurate. There was no evidence of internal control over the October Real Time Report. The Information Technology (IT) employee uploaded the Real Time Report into the STN website. Any discrepancies found were communicated to the appropriate building secretary or registrar to verify enrollment and resolve conflicts. However, the IT employee was unable to provide adequate documentation of communication with the building secretaries or registrars to support the resolution on the enrollment errors made by the IT employee during the audit period. The Title I Grant Coordinator entered the nonpublic information into the Title I application manually. There was no evidence of review or oversight to ensure that the information entered was accurate. Matching, Level of Effort, Earmarking and Reporting The financial information submitted by the School Corporation to the Indiana Department of Education through the Form 9 reports was used to calculate the School Corporation's level of effort, as well as complete the State Per Pupil Expenditure Report. The Payroll Clerk ran payroll in Skyward and verified the Summary Report after payroll was prepared. There was no oversight or review process in place over payroll at the School Corporation level to ensure the data used to complete the Form 9 was reported accurately in the correct fund, account, and object code. The Title I Grant Coordinator included the methodology from the budget process into the Title I application to ensure the School Corporation was not supplanting. There was no oversight or review process to ensure the methodology was properly implemented. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed a system of internal controls that would have ensured compliance with requirements related to the grant agreement and the Eligibility; Matching, Level of Effort, Earmarking; and Reporting compliance requirements. Effect The failure to design and implement a system of internal controls placed the School Corporation at risk of noncompliance with the grant agreement and the Eligibility; Matching, Level of Effort, Earmarking; and Reporting compliance requirements. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls related to the grant agreement and the Eligibility; Matching, Level of Effort, Earmarking; and Reporting compliance requirements. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Show full finding ▾
Full finding narrative

FINDING 2020-003 Subject: Title I to Local Educational Agencies - Eligibility, Level of Effort - Maintenance of Effort, Reporting Federal Agency: Department of Education Federal Program: Title I Grants to Local Educational Agencies CFDA Number: 84.010 Federal Award Numbers and Years (or Other Identifying Numbers): S010A150014, S010A180014 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Eligibility; Matching, Level of Effort, Earmarking; Reporting Audit Finding: Material Weakness Condition and Context An effective internal control system was not in place at the School Corporation to ensure compliance with requirements related to the grant agreement and the Eligibility; Matching, Level of Effort, Earmarking; and Reporting compliance requirements. Eligibility The School Corporation utilized computer software to determine eligibility. The Food Service Director/Coordinator was responsible for verifying the computer software made the correct determination by reviewing every fifth application verified by the computer software. There was no evidence of this review to ensure the eligibility determinations made by the software system were accurate. There was no evidence of internal control over the October Real Time Report. The Information Technology (IT) employee uploaded the Real Time Report into the STN website. Any discrepancies found were communicated to the appropriate building secretary or registrar to verify enrollment and resolve conflicts. However, the IT employee was unable to provide adequate documentation of communication with the building secretaries or registrars to support the resolution on the enrollment errors made by the IT employee during the audit period. The Title I Grant Coordinator entered the nonpublic information into the Title I application manually. There was no evidence of review or oversight to ensure that the information entered was accurate. Matching, Level of Effort, Earmarking and Reporting The financial information submitted by the School Corporation to the Indiana Department of Education through the Form 9 reports was used to calculate the School Corporation's level of effort, as well as complete the State Per Pupil Expenditure Report. The Payroll Clerk ran payroll in Skyward and verified the Summary Report after payroll was prepared. There was no oversight or review process in place over payroll at the School Corporation level to ensure the data used to complete the Form 9 was reported accurately in the correct fund, account, and object code. The Title I Grant Coordinator included the methodology from the budget process into the Title I application to ensure the School Corporation was not supplanting. There was no oversight or review process to ensure the methodology was properly implemented. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause Management had not developed a system of internal controls that would have ensured compliance with requirements related to the grant agreement and the Eligibility; Matching, Level of Effort, Earmarking; and Reporting compliance requirements. Effect The failure to design and implement a system of internal controls placed the School Corporation at risk of noncompliance with the grant agreement and the Eligibility; Matching, Level of Effort, Earmarking; and Reporting compliance requirements. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls related to the grant agreement and the Eligibility; Matching, Level of Effort, Earmarking; and Reporting compliance requirements. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Corrective Action Plan

