← Back to home

Epic Charter SchoolsLocal Government

EIN: 202774826

UEI: JNEHM8TCQM15

Audited by: Bledsoe Hewett & Gullekson

Oversight agency: 84 [Department of Education]

View federal awards & risk assessment →

Data as of September 2, 2026

Epic Charter Schools14 audit years4 findings2 repeat
14
Audit Years
4
Total Findings
2
Repeat Findings
$17.5M
Federal Awards Expended (FY 2025)

FY 2025-06-30

NON-GAAP BASIS$17,532,075 federal awards expendedNo findings recorded this year

Management decision deadline — for entities that funded this organization

The FAC accepted this audit on February 18, 2026. Under 2 CFR 200.521(d), a pass-through entity that provided federal funds to this organization for this audit period must issue a management decision on these findings by August 18, 2026 (15 days ago).

What is a management decision? →

FY 2024-06-30

ADVERSE OPINION, NON-GAAP BASISMATERIAL NONCOMPLIANCE DISCLOSED$44,454,848 federal awards expendedNo findings recorded this year

FAC accepted this audit on March 31, 2025 — management decision was due October 1, 2025.

FY 2023-06-30

ADVERSE OPINION, NON-GAAP BASIS$38,576,472 federal awards expendedNo findings recorded this year

FAC accepted this audit on March 4, 2024 — management decision was due September 4, 2024.

FY 2022-06-30

ADVERSE OPINION, NON-GAAP BASISMATERIAL NONCOMPLIANCE DISCLOSED$18,733,285 federal awards expended

FAC accepted this audit on October 25, 2022 — management decision was due April 25, 2023.

2022-004
Procurement & Suspension/Debarment
MATERIAL WEAKNESSREPEAT OF 2021-008OTHER MATTERS

Prior to January 1, 2022, management did not have a formal bid policy in place for contracts that required formal bids that were consistent with requirements outlined by the Uniform Guidance. Cause and Effect: As a result, Epic lacked the appropriate procedures from July 1, 2021 through December 31, 2021 and did not follow the specified process where an open competition occurred, a price analysis was performed, and there was no bid process was followed. Recommendation: We recommend that management implements the formal procurement policy that meets the requirements outlined by the Uniform Guidance throughout the entirety of the fiscal year. Additionally, we recommend purchase order (PO) approvals are decentralized, allowing for budget owners to be the first line of defense for obtaining the necessary quotes when requesting to contract with a vendor and that these quotes are attached to the PO for final approvals. Management Response: We understand the causes and findings as outlined above. Epic will continue to follow the policy put in place in January 2022, which is consistent with requirements outlined by the Uniformed Guidance.

Show full finding ▾
Full finding narrative

Finding 2022-004 ? Proper procurement for contracts Criteria: From the Uniform Guidance sections 200.31-200.326, there are five general procurement standards that cover the purchase of property, supplies and services under the Uniform Guidance: 1. The organization must maintain written policies and procedures for procurement covering the methods available under these regulations. 2. Costs must be reasonable and necessary 3. Must provide for full and open competition 4. The organization must maintain written standards of conduct covering internal and external conflicts of interest 5. The organization must maintain documentation addressing cost and price analysis and vendor selections where applicable based on the method of procurement used. Condition: Prior to January 1, 2022, management did not have a formal bid policy in place for contracts that required formal bids that were consistent with requirements outlined by the Uniform Guidance. Cause and Effect: As a result, Epic lacked the appropriate procedures from July 1, 2021 through December 31, 2021 and did not follow the specified process where an open competition occurred, a price analysis was performed, and there was no bid process was followed. Recommendation: We recommend that management implements the formal procurement policy that meets the requirements outlined by the Uniform Guidance throughout the entirety of the fiscal year. Additionally, we recommend purchase order (PO) approvals are decentralized, allowing for budget owners to be the first line of defense for obtaining the necessary quotes when requesting to contract with a vendor and that these quotes are attached to the PO for final approvals. Management Response: We understand the causes and findings as outlined above. Epic will continue to follow the policy put in place in January 2022, which is consistent with requirements outlined by the Uniformed Guidance.

