EIN: 356000163
UEI: EM7PQTXJA8F4
Audited by: Indiana State Board of Accounts
Oversight agency: 21 [Department of the Treasury]
View federal awards & risk assessment →
Data as of August 28, 2026
Management decision deadline — for entities that funded this organization
The FAC accepted this audit on September 30, 2024. Under 2 CFR 200.521(d), a pass-through entity that provided federal funds to this organization for this audit period must issue a management decision on these findings by March 30, 2025 (517 days ago).
What is a management decision? →FINDING 2023-002 Subject: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds - Suspension and Debarment Federal Agency: Department of the Treasury Federal Program: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds Assistance Listings Number: 21.027 Federal Award Number and Year (or Other Identifying Number): 2023 Compliance Requirement: Procurement and Suspension and Debarment Audit Findings: Material Weakness, Modified Opinion Condition and Context Prior to entering into subawards and covered transactions with the Coronavirus State and Local Fiscal Recovery Funds (SLFRF) award funds, recipients are required to verify that such contractors and subrecipients are not suspended, debarred, or otherwise excluded. "Covered transactions" include, but are not limited to, contracts for goods and services awarded under a nonprocurement transaction (i.e., grant agreement) that are expected to equal or exceed $25,000. The verification is to be done by checking the Excluded Parties List System (EPLS), collecting a certification from that person, or adding a clause or condition to the covered transaction with that person. The County did not have any policies or procedures in place related to the suspension and debarment requirements. A population of nine covered transactions, totaling $2,191,770, that equaled or exceeded $25,000 paid from SLFRF funds were identified. Four of the nine covered transactions, totaling $1,784,846, were selected for testing. For each of the four transactions, the County did not verify the vendors' suspension or debarment status prior to payment due to the County not having any policies or procedures in place to verify that contractors were neither suspended nor debarred, or otherwise excluded or disqualified, from participating in federal assistance programs or activities. The lack of internal controls and noncompliance were systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: INDIANA STATE BOARD OF ACCOUNTS 16 JENNINGS COUNTY SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 31 CFR 19.300 states: "When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you do business is not excluded or disqualified. You do this by: (a) Checking the EPLS; or (b) Collecting a certification from that person if allowed by this rule; or (c) Adding a clause or condition to the covered transaction with that person." Cause The County's purchasing policy does not include procedures to verify suspension and debarment status for covered transactions it intends to pay with federal funds. The County was not aware of the suspension and debarment requirements at the time the covered transactions were entered into. Effect Without the proper implementation of an effectively designed system of internal controls, the County cannot ensure that contractors paid with federal funds are eligible to participate in federal programs. Any program funds the County used to pay contractors that have been suspended or debarred would be unallowable, and the funding agency could potentially recover them. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the County. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the County establish a proper system of internal controls, including strengthening its policies and procedures to ensure that all contractors that are paid $25,000 or more, all or in part with federal funds, are not suspended or debarred from participating in federal programs before entering into contracts. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
Show full finding ▾Hide full finding ▴FINDING 2023-002 Subject: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds - Suspension and Debarment Federal Agency: Department of the Treasury Federal Program: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds Assistance Listings Number: 21.027 Federal Award Number and Year (or Other Identifying Number): 2023 Compliance Requirement: Procurement and Suspension and Debarment Audit Findings: Material Weakness, Modified Opinion Condition and Context Prior to entering into subawards and covered transactions with the Coronavirus State and Local Fiscal Recovery Funds (SLFRF) award funds, recipients are required to verify that such contractors and subrecipients are not suspended, debarred, or otherwise excluded. "Covered transactions" include, but are not limited to, contracts for goods and services awarded under a nonprocurement transaction (i.e., grant agreement) that are expected to equal or exceed $25,000. The verification is to be done by checking the Excluded Parties List System (EPLS), collecting a certification from that person, or adding a clause or condition to the covered transaction with that person. The County did not have any policies or procedures in place related to the suspension and debarment requirements. A population of nine covered transactions, totaling $2,191,770, that equaled or exceeded $25,000 paid from SLFRF funds were identified. Four of the nine covered transactions, totaling $1,784,846, were selected for testing. For each of the four transactions, the County did not verify the vendors' suspension or debarment status prior to payment due to the County not having any policies or procedures in place to verify that contractors were neither suspended nor debarred, or otherwise excluded or disqualified, from participating in federal assistance programs or activities. The lack of internal controls and noncompliance were systemic throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: INDIANA STATE BOARD OF ACCOUNTS 16 JENNINGS COUNTY SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." 