← Back to home

Columbiana Metropolitan Housing AuthorityLocal Government

EIN: 340976597

UEI: GZKLMETKM2W7

Audited by: Novogradac & Company, LLP

Oversight agency: 14 [Department of Housing and Urban Development]

View federal awards & risk assessment →

Data as of August 28, 2026

Columbiana Metropolitan Housing Authority10 audit years5 findings1 repeat
10
Audit Years
5
Total Findings
1
Repeat Findings
$7.7M
Federal Awards Expended (FY 2025)

FY 2025-06-30

GOING CONCERN$7,677,145 federal awards expendedNo findings recorded this year

Management decision deadline — for entities that funded this organization

The FAC accepted this audit on March 31, 2026. Under 2 CFR 200.521(d), a pass-through entity that provided federal funds to this organization for this audit period must issue a management decision on these findings by October 1, 2026 (32 days from today).

What is a management decision? →

FY 2024-06-30

MATERIAL NONCOMPLIANCE DISCLOSED$6,651,239 federal awards expended

FAC accepted this audit on April 3, 2025 — management decision was due October 3, 2025.

2024-001
Special Tests & Provisions
MATERIAL WEAKNESSMODIFIED OPINIONREPEAT OF 2023-003QUESTIONED COSTS

Based upon inspection of the waiting list provided to us during the time of audit, the new move-in list and discussions with management, it could not be determined with any certainty that new move-ins were selected from the waiting list in an order that is in accordance with the Authority’s policy. Context: Eight (8) names were selected from the new move-in list and those names were to be traced to the waiting list to verify new move-ins were chosen in an order that was in accordance with the Authority’s policy. It was determined that eight (8) out of eight (8) new move-ins selected could not be traced with any certainty back to the Authority's waiting list. Known Questioned Costs: $38,767 Cause: There is a material weakness in internal controls over the compliance for the special tests and provisions type of compliance related to selections from the waiting list. The Authority has not properly considered, designed, implemented, maintained and monitored a system of internal controls that assures the programs are in compliance. Effect: The Section 8 Housing Choice Vouchers and Mainstream Vouchers programs are in material non-compliance with the special tests and provisions type of compliance related to selections from the waiting list. Recommendation: We recommend the Authority design and implement internal control procedures that will reasonably assure compliance with the Uniform Guidance and the compliance supplement. Views of responsible officials and planned corrective action: The Authority has recognized the material weakness in the Section 8 Housing Choice Vouchers and Mainstream Vouchers programs and will implement internal control procedures that will ensure compliance with federal regulations.

Show full finding ▾
Full finding narrative

Federal Program Titles: Section 8 Housing Choice Vouchers and Mainstream Vouchers Federal Assistance Listing Numbers: 14.871 and 14.879 Noncompliance – N. Special Tests and Provisions – Selections from the Waiting List Non Compliance Material to the Financial Statements: Yes Material Weakness in Internal Control over Compliance for Special Tests and Provisions Criteria: Selections from the Waiting List. The PHA must have written policies in its HCVP administrative plan for selecting applicants from the waiting list and PHA documentation must show that the PHA follows these policies when selecting applicants from the waiting list. Except for as provided in 24 CFR section 982.203(Special admission (non-waiting list)), all families admitted to the program must be selected from the waiting list. “Selection” from the waiting list generally occurs when the PHA notifies a family whose name reaches the top of the waiting list to come in to verify eligibility for admission (24CFR sections 5.410, 982.54(d), and 982.201 through 982.207). Condition: Based upon inspection of the waiting list provided to us during the time of audit, the new move-in list and discussions with management, it could not be determined with any certainty that new move-ins were selected from the waiting list in an order that is in accordance with the Authority’s policy. Context: Eight (8) names were selected from the new move-in list and those names were to be traced to the waiting list to verify new move-ins were chosen in an order that was in accordance with the Authority’s policy. It was determined that eight (8) out of eight (8) new move-ins selected could not be traced with any certainty back to the Authority's waiting list. Known Questioned Costs: $38,767 Cause: There is a material weakness in internal controls over the compliance for the special tests and provisions type of compliance related to selections from the waiting list. The Authority has not properly considered, designed, implemented, maintained and monitored a system of internal controls that assures the programs are in compliance. Effect: The Section 8 Housing Choice Vouchers and Mainstream Vouchers programs are in material non-compliance with the special tests and provisions type of compliance related to selections from the waiting list. Recommendation: We recommend the Authority design and implement internal control procedures that will reasonably assure compliance with the Uniform Guidance and the compliance supplement. Views of responsible officials and planned corrective action: The Authority has recognized the material weakness in the Section 8 Housing Choice Vouchers and Mainstream Vouchers programs and will implement internal control procedures that will ensure compliance with federal regulations.