Corrective Action Plan

Finding 2022-004 Response and Corrective Action Inconjuction with out FY 22 annual audit, please see the School's corrective action plan below: In order to ensure proper procurement for contracts, a new policy was approved and implemented in January 2022 that meets the requirements outline in Uniform Guidance. Expected completion date: Completed as of 01/2022 Party Responsible: Jeanise Wynn Contact Information: jeanise.wynn@epiccharterschools.org

Prior Finding References

2021-008

About Procurement and Suspension and Debarment →
2022-004
Procurement & Suspension/Debarment
MATERIAL WEAKNESSREPEAT OF 2021-008OTHER MATTERS

Prior to January 1, 2022, management did not have a formal bid policy in place for contracts that required formal bids that were consistent with requirements outlined by the Uniform Guidance. Cause and Effect: As a result, Epic lacked the appropriate procedures from July 1, 2021 through December 31, 2021 and did not follow the specified process where an open competition occurred, a price analysis was performed, and there was no bid process was followed. Recommendation: We recommend that management implements the formal procurement policy that meets the requirements outlined by the Uniform Guidance throughout the entirety of the fiscal year. Additionally, we recommend purchase order (PO) approvals are decentralized, allowing for budget owners to be the first line of defense for obtaining the necessary quotes when requesting to contract with a vendor and that these quotes are attached to the PO for final approvals. Management Response: We understand the causes and findings as outlined above. Epic will continue to follow the policy put in place in January 2022, which is consistent with requirements outlined by the Uniformed Guidance.

Show full finding ▾
Full finding narrative

Finding 2022-004 ? Proper procurement for contracts Criteria: From the Uniform Guidance sections 200.31-200.326, there are five general procurement standards that cover the purchase of property, supplies and services under the Uniform Guidance: 1. The organization must maintain written policies and procedures for procurement covering the methods available under these regulations. 2. Costs must be reasonable and necessary 3. Must provide for full and open competition 4. The organization must maintain written standards of conduct covering internal and external conflicts of interest 5. The organization must maintain documentation addressing cost and price analysis and vendor selections where applicable based on the method of procurement used. Condition: Prior to January 1, 2022, management did not have a formal bid policy in place for contracts that required formal bids that were consistent with requirements outlined by the Uniform Guidance. Cause and Effect: As a result, Epic lacked the appropriate procedures from July 1, 2021 through December 31, 2021 and did not follow the specified process where an open competition occurred, a price analysis was performed, and there was no bid process was followed. Recommendation: We recommend that management implements the formal procurement policy that meets the requirements outlined by the Uniform Guidance throughout the entirety of the fiscal year. Additionally, we recommend purchase order (PO) approvals are decentralized, allowing for budget owners to be the first line of defense for obtaining the necessary quotes when requesting to contract with a vendor and that these quotes are attached to the PO for final approvals. Management Response: We understand the causes and findings as outlined above. Epic will continue to follow the policy put in place in January 2022, which is consistent with requirements outlined by the Uniformed Guidance.

Corrective Action Plan

Finding 2022-004 Response and Corrective Action: In conjunction with our FY22 annual audit, please see the School?s corrective action plan below: In order to ensure proper procurement for contracts, a new policy was approved and implemented in January 2022 that meets the requirements outline in Uniform Guidance. Expected completion date: Completed as of 01/2022 Party Responsible: Jeanise Wynn Contact Information: jeanise.wynn@epiccharterschools.org (405) 749-4550

Prior Finding References

2021-008

About Procurement and Suspension and Debarment →

FY 2022-06-30

ADVERSE OPINION, NON-GAAP BASISMATERIAL NONCOMPLIANCE DISCLOSED$12,849,033 federal awards expended

FAC accepted this audit on October 25, 2022 — management decision was due April 25, 2023.

2022-004
Procurement & Suspension/Debarment
MATERIAL WEAKNESSREPEAT OF 2021-008OTHER MATTERS

Prior to January 1, 2022, management did not have a formal bid policy in place for contracts that required formal bids that were consistent with requirements outlined by the Uniform Guidance. Cause and Effect: As a result, Epic lacked the appropriate procedures from July 1, 2021 through December 31, 2021 and did not follow the specified process where an open competition occurred, a price analysis was performed, and there was no bid process was followed. Recommendation: We recommend that management implements the formal procurement policy that meets the requirements outlined by the Uniform Guidance throughout the entirety of the fiscal year. Additionally, we recommend purchase order (PO) approvals are decentralized, allowing for budget owners to be the first line of defense for obtaining the necessary quotes when requesting to contract with a vendor and that these quotes are attached to the PO for final approvals. Management Response: We understand the causes and findings as outlined above. Epic will continue to follow the policy put in place in January 2022, which is consistent with requirements outlined by the Uniformed Guidance.