31 CFR 19.300 states: "When you enter into a covered transaction with another person at the next lower tier, you must verify that the person with whom you do business is not excluded or disqualified. You do this by: (a) Checking the EPLS; or (b) Collecting a certification from that person if allowed by this rule; or (c) Adding a clause or condition to the covered transaction with that person." Cause The County's purchasing policy does not include procedures to verify suspension and debarment status for covered transactions it intends to pay with federal funds. The County was not aware of the suspension and debarment requirements at the time the covered transactions were entered into. Effect Without the proper implementation of an effectively designed system of internal controls, the County cannot ensure that contractors paid with federal funds are eligible to participate in federal programs. Any program funds the County used to pay contractors that have been suspended or debarred would be unallowable, and the funding agency could potentially recover them. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the County. Questioned Costs There were no questioned costs identified. Recommendation We recommended that management of the County establish a proper system of internal controls, including strengthening its policies and procedures to ensure that all contractors that are paid $25,000 or more, all or in part with federal funds, are not suspended or debarred from participating in federal programs before entering into contracts. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-002 Finding Subject: COVID 19- Coronavirus State and Local Fiscal Recovery Funds-Suspension and Debarment. Summary of Finding: Prior to entering into subawards and covered transactions the Coronavirus State and Local Fiscal Recovery Funds (SLFRF) award funds, recipients are required to verify that such contractors and subrecipients are not suspended, debarred, or otherwise excluded. The County did not have any policies or procedures in place related to the suspension and debarment requirements. Contact Person Responsible for Corrective Action: Sarah Abel Contact Phone Number and Email Address: 812-352-3016. sabel@jenningscounty-in.gov Views of Responsible Officials: We concur with the finding. Description of Corrective Action Plan: The County's purchasing and procedure policy for federal funds that equal or exceed $25,000 from SLFRF recovery funds will include a clause within the contract to include the suspension and debarment compliance requirement. Anticipated Completion Date: 9-12-2024
FINDING 2023-003 Subject: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds - Reporting Federal Agency: Department of the Treasury Federal Program: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds Assistance Listings Number: 21.027 Federal Award Number and Year (or Other Identifying Number): 2023 Compliance Requirement: Reporting Audit Findings: Material Weakness, Other Matters Condition and Context Recipients are required to submit quarterly or annually Project and Expenditure (P&E) reports to the U.S. Department of the Treasury (Treasury). The reporting periods, as well as the respective due dates, are based upon type of recipient and its population, as well as the recipient's allocation amount. Information to be reported includes projects funded, expenditures, and contracts for the appropriate reporting period. The County was classified as a metropolitan county with a population below 250,000 residents that received an allocation of less than $10 million in COVID-19 - Coronavirus State and Local Fiscal Recovery Funds (SLFRF) award funds. As such, the initial P&E report, covering the period from March 3, 2021 to March 31, 2022, was required to be submitted to the Treasury by April 30, 2022. The subsequent annual reports are to cover one calendar year and must be submitted to the Treasury by April 30 each year. The County submitted one P&E report during the audit period; however, the internal controls in place were not effective and did not detect and allow for the correction of errors. As a result, errors in reporting were identified. The cumulative obligations and expenditures and current period obligations and expenditures were incorrectly reported. The cumulative obligations and expenditures and current period obligations and expenditures were reported as $0; however, obligations and expenditures in the amount of $792,766 should have been reported. The lack of internal controls and noncompliance were isolated to the annual P&E report. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 18 JENNINGS COUNTY SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Coronavirus State and Local Fiscal Recovery Funds Compliance and Reporting Guidance, page 10, states in part: ". . . 10. Reporting. All recipients of federal funds must complete financial, performance, and compliance reporting as required and outlined in Part 2 of this guidance. Expenditures may be reported on a cash or accrual basis, as long as the methodology is disclosed and consistently applied. Reporting must be consistent with the definition of expenditures pursuant to 2 CFR 200.1. Your organization should appropriately maintain accounting records for compiling and reporting accurate, compliant financial data, in accordance with appropriate accounting standards and principles. . . ." 31 CFR 35.4(c) states in part: "Reporting and requests for other information. During the period of performance, recipients shall provide to the Secretary periodic reports providing detailed accounting of the uses of funds, . . ." Cause The County's oversight process for filing the P&E report for the period of April 1 2022 to March 31, 2023, did not detect errors. The County had expenditures for the reporting period; however, the expenditures were posted in the incorrect funds. The errors in posting were not identified and corrected until August 2023. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As such, the County did not report cumulative obligations and expenditures and current period obligations and expenditure properly when filing the P&E report for the period April 1, 2022 to March 31, 2023. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the County. In addition, not meeting the SLFRF reporting requirements increases the likelihood that the public will not have access to transparent and accurate information regarding expenditures of federal awards. Questioned Costs There were no questioned costs identified. Recommendation We recommended the County strengthen its system of internal controls to ensure that all obligations and expenditures are properly reported to the Treasury so as to ensure the Treasury is provided complete and accurate information for the P&E report. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