Corrective Action Plan

Views of responsible officials and planned corrective action: The Authority has recognized the material weakness in the Section 8 Housing Choice Vouchers and Mainstream Vouchers programs and will implement internal control procedures that will ensure compliance with federal regulations. CMHA is aware that the HAB/MRI software does not store waitlist reports by date processed and since then, CMHA has been saving Excel files of the waitlist reports. The applicants that were selected for the audit were applicants that had preference points. All applicants with preference points were contacted at the same time to be informed that they were eligible for a voucher. The CMHA waitlists were ran by preference points and time/date of application. Once those applicants were pulled the waitlist was not saved to Excel. The preference point list was then sorted alphabetically for sign in purposes and tracking of applicant documentation. This is the list that was provided to the auditor. Melissa Beadle, Deputy Director, will be responsible to implement this corrective action by June 30, 2025.

Prior Finding References

2023-003

About Special Tests and Provisions →

FY 2023-06-30

MATERIAL NONCOMPLIANCE DISCLOSED$6,886,101 federal awards expended

FAC accepted this audit on March 29, 2024 — management decision was due September 29, 2024.

2023-001
Special Tests & Provisions
MATERIAL WEAKNESSMODIFIED OPINIONQUESTIONED COSTS

Based upon inspection of the Authority’s files and on discussion with management there were inspection reports that were unavailable for examination at the time of audit. Context: Of a sample size of twenty-four (24) units, nine (9) units did not have an annual HQS inspection performed. Our sample size is statistically valid. Known Questioned Costs: $12,890 Cause: There is a material weakness in internal controls over the compliance for the special tests and provisions type of compliance related to HQS inspections. The Authority has not properly considered, designed, implemented, maintained and monitored a system of internal controls that assures the program is in compliance. Effect: The Section 8 Housing Choice Vouchers and Mainstream Vouchers programs are in material non-compliance with the special tests and provisions type of compliance related to HQS inspections. Recommendation: We recommend the Authority design and implement internal control procedures that will reasonably assure compliance with the Uniform Guidance and the compliance supplement. Views of responsible officials and planned corrective action: The Authority has recognized the material weakness in the Section 8 Housing Choice Vouchers and Mainstream Vouchers programs and will implement internal control procedures that will ensure compliance with federal regulations.

Show full finding ▾
Full finding narrative

Federal Agency: U.S. Department of Housing and Urban Development Federal Program Titles: Section 8 Housing Choice Vouchers and Mainstream Vouchers Federal Assistance Listing Numbers: 14.871 and 14.879 Noncompliance – N. Special Tests and Provisions – Housing Quality Standards (HQS) Inspections Non Compliance Material to the Financial Statements: Yes Material Weakness in Internal Control over Compliance for Special Tests and Provisions Criteria: HQS Inspections. Per the Authority's HCV Admin Plan, the PHA must inspect the unit leased to a family at least annually to determine if the unit meets the HQS and the PHA must conduct quality control re-inspections. The PHA must prepare a unit inspection report (24 CFR sections 982.158(d) and 982.405(b)). These inspection reports are required to be maintained and available for examination at the time of audit. Condition: Based upon inspection of the Authority’s files and on discussion with management there were inspection reports that were unavailable for examination at the time of audit. Context: Of a sample size of twenty-four (24) units, nine (9) units did not have an annual HQS inspection performed. Our sample size is statistically valid. Known Questioned Costs: $12,890 Cause: There is a material weakness in internal controls over the compliance for the special tests and provisions type of compliance related to HQS inspections. The Authority has not properly considered, designed, implemented, maintained and monitored a system of internal controls that assures the program is in compliance. Effect: The Section 8 Housing Choice Vouchers and Mainstream Vouchers programs are in material non-compliance with the special tests and provisions type of compliance related to HQS inspections. Recommendation: We recommend the Authority design and implement internal control procedures that will reasonably assure compliance with the Uniform Guidance and the compliance supplement. Views of responsible officials and planned corrective action: The Authority has recognized the material weakness in the Section 8 Housing Choice Vouchers and Mainstream Vouchers programs and will implement internal control procedures that will ensure compliance with federal regulations.