Show full finding ▾
Full finding narrative

Finding 2022-004 ? Proper procurement for contracts Criteria: From the Uniform Guidance sections 200.31-200.326, there are five general procurement standards that cover the purchase of property, supplies and services under the Uniform Guidance: 1. The organization must maintain written policies and procedures for procurement covering the methods available under these regulations. 2. Costs must be reasonable and necessary 3. Must provide for full and open competition 4. The organization must maintain written standards of conduct covering internal and external conflicts of interest 5. The organization must maintain documentation addressing cost and price analysis and vendor selections where applicable based on the method of procurement used. Condition: Prior to January 1, 2022, management did not have a formal bid policy in place for contracts that required formal bids that were consistent with requirements outlined by the Uniform Guidance. Cause and Effect: As a result, Epic lacked the appropriate procedures from July 1, 2021 through December 31, 2021 and did not follow the specified process where an open competition occurred, a price analysis was performed, and there was no bid process was followed. Recommendation: We recommend that management implements the formal procurement policy that meets the requirements outlined by the Uniform Guidance throughout the entirety of the fiscal year. Additionally, we recommend purchase order (PO) approvals are decentralized, allowing for budget owners to be the first line of defense for obtaining the necessary quotes when requesting to contract with a vendor and that these quotes are attached to the PO for final approvals. Management Response: We understand the causes and findings as outlined above. Epic will continue to follow the policy put in place in January 2022, which is consistent with requirements outlined by the Uniformed Guidance.

Corrective Action Plan

Finding 2022-004 Response and Corrective Action Inconjuction with out FY 22 annual audit, please see the School's corrective action plan below: In order to ensure proper procurement for contracts, a new policy was approved and implemented in January 2022 that meets the requirements outline in Uniform Guidance. Expected completion date: Completed as of 01/2022 Party Responsible: Jeanise Wynn Contact Information: jeanise.wynn@epiccharterschools.org

Prior Finding References

2021-008

About Procurement and Suspension and Debarment →
2022-004
Procurement & Suspension/Debarment
MATERIAL WEAKNESSREPEAT OF 2021-008OTHER MATTERS

Prior to January 1, 2022, management did not have a formal bid policy in place for contracts that required formal bids that were consistent with requirements outlined by the Uniform Guidance. Cause and Effect: As a result, Epic lacked the appropriate procedures from July 1, 2021 through December 31, 2021 and did not follow the specified process where an open competition occurred, a price analysis was performed, and there was no bid process was followed. Recommendation: We recommend that management implements the formal procurement policy that meets the requirements outlined by the Uniform Guidance throughout the entirety of the fiscal year. Additionally, we recommend purchase order (PO) approvals are decentralized, allowing for budget owners to be the first line of defense for obtaining the necessary quotes when requesting to contract with a vendor and that these quotes are attached to the PO for final approvals. Management Response: We understand the causes and findings as outlined above. Epic will continue to follow the policy put in place in January 2022, which is consistent with requirements outlined by the Uniformed Guidance.

Show full finding ▾
Full finding narrative

Finding 2022-004 ? Proper procurement for contracts Criteria: From the Uniform Guidance sections 200.31-200.326, there are five general procurement standards that cover the purchase of property, supplies and services under the Uniform Guidance: 1. The organization must maintain written policies and procedures for procurement covering the methods available under these regulations. 2. Costs must be reasonable and necessary 3. Must provide for full and open competition 4. The organization must maintain written standards of conduct covering internal and external conflicts of interest 5. The organization must maintain documentation addressing cost and price analysis and vendor selections where applicable based on the method of procurement used. Condition: Prior to January 1, 2022, management did not have a formal bid policy in place for contracts that required formal bids that were consistent with requirements outlined by the Uniform Guidance. Cause and Effect: As a result, Epic lacked the appropriate procedures from July 1, 2021 through December 31, 2021 and did not follow the specified process where an open competition occurred, a price analysis was performed, and there was no bid process was followed. Recommendation: We recommend that management implements the formal procurement policy that meets the requirements outlined by the Uniform Guidance throughout the entirety of the fiscal year. Additionally, we recommend purchase order (PO) approvals are decentralized, allowing for budget owners to be the first line of defense for obtaining the necessary quotes when requesting to contract with a vendor and that these quotes are attached to the PO for final approvals. Management Response: We understand the causes and findings as outlined above. Epic will continue to follow the policy put in place in January 2022, which is consistent with requirements outlined by the Uniformed Guidance.