Show full finding ▾Hide full finding ▴FINDING 2023-003 Subject: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds - Reporting Federal Agency: Department of the Treasury Federal Program: COVID-19 - Coronavirus State and Local Fiscal Recovery Funds Assistance Listings Number: 21.027 Federal Award Number and Year (or Other Identifying Number): 2023 Compliance Requirement: Reporting Audit Findings: Material Weakness, Other Matters Condition and Context Recipients are required to submit quarterly or annually Project and Expenditure (P&E) reports to the U.S. Department of the Treasury (Treasury). The reporting periods, as well as the respective due dates, are based upon type of recipient and its population, as well as the recipient's allocation amount. Information to be reported includes projects funded, expenditures, and contracts for the appropriate reporting period. The County was classified as a metropolitan county with a population below 250,000 residents that received an allocation of less than $10 million in COVID-19 - Coronavirus State and Local Fiscal Recovery Funds (SLFRF) award funds. As such, the initial P&E report, covering the period from March 3, 2021 to March 31, 2022, was required to be submitted to the Treasury by April 30, 2022. The subsequent annual reports are to cover one calendar year and must be submitted to the Treasury by April 30 each year. The County submitted one P&E report during the audit period; however, the internal controls in place were not effective and did not detect and allow for the correction of errors. As a result, errors in reporting were identified. The cumulative obligations and expenditures and current period obligations and expenditures were incorrectly reported. The cumulative obligations and expenditures and current period obligations and expenditures were reported as $0; however, obligations and expenditures in the amount of $792,766 should have been reported. The lack of internal controls and noncompliance were isolated to the annual P&E report. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." INDIANA STATE BOARD OF ACCOUNTS 18 JENNINGS COUNTY SCHEDULE OF FINDINGS AND QUESTIONED COSTS (Continued) Coronavirus State and Local Fiscal Recovery Funds Compliance and Reporting Guidance, page 10, states in part: ". . . 10. Reporting. All recipients of federal funds must complete financial, performance, and compliance reporting as required and outlined in Part 2 of this guidance. Expenditures may be reported on a cash or accrual basis, as long as the methodology is disclosed and consistently applied. Reporting must be consistent with the definition of expenditures pursuant to 2 CFR 200.1. Your organization should appropriately maintain accounting records for compiling and reporting accurate, compliant financial data, in accordance with appropriate accounting standards and principles. . . ." 31 CFR 35.4(c) states in part: "Reporting and requests for other information. During the period of performance, recipients shall provide to the Secretary periodic reports providing detailed accounting of the uses of funds, . . ." Cause The County's oversight process for filing the P&E report for the period of April 1 2022 to March 31, 2023, did not detect errors. The County had expenditures for the reporting period; however, the expenditures were posted in the incorrect funds. The errors in posting were not identified and corrected until August 2023. Effect Without the proper implementation of an effectively designed system of internal controls, the internal control system cannot be capable of effectively preventing, or detecting and correcting, material noncompliance. As such, the County did not report cumulative obligations and expenditures and current period obligations and expenditure properly when filing the P&E report for the period April 1, 2022 to March 31, 2023. Noncompliance with the provisions of federal statutes, regulations, and the terms and conditions of the federal award could result in the loss of future federal funding to the County. In addition, not meeting the SLFRF reporting requirements increases the likelihood that the public will not have access to transparent and accurate information regarding expenditures of federal awards. Questioned Costs There were no questioned costs identified. Recommendation We recommended the County strengthen its system of internal controls to ensure that all obligations and expenditures are properly reported to the Treasury so as to ensure the Treasury is provided complete and accurate information for the P&E report. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2023-003 Finding Subject: COVID 19- Coronavirus State and Local Fiscal Recovery Funds-Reporting. Summary of Finding: Recipients are required to submit quarterly or annually Project and Expenditure (P&E reports to the U.S Department of the Treasury portal. The reporting periods as well as the respective due dates are based upon the type of recipient and its population, as well as the recipient's allocation amount. As such, the County did not report cumulative obligations and expenditures and current period obligations and expenditures properly when filing the P&E report for the period April 1, 2022, to March 31, 2023 Contact Person Responsible for Corrective Action: Sarah Abel Contact Phone Number and Email Address: 812-352-3016. sabel@jenningscounty-in.gov Views of Responsible Officials: We concur with the finding. Description of Corrective Action Plan: Report cumulative obligations and expenditures and current period obligations and expenditures when filing the project and expenditure report for the final reporting of remaining SLFRF funds. The final report will be closing out the SLFRF process and is to be submitted by 5/1/2025. Final report will be prepared by 1st Deputy and reviewed by Auditor, prior to submission. Anticipated Completion Date: 5/1/2025
FAC accepted this audit on July 17, 2023 — management decision was due January 17, 2024.