FINDING 2020-003: Title I to Local Educational Agencies ? Eligibility, Level of Effort ? Maintenance of Effort, Reporting Contact Person Responsible for Corrective Action: Greg Hunt, Assistant Superintendent for Business & Operations Contact Phone Number: (219) 362-7056 Views of Responsible Official: We concur with the findings listed. Description of Corrective Action Plan: Eligibility Meal applications will be processed and reviewed by the Food Service Office Coordinator. Every 5th application will be checked to verify the status of the application by the Food Service Director. The application will be initialed and dated after completion of the review. A spreadsheet will be completed after each application is reviewed. It will include the application number, name of the student on the application, the application status, the date it was checked and the initials of the Food Service Director. The student rosters that are sent to each school by the technology employee will be reviewed and signed by each school and then returned to technology. Corrections will be made and the report will be submitted. If the submitted report is flagged with any errors, the school will be asked to verify and make the correction and will send their responses back to the technology department. After the Title I budget is approved, the grant coordinator will send a copy of the final budget to our nonpublic school to review and approve with their signature. Matching. Level of Effort, Earmarking and Reporting Payroll reports will be reviewed monthly to ensure the correct personnel are being paid from each fund. After verifying the reports the person reviewing them will sign them and maintain those records for each audit period. The Assistant Superintendent of Business and Operations will review and sign the budget application supporting the methodology for Title I to ensure that the corporation is not supplanting. The Assistant Superintendent of Business and Operations and the Assistant Superintendent of Elementary (Title I Coordinator) will review teaching positions, for all the LPCSC elementary schools, on a quarterly basis as it applies to the needs and number of students. The staffing spreadsheet will be signed by both the Assistant Superintendent of Business and Operations and the Assistant Superintendent of Elementary. Anticipated Completion Date: November 2021

About Eligibility, Matching, Level of Effort, Earmarking, Reporting →
2020-004
Activities Allowed or Unallowed / Cost Allowability
MATERIAL WEAKNESS

FINDING 2020-004 Subject: Special Education Cluster (IDEA) - Activities Allowed or Unallowed, Allowable Costs/Cost Principles Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants CFDA Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 18619-055-PN01, 19611-055-PN01, 19619-055-PN01, 20611-053-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles Audit Finding: Material Weakness Condition and Context An effective internal control system was not in place at the School Corporation and the South LaPorte County Special Education Cooperative (Cooperative) to ensure compliance with the grant agreement and the Activities Allowed or Unallowed and Allowable Costs/Cost Principles compliance requirements. The Cooperative was a planning district whose purpose was to provide free appropriate public education to students identified as disabled in accordance with state statute who were legal residents and/or have been accepted through means of open enrollment, or other legal means of transfer to the participating member school corporations in LaPorte County. The School Corporation was the administrator of this Cooperative. The School Corporation had not designed or implemented adequate internal controls to ensure that all activities and costs were allowed. The payroll disbursements were prepared by the Payroll Department without oversight or review. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framwork', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause The School Corporation had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Activities Allowed or Unallowed and the Allowable Costs/Cost Principles compliance requirements. Effect The failure to establish an effective internal control system placed the School Corporation at risk of noncompliance with the grant agreement and the Activities Allowed or Unallowed and the Allowable Costs/Cost Principles compliance requirements. A lack of an internal control system could have also allowed noncompliance with the compliance requirements and allowed the misuse and mismanagement of federal funds and assets by not having proper oversight, reviews, and approvals over the activities of the program. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreement and the Activities Allowed or Unallowed and the Allowable Costs/Cost Principles compliance requirements. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Show full finding ▾
Full finding narrative