Corrective Action Plan

Finding 2022-004 Response and Corrective Action: In conjunction with our FY22 annual audit, please see the School?s corrective action plan below: In order to ensure proper procurement for contracts, a new policy was approved and implemented in January 2022 that meets the requirements outline in Uniform Guidance. Expected completion date: Completed as of 01/2022 Party Responsible: Jeanise Wynn Contact Information: jeanise.wynn@epiccharterschools.org (405) 749-4550

Prior Finding References

2021-008

About Procurement and Suspension and Debarment →

FY 2021-06-30

ADVERSE OPINION, NON-GAAP BASISMATERIAL NONCOMPLIANCE DISCLOSED$5,026,926 federal awards expended

FAC accepted this audit on July 10, 2022 — management decision was due January 10, 2023.

2021-008
Procurement & Suspension/Debarment
MATERIAL WEAKNESS

Prior to July 1, 2021, management did not have a formal bid policy in place for contracts that required formal bids that were consistent with requirements outlined by the Uniform Guidance. Cause and Effect: Epic had an expenditure exceeding $25,000 that did not follow the specified process where an open competition occurred, a price analysis was performed, and there was no bid process was followed. Recommendation: We recommend that management establish a formal procurement policy that meets the requirements outlined by the Uniform Guidance. Management Response: We agree with the causes and findings as outlined above. A procurement procedure that meets the requirements outlined by the Uniform Guidance has been in effect since January 2022.

Show full finding ▾
Full finding narrative

Finding 2021-008 ? Proper procurement for contracts Criteria: From the Uniform Guidance sections 200.31-200.326, there are five general procurement standards that cover the purchase of property, supplies and services under the Uniform Guidance: 1. The organization must maintain written policies and procedures for procurement covering the methods available under these regulations. 2. Costs must be reasonable and necessary 3. Must provide for full and open competition 4. The organization must maintain written standards of conduct covering internal and external conflicts of interest 5. The organization must maintain documentation addressing cost and price analysis and vendor selections where applicable based on the method of procurement used. Condition: Prior to July 1, 2021, management did not have a formal bid policy in place for contracts that required formal bids that were consistent with requirements outlined by the Uniform Guidance. Cause and Effect: Epic had an expenditure exceeding $25,000 that did not follow the specified process where an open competition occurred, a price analysis was performed, and there was no bid process was followed. Recommendation: We recommend that management establish a formal procurement policy that meets the requirements outlined by the Uniform Guidance. Management Response: We agree with the causes and findings as outlined above. A procurement procedure that meets the requirements outlined by the Uniform Guidance has been in effect since January 2022.

Corrective Action Plan

Finding 2021-008 Response and Corrective Action In conjunction with our FY21 annual audit, please see the School?s corrective action plan below: In order to ensure proper procurement for contracts, Epic has: ? Approved and implemented a Federal fund procurement procedure that meets the requirements outlined by the Uniform Guidance Expected completion date: Completed on 1/27/2022 Party Responsible: Jeanise Wynn Contact Information: jeanise.wynn@epiccharterschools.org (405) 749-4550

About Procurement and Suspension and Debarment →
2021-008
Procurement & Suspension/Debarment
MATERIAL WEAKNESSMODIFIED OPINION

Prior to July 1, 2021, management did not have a formal bid policy in place for contracts that required formal bids that were consistent with requirements outlined by the Uniform Guidance. Cause and Effect: Epic had an expenditure exceeding $25,000 that did not follow the specified process where an open competition occurred, a price analysis was performed, and there was no bid process was followed. Recommendation: We recommend that management establish a formal procurement policy that meets the requirements outlined by the Uniform Guidance.Management Response: We agree with the causes and findings as outlined above. A procurement procedure that meets the requirements outlined by the Uniform Guidance has been in effect since January 2022.