Corrective Action Plan

Views of responsible officials and planned corrective action: The Authority has recognized the material weakness in the Section 8 Housing Choice Vouchers and Mainstream Voucher programs and will implement internal control procedures that will ensure compliance with federal regulations. Michael McDougle, HCV Manager, will be responsible to implement this corrective action by June 30, 2024. CMHA has been working diligently over the past IO months to correct the inspection process that was not completed by the contracted inspectors through Inspection Group. Tenants were under the impression that they were not required to have inspections if someone was sick in their household, as previously waived during the pandemic. The HCV tenants have since been informed with each month's recertification mailing that they are required under HUD regulations to have an annual inspection. CMHA has also trained and assigned two HCV staff to become inspectors and have a process in place where one employee completes the annual inspections and the other employee follows up on the reinspection as needed. If inspections are not completed by time of recertification, the HAP payment is held. To date, annual inspections have been completed by CMHA staff.

About Special Tests and Provisions →
2023-002
Special Tests & Provisions
MATERIAL WEAKNESSMODIFIED OPINIONQUESTIONED COSTS

Based upon inspection of the Authority’s files and on discussion with management there were inspection reports that were unavailable for examination at the time of audit. Context: The Authority was not able to provide eight (8) out of eight (8) failed and passed inspections selected for testing. As a result, we were unable to determine if the units meet the HQS as required by 24 CFR sections 982.158(d) and 982.405(b). Known Questioned Costs: $39,511 Cause: There is a material weakness in internal controls over the compliance for the special tests and provisions type of compliance related to HQS inspections. The Authority has not properly considered, designed, implemented, maintained and monitored a system of internal controls that assures the program is in compliance. Effect: The Section 8 Housing Choice Vouchers and Mainstream Vouchers programs are in material non-compliance with the special tests and provisions type of compliance related to HQS enforcement. Recommendation: We recommend the Authority design and implement internal control procedures that will reasonably assure compliance with the Uniform Guidance and the compliance supplement. Views of responsible officials and planned corrective action: The Authority has recognized the material weakness in the Section 8 Housing Choice Vouchers and Mainstream Vouchers programs and will implement internal control procedures that will ensure compliance with federal regulations.

Show full finding ▾
Full finding narrative

Federal Agency: U.S. Department of Housing and Urban Development Federal Program Titles: Section 8 Housing Choice Vouchers and Mainstream Vouchers Federal Assistance Listing Numbers: 14.871 and 14.879 Noncompliance – N. Special Tests and Provisions – HQS Enforcement Non Compliance Material to the Financial Statements: Yes Material Weakness in Internal Control over Compliance for Special Tests and Provisions Criteria: HQS Enforcement. For units under HAP contract that fail to meet HQS, the PHA must require the owner to correct all life threatening HQS deficiencies within 24 hours after the inspections and all other deficiencies within 30 days or within a specified PHA-approved extension. Condition: Based upon inspection of the Authority’s files and on discussion with management there were inspection reports that were unavailable for examination at the time of audit. Context: The Authority was not able to provide eight (8) out of eight (8) failed and passed inspections selected for testing. As a result, we were unable to determine if the units meet the HQS as required by 24 CFR sections 982.158(d) and 982.405(b). Known Questioned Costs: $39,511 Cause: There is a material weakness in internal controls over the compliance for the special tests and provisions type of compliance related to HQS inspections. The Authority has not properly considered, designed, implemented, maintained and monitored a system of internal controls that assures the program is in compliance. Effect: The Section 8 Housing Choice Vouchers and Mainstream Vouchers programs are in material non-compliance with the special tests and provisions type of compliance related to HQS enforcement. Recommendation: We recommend the Authority design and implement internal control procedures that will reasonably assure compliance with the Uniform Guidance and the compliance supplement. Views of responsible officials and planned corrective action: The Authority has recognized the material weakness in the Section 8 Housing Choice Vouchers and Mainstream Vouchers programs and will implement internal control procedures that will ensure compliance with federal regulations.