FINDING 2020-004 Subject: Special Education Cluster (IDEA) - Activities Allowed or Unallowed, Allowable Costs/Cost Principles Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants CFDA Numbers: 84.027, 84.173 Federal Award Numbers and Years (or Other Identifying Numbers): 18619-055-PN01, 19611-055-PN01, 19619-055-PN01, 20611-053-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirements: Activities Allowed or Unallowed, Allowable Costs/Cost Principles Audit Finding: Material Weakness Condition and Context An effective internal control system was not in place at the School Corporation and the South LaPorte County Special Education Cooperative (Cooperative) to ensure compliance with the grant agreement and the Activities Allowed or Unallowed and Allowable Costs/Cost Principles compliance requirements. The Cooperative was a planning district whose purpose was to provide free appropriate public education to students identified as disabled in accordance with state statute who were legal residents and/or have been accepted through means of open enrollment, or other legal means of transfer to the participating member school corporations in LaPorte County. The School Corporation was the administrator of this Cooperative. The School Corporation had not designed or implemented adequate internal controls to ensure that all activities and costs were allowed. The payroll disbursements were prepared by the Payroll Department without oversight or review. The lack of internal controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framwork', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause The School Corporation had not developed a system of internal controls that would have ensured compliance with the grant agreement and the Activities Allowed or Unallowed and the Allowable Costs/Cost Principles compliance requirements. Effect The failure to establish an effective internal control system placed the School Corporation at risk of noncompliance with the grant agreement and the Activities Allowed or Unallowed and the Allowable Costs/Cost Principles compliance requirements. A lack of an internal control system could have also allowed noncompliance with the compliance requirements and allowed the misuse and mismanagement of federal funds and assets by not having proper oversight, reviews, and approvals over the activities of the program. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish internal controls to ensure compliance with the grant agreement and the Activities Allowed or Unallowed and the Allowable Costs/Cost Principles compliance requirements. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Corrective Action Plan

FINDING 2020-004: Special Education Cluster (IDEA) ? Activities Allowed or Unallowed, Allowable Costs/Cost Principles Contact Person Responsible for Corrective Action: Greg Hunt, Assistant Superintendent for Business & Operations Contact Phone Number: (219) 362-7056 Views of Responsible Official: We concur with the finding listed. Description of Corrective Action Plan: Condition and Context Each school and/or department reviews and signs their building employees time sheets and absentee reports prior to submitting to the payroll department. The payroll department will continue to enter all of the payroll into Skyward. After each payroll is ran, the payroll department will provide a copy of the ?Labor Distribution Report for Payroll? to the Special Education Department for review. The Director and/or Administrative Assistant will sign the copy and return it to payroll. Payroll will keep a signed copy with each payroll distribution. Anticipated Completion Date: November 2021

About Activities Allowed or Unallowed, Allowable Costs / Cost Principles →
2020-005
Matching, Level of Effort, Earmarking
MATERIAL WEAKNESSMODIFIED OPINIONREPEAT OF 2018-013

FINDING 2020-005 Subject: Special Education Cluster (IDEA) - Earmarking Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants CFDA Numbers: 84.027, 84.173 Federal Award Numbers (or Other Identifying Numbers): 18611-055-PN01, 18619-055-PN01, 19611-055-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Matching, Level of Effort, Earmarking Audit Findings: Material Weakness, Modified Opinion Repeat Finding This is a repeat finding from the immediately prior audit report. The prior audit finding number was 2018-013. Condition and Context An effective internal control system was not in place at the School Corporation and at the South LaPorte County Special Education Cooperative (Cooperative) to ensure compliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. The Cooperative was a planning district whose purpose was to provide free appropriate public education to students identified as disabled in accordance with state statute who were legal residents and/or have been accepted through means of open enrollment, or other legal means of transfer to the participating member school corporations in LaPorte County. The School Corporation was the administrator of this Cooperative. The School Corporation and the Cooperative did not maintain adequate supporting documentation used to calculate the amount of special education and related services that were provided to students in nonpublic schools and facilities for grants 18611-055-PN01 and 18619-055-PN01. Additionally, adequate supporting documentation was not maintained for the second quarter of the 19611-055-PN01 grant. Since we could not determine if the transactions were properly classified as nonpublic school expenditures, we were unable to determine compliance with the earmarking requirements. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framwork', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.207(a) states in part: "The Federal awarding agency or pass-through entity may impose additional specific award conditions as needed . . ." 511 IAC 7-34-7(b) states: "The public agency, in providing special education and related services to students in nonpublic schools must expend at least an amount that is the same proportion of the public agency total subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities, who are enrolled by their parents in nonpublic schools within its boundaries, is to the total number of students with disabilities of the same age range." Cause The School Corporation had not established a system of internal controls to ensure compliance with the grant agreement and the earmarking requirement of the Matching, Level of Effort, Earmarking compliance requirement. Effect The failure to maintain and provide appropriate supporting documentation prevented the determination of the School Corporation's compliance with the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and maintain adequate supporting documentation to ensure compliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Show full finding ▾
Full finding narrative