FAC accepted this audit on September 29, 2022 — management decision was due March 29, 2023.
FAC accepted this audit on October 27, 2021 — management decision was due April 27, 2022.
FAC accepted this audit on October 21, 2020 — management decision was due April 21, 2021.
FINDING 2019-004 Subject: Community Development Block Grants/State's program and Non-Entitlement Grants in Hawaii - Reporting Federal Agency: Department of Housing and Urban Development Federal Program: Community Development Block Grants/State's program and Non-Entitlement Grants in Hawaii CFDA Number: 14.228 Federal Award Numbers and Years (or Other Identifying Numbers): HD-017-014, PF-16-104 Pass-Through Entity: Indiana Department of Housing and Urban Development Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context An effective internal control system, which would include segregation of duties, was not in place at the County in order to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The County had not established internal controls over the Semi-Annual Reporting requirement. The County relied on the grant administrator for monitoring compliance with the Reporting compliance requirement. The Semi-Annual Report was prepared and submitted by the grant administrator. There were no internal controls procedures in place, such as an oversight, review, or approval process, to ensure compliance with the Reporting compliance requirement. The lack of controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause County's management had not developed a system of internal controls that segregated key functions. Effect The failure to establish an effective internal control system placed the County at risk of noncompliance with the grant agreement and the Reporting compliance requirement. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the County establish and implement internal control procedures to ensure compliance with the grant agreement and the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
Show full finding ▾Hide full finding ▴FINDING 2019-004 Subject: Community Development Block Grants/State's program and Non-Entitlement Grants in Hawaii - Reporting Federal Agency: Department of Housing and Urban Development Federal Program: Community Development Block Grants/State's program and Non-Entitlement Grants in Hawaii CFDA Number: 14.228 Federal Award Numbers and Years (or Other Identifying Numbers): HD-017-014, PF-16-104 Pass-Through Entity: Indiana Department of Housing and Urban Development Compliance Requirement: Reporting Audit Finding: Material Weakness Condition and Context An effective internal control system, which would include segregation of duties, was not in place at the County in order to ensure compliance with requirements related to the grant agreement and the Reporting compliance requirement. The County had not established internal controls over the Semi-Annual Reporting requirement. The County relied on the grant administrator for monitoring compliance with the Reporting compliance requirement. The Semi-Annual Report was prepared and submitted by the grant administrator. There were no internal controls procedures in place, such as an oversight, review, or approval process, to ensure compliance with the Reporting compliance requirement. The lack of controls was a systemic issue throughout the audit period. Criteria 2 CFR 200.303 states in part: "The non-Federal entity must: (a) Establish and maintain effective internal control over the Federal award that provides reasonable assurance that the non-Federal entity is managing the Federal award in compliance with Federal statutes, regulations, and the terms and conditions of the Federal award. These internal controls should be in compliance with guidance in 'Standards for Internal Control in the Federal Government' issued by the Comptroller General of the United States or the 'Internal Control Integrated Framework', issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). . . ." Cause County's management had not developed a system of internal controls that segregated key functions. Effect The failure to establish an effective internal control system placed the County at risk of noncompliance with the grant agreement and the Reporting compliance requirement. Questioned Costs There were no questioned costs identified. Recommendation We recommended that the County establish and implement internal control procedures to ensure compliance with the grant agreement and the Reporting compliance requirement. Views of Responsible Officials For the views of responsible officials, refer to the Corrective Action Plan that is part of this report.
FINDING 2019-004 Contact Person Responsible for Corrective Action: Tessia Salsman Jennings County Auditor Contact Phone Number: 812-352-3016 Views of Responsible Official: We concur with finding. Description of Corrective Action Plan: Grant Administrator will start sending copies by email and I will verify. Anticipated Completion Date: 09/25/2020
FAC accepted this audit on October 20, 2019 — management decision was due April 20, 2020.
Data source: This information comes from the Federal Audit Clearinghouse, the official repository of Single Audit data. All data is public domain. Verify this organization's audit history at fac.gov.
Track your findings and corrective action plans across audit cycles.
Start tracking findings →Monitor subrecipient audit findings and filing records.
Start monitoring →© 2026 Single Audit Intelligence. All data is public domain.