Corrective Action Plan

Views of responsible officials and planned corrective action: The Authority has recognized the material weakness in the Section 8 Housing Choice Vouchers and Mainstream Vouchers programs and will implement internal control procedures that will ensure compliance with federal regulations. Michael McDougle, HCV Manager, will be responsible to implement this corrective action by June 30, 2024. CMHA has been working diligently over the past IO months to implement this corrective action with the current two CMHA employee inspectors that are following up on the life and safety 24 hour inspections and also the 30 day follow ups. When landlords have informed CMHA that they are unable to find contractors to complement the maintenance failed items, CMHA is making a note on the inspection forms and tenant file as landlords inform CM HA that they are in need of additional time. The inspection reports under this audit were completed by the contractor, Inspection Group and have since then been corrected. To date, all of the failed inspections have been reinspected and passed.

About Special Tests and Provisions →
2023-003
Special Tests & Provisions
MATERIAL WEAKNESSMODIFIED OPINIONQUESTIONED COSTS

Based upon inspection of the waiting list provided to us during the time of audit, the new move-in list and discussions with management, it could not be determined with any certainty that new move-ins were selected from the wait list in an order that is in accordance with the Authority’s policy. Context: Fifteen (15) names were selected from the new move-in list and those names were to be traced to the waiting list to verify new move-ins were chosen in an order that was in accordance with the Authority’s policy. It was determined that fifteen (15) out of fifteen (15) new move-ins selected could not be traced with any certainty back to the Authority's waiting list. Known Questioned Costs: $71,909 Cause: There is a material weakness in internal controls over the compliance for the special tests and provisions type of compliance related to selections from the waiting list. The Authority has not properly considered, designed, implemented, maintained and monitored a system of internal controls that assures the program is in compliance. Effect: The Section 8 Housing Choice Vouchers and Mainstream Vouchers programs are in material non-compliance with the special tests and provisions type of compliance related to selections from the waiting list. Recommendation: We recommend the Authority design and implement internal control procedures that will reasonably assure compliance with the Uniform Guidance and the compliance supplement. Views of responsible officials and planned corrective action: The Authority has recognized the material weakness in the Section 8 Housing Choice Vouchers and Mainstream Vouchers programs and will implement internal control procedures that will ensure compliance with federal regulations.

Show full finding ▾
Full finding narrative

Federal Agency: U.S. Department of Housing and Urban Development Federal Program Titles: Section 8 Housing Choice Vouchers and Mainstream Vouchers Federal Assistance Listing Numbers: 14.871 and 14.879 Noncompliance – N. Special Tests and Provisions – Selections from the Waiting List Non Compliance Material to the Financial Statements: Yes Material Weakness in Internal Control over Compliance for Special Tests and Provisions Criteria: Selections from the Waiting List. The PHA must have written policies in its HCVP administrative plan for selecting applicants from the waiting list and PHA documentation must show that the PHA follows these policies when selecting applicants from the waiting list. Except for as provided in 24 CFR section 982.203(Special admission (non-waiting list)), all families admitted to the program must be selected from the waiting list. “Selection” from the waiting list generally occurs when the PHA notifies a family whose name reaches the top of the waiting list to come in to verify eligibility for admission (24CFR sections 5.410, 982.54(d), and 982.201 through 982.207). Condition: Based upon inspection of the waiting list provided to us during the time of audit, the new move-in list and discussions with management, it could not be determined with any certainty that new move-ins were selected from the wait list in an order that is in accordance with the Authority’s policy. Context: Fifteen (15) names were selected from the new move-in list and those names were to be traced to the waiting list to verify new move-ins were chosen in an order that was in accordance with the Authority’s policy. It was determined that fifteen (15) out of fifteen (15) new move-ins selected could not be traced with any certainty back to the Authority's waiting list. Known Questioned Costs: $71,909 Cause: There is a material weakness in internal controls over the compliance for the special tests and provisions type of compliance related to selections from the waiting list. The Authority has not properly considered, designed, implemented, maintained and monitored a system of internal controls that assures the program is in compliance. Effect: The Section 8 Housing Choice Vouchers and Mainstream Vouchers programs are in material non-compliance with the special tests and provisions type of compliance related to selections from the waiting list. Recommendation: We recommend the Authority design and implement internal control procedures that will reasonably assure compliance with the Uniform Guidance and the compliance supplement. Views of responsible officials and planned corrective action: The Authority has recognized the material weakness in the Section 8 Housing Choice Vouchers and Mainstream Vouchers programs and will implement internal control procedures that will ensure compliance with federal regulations.