FINDING 2020-005 Subject: Special Education Cluster (IDEA) - Earmarking Federal Agency: Department of Education Federal Programs: Special Education Grants to States, Special Education Preschool Grants CFDA Numbers: 84.027, 84.173 Federal Award Numbers (or Other Identifying Numbers): 18611-055-PN01, 18619-055-PN01, 19611-055-PN01 Pass-Through Entity: Indiana Department of Education Compliance Requirement: Matching, Level of Effort, Earmarking Audit Findings: Material Weakness, Modified Opinion Repeat Finding This is a repeat finding from the immediately prior audit report. The prior audit finding number was 2018-013. Condition and Context An effective internal control system was not in place at the School Corporation and at the South LaPorte County Special Education Cooperative (Cooperative) to ensure compliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. The Cooperative was a planning district whose purpose was to provide free appropriate public education to students identified as disabled in accordance with state statute who were legal residents and/or have been accepted through means of open enrollment, or other legal means of transfer to the participating member school corporations in LaPorte County. The School Corporation was the administrator of this Cooperative. The School Corporation and the Cooperative did not maintain adequate supporting documentation used to calculate the amount of special education and related services that were provided to students in nonpublic schools and facilities for grants 18611-055-PN01 and 18619-055-PN01. Additionally, adequate supporting documentation was not maintained for the second quarter of the 19611-055-PN01 grant. Since we could not determine if the transactions were properly classified as nonpublic school expenditures, we were unable to determine compliance with the earmarking requirements. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framwork', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 2 CFR 200.207(a) states in part: "The Federal awarding agency or pass-through entity may impose additional specific award conditions as needed . . ." 511 IAC 7-34-7(b) states: "The public agency, in providing special education and related services to students in nonpublic schools must expend at least an amount that is the same proportion of the public agency total subgrant under 20 U.S.C. 1411(f) as the number of nonpublic school students with disabilities, who are enrolled by their parents in nonpublic schools within its boundaries, is to the total number of students with disabilities of the same age range." Cause The School Corporation had not established a system of internal controls to ensure compliance with the grant agreement and the earmarking requirement of the Matching, Level of Effort, Earmarking compliance requirement. Effect The failure to maintain and provide appropriate supporting documentation prevented the determination of the School Corporation's compliance with the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the School Corporation's management establish a system of internal controls and maintain adequate supporting documentation to ensure compliance with the grant agreement and the earmarking requirements of the Matching, Level of Effort, Earmarking compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.

Corrective Action Plan

FINDING 2020-005: Special Education Cluster (IDEA) ? Earmarking Contact Person Responsible for Corrective Action: Greg Hunt, Assistant Superintendent for Business & Operations Contact Phone Number: (219) 362-7056 Views of Responsible Official: We concur with the finding during the beginning of this audit period only. Description of Corrective Action Plan: Condition and Context During our 2016-2018 audit, the SBoA auditor indicated that our handwritten calculations for the percentage of time spent for nonpublic school expenditures wasn?t sufficient enough. We immediately created a spreadsheet, showed it to the auditor and he verified that the spreadsheet is acceptable. We continue to collect the Time and Effort logs for our staff members that work with our nonpublic school students. Proportionate share forms and Time and Effort logs are reviewed and we also obtain dual signatures on the spreadsheets containing the percentages. Anticipated Completion Date: May 2019

Prior Finding References

2018-013

About Matching, Level of Effort, Earmarking →

FY 2018-06-30

NON-GAAP BASISMATERIAL NONCOMPLIANCE DISCLOSED$10,555,369 federal awards expended

FAC accepted this audit on May 28, 2019 — management decision was due November 28, 2019.

2018-003
Equipment & Real Property
MATERIAL WEAKNESSMODIFIED OPINIONREPEAT OF 2016-004

GSA_MIGRATION

Show full finding ▾
Full finding narrative

GSA_MIGRATION

Corrective Action Plan

GSA_MIGRATION

Prior Finding References

2016-004

About Equipment and Real Property Management →
2018-004
Program Income
MATERIAL WEAKNESSMODIFIED OPINIONREPEAT OF 2016-005

GSA_MIGRATION

Show full finding ▾
Full finding narrative

GSA_MIGRATION

Corrective Action Plan

GSA_MIGRATION

Prior Finding References

2016-005

About Program Income →
2018-005
Eligibility / Special Tests & Provisions
MATERIAL WEAKNESS

GSA_MIGRATION

Show full finding ▾
Full finding narrative

GSA_MIGRATION

Corrective Action Plan

GSA_MIGRATION

About Eligibility, Special Tests and Provisions →
2018-006
Cost Allowability / Program Income
MATERIAL WEAKNESSMODIFIED OPINION