Corrective Action Plan

Views of responsible officials and planned corrective action: The Authority has recognized the material weakness in the Section 8 Housing Choice Vouchers and Mainstream Vouchers programs and will implement internal control procedures that will ensure compliance with federal regulations. Melissa Beadle, Deputy Director, will be responsible for implementing this corrective action by June 30, 2024. CMHA is aware that the HAB/MRI software does not store waitlist reports by date processed and since then, CMHA has been saving Excel files of the waitlist reports. The applicants that were selected for the audit were applicants that had preference points. All applicants with preference points were contacted at the same time to be informed that they were eligible for a voucher. The CMHA waitlists were ran by preference points and time/date of application. Once those applicants were pulled the waitlist was not saved to Excel. The preference point list was then sorted alphabetically for sign in purposes and tracking of applicant documentation. This is the list that was provided to the auditor.

About Special Tests and Provisions →

FY 2022-06-30

$5,554,737 federal awards expendedNo findings recorded this year

FAC accepted this audit on April 30, 2024 — management decision was due October 30, 2024.

FY 2021-06-30

$5,492,652 federal awards expendedNo findings recorded this year

FAC accepted this audit on June 14, 2022 — management decision was due December 14, 2022.

FY 2020-06-30

MATERIAL NONCOMPLIANCE DISCLOSED$6,548,599 federal awards expended

FAC accepted this audit on September 28, 2021 — management decision was due March 28, 2022.

2020-005
Activities Allowed or Unallowed / Cost Allowability / Cash Management
SIGNIFICANT DEFICIENCY

FINDINGS AND QUESTIONED COSTS FOR FEDERAL AWARDS

Show full finding ▾
Full finding narrative

FINDINGS AND QUESTIONED COSTS FOR FEDERAL AWARDS

Corrective Action Plan

FINDINGS AND QUESTIONED COSTS FOR FEDERAL AWARDS

About Activities Allowed or Unallowed, Allowable Costs / Cost Principles, Cash Management →

FY 2019-06-30

LOW-RISK AUDITEE$5,017,146 federal awards expendedNo findings recorded this year

FAC accepted this audit on March 29, 2020 — management decision was due September 29, 2020.

FY 2018-06-30

LOW-RISK AUDITEE$5,263,568 federal awards expendedNo findings recorded this year

FAC accepted this audit on January 21, 2019 — management decision was due July 21, 2019.

FY 2017-06-30

LOW-RISK AUDITEE$4,911,540 federal awards expendedNo findings recorded this year

FAC accepted this audit on January 15, 2018 — management decision was due July 15, 2018.

FY 2016-06-30

LOW-RISK AUDITEE$4,499,362 federal awards expendedNo findings recorded this year

FAC accepted this audit on January 11, 2017 — management decision was due July 11, 2017.

Data source: This information comes from the Federal Audit Clearinghouse, the official repository of Single Audit data. All data is public domain. Verify this organization's audit history at fac.gov.

Browse other Single Audit organizations in Nebraska

Are you this organization?

Track your findings and corrective action plans across audit cycles.

Start tracking findings →

Do you fund this organization?

Monitor subrecipient audit findings and filing records.