GSA_MIGRATION

Show full finding ▾
Full finding narrative

GSA_MIGRATION

Corrective Action Plan

GSA_MIGRATION

About Allowable Costs / Cost Principles, Program Income →
2018-007
Procurement & Suspension/Debarment
MATERIAL WEAKNESSMODIFIED OPINION

GSA_MIGRATION

Show full finding ▾
Full finding narrative

GSA_MIGRATION

Corrective Action Plan

GSA_MIGRATION

About Procurement and Suspension and Debarment →
2018-008
Reporting
MATERIAL WEAKNESSMODIFIED OPINION

GSA_MIGRATION

Show full finding ▾
Full finding narrative

GSA_MIGRATION

Corrective Action Plan

GSA_MIGRATION

About Reporting →
2018-009
Matching, Level of Effort, Earmarking / Reporting
MATERIAL WEAKNESS

GSA_MIGRATION

Show full finding ▾
Full finding narrative

GSA_MIGRATION

Corrective Action Plan

GSA_MIGRATION

About Matching, Level of Effort, Earmarking, Reporting →
2018-010
Reporting
MATERIAL WEAKNESSOTHER MATTERS

GSA_MIGRATION

Show full finding ▾
Full finding narrative

GSA_MIGRATION

Corrective Action Plan

GSA_MIGRATION

About Reporting →
2018-011
Special Tests & Provisions
MATERIAL WEAKNESSOTHER MATTERS

GSA_MIGRATION

Show full finding ▾
Full finding narrative

GSA_MIGRATION

Corrective Action Plan

GSA_MIGRATION

About Special Tests and Provisions →
2018-012
Cost Allowability / Cash Management / Reporting
MATERIAL WEAKNESSMODIFIED OPINIONQUESTIONED COSTS

GSA_MIGRATION

Show full finding ▾
Full finding narrative

GSA_MIGRATION

Corrective Action Plan

GSA_MIGRATION

About Allowable Costs / Cost Principles, Cash Management, Reporting →
2018-013
Matching, Level of Effort, Earmarking / Reporting
MATERIAL WEAKNESSMODIFIED OPINION

GSA_MIGRATION

Show full finding ▾
Full finding narrative

GSA_MIGRATION

Corrective Action Plan

GSA_MIGRATION

About Matching, Level of Effort, Earmarking, Reporting →

FY 2016-06-30

ADVERSE OPINIONMATERIAL NONCOMPLIANCE DISCLOSED$10,972,435 federal awards expended

FAC accepted this audit on July 30, 2017 — management decision was due January 30, 2018.

2016-003
Cash Management
MATERIAL WEAKNESSOTHER MATTERS

GSA_MIGRATION

Show full finding ▾
Full finding narrative

GSA_MIGRATION

Corrective Action Plan

GSA_MIGRATION

About Cash Management →
2016-004
Equipment & Real Property
MATERIAL WEAKNESSOTHER MATTERS

GSA_MIGRATION

Show full finding ▾
Full finding narrative

GSA_MIGRATION

Corrective Action Plan

GSA_MIGRATION

About Equipment and Real Property Management →
2016-005
Program Income
MATERIAL WEAKNESSMODIFIED OPINION

GSA_MIGRATION

Show full finding ▾
Full finding narrative

GSA_MIGRATION

Corrective Action Plan

GSA_MIGRATION

About Program Income →
2016-006
Procurement & Suspension/Debarment
MATERIAL WEAKNESSMODIFIED OPINION

GSA_MIGRATION

Show full finding ▾
Full finding narrative

GSA_MIGRATION

Corrective Action Plan

GSA_MIGRATION

About Procurement and Suspension and Debarment →
2016-007
Special Tests & Provisions
MATERIAL WEAKNESSOTHER MATTERS

GSA_MIGRATION

Show full finding ▾
Full finding narrative

GSA_MIGRATION

Corrective Action Plan

GSA_MIGRATION

About Special Tests and Provisions →

Data source: This information comes from the Federal Audit Clearinghouse, the official repository of Single Audit data. All data is public domain. Verify this organization's audit history at fac.gov.

Are you this organization?

Track your findings and corrective action plans across audit cycles.

Start tracking findings →

Do you fund this organization?

Monitor subrecipient audit findings and filing records.

Start monitoring →

Product

Resources

Legal

Single Audit Intelligence is an independent tool powered by Federal Audit Clearinghouse data. Not affiliated with GSA, OMB, or any federal agency.

© 2026 Single Audit Intelligence. All data is public domain.