Show full finding ▾
Full finding narrative

Finding 2021-008 ? Proper procurement for contracts Criteria: From the Uniform Guidance sections 200.31-200.326, there are five general procurement standards that cover the purchase of property, supplies and services under the Uniform Guidance: 1. The organization must maintain written policies and procedures for procurement covering the methods available under these regulations. 2. Costs must be reasonable and necessary 3. Must provide for full and open competition 4. The organization must maintain written standards of conduct covering internal and external conflicts of interest 5. The organization must maintain documentation addressing cost and price analysis and vendor selections where applicable based on the method of procurement used. Condition: Prior to July 1, 2021, management did not have a formal bid policy in place for contracts that required formal bids that were consistent with requirements outlined by the Uniform Guidance. Cause and Effect: Epic had an expenditure exceeding $25,000 that did not follow the specified process where an open competition occurred, a price analysis was performed, and there was no bid process was followed. Recommendation: We recommend that management establish a formal procurement policy that meets the requirements outlined by the Uniform Guidance.Management Response: We agree with the causes and findings as outlined above. A procurement procedure that meets the requirements outlined by the Uniform Guidance has been in effect since January 2022.

Corrective Action Plan

Finding 2021-008 Response and Corrective Action In conjunction with our FY21 annual audit, please see the School?s corrective action plan below: In order to ensure proper procurement for contracts, Epic has: Approved and implemented a Federal fund procurement procedure that meets the requirements outlined by the Uniform Guidance Expected completion date: Completed on 1/27/2022 Party Responsible: Jeanise Wynn Contact Information: jeanise.wynn@epiccharterschools.org (405) 749-4550

About Procurement and Suspension and Debarment →

FY 2021-06-30

ADVERSE OPINION, NON-GAAP BASISMATERIAL NONCOMPLIANCE DISCLOSED$9,649,620 federal awards expended

FAC accepted this audit on July 10, 2022 — management decision was due January 10, 2023.

2021-008
Procurement & Suspension/Debarment
MATERIAL WEAKNESS

Prior to July 1, 2021, management did not have a formal bid policy in place for contracts that required formal bids that were consistent with requirements outlined by the Uniform Guidance. Cause and Effect: Epic had an expenditure exceeding $25,000 that did not follow the specified process where an open competition occurred, a price analysis was performed, and there was no bid process was followed. Recommendation: We recommend that management establish a formal procurement policy that meets the requirements outlined by the Uniform Guidance. Management Response: We agree with the causes and findings as outlined above. A procurement procedure that meets the requirements outlined by the Uniform Guidance has been in effect since January 2022.

Show full finding ▾
Full finding narrative

Finding 2021-008 ? Proper procurement for contracts Criteria: From the Uniform Guidance sections 200.31-200.326, there are five general procurement standards that cover the purchase of property, supplies and services under the Uniform Guidance: 1. The organization must maintain written policies and procedures for procurement covering the methods available under these regulations. 2. Costs must be reasonable and necessary 3. Must provide for full and open competition 4. The organization must maintain written standards of conduct covering internal and external conflicts of interest 5. The organization must maintain documentation addressing cost and price analysis and vendor selections where applicable based on the method of procurement used. Condition: Prior to July 1, 2021, management did not have a formal bid policy in place for contracts that required formal bids that were consistent with requirements outlined by the Uniform Guidance. Cause and Effect: Epic had an expenditure exceeding $25,000 that did not follow the specified process where an open competition occurred, a price analysis was performed, and there was no bid process was followed. Recommendation: We recommend that management establish a formal procurement policy that meets the requirements outlined by the Uniform Guidance. Management Response: We agree with the causes and findings as outlined above. A procurement procedure that meets the requirements outlined by the Uniform Guidance has been in effect since January 2022.

Corrective Action Plan

Finding 2021-008 Response and Corrective Action In conjunction with our FY21 annual audit, please see the School?s corrective action plan below: In order to ensure proper procurement for contracts, Epic has: ? Approved and implemented a Federal fund procurement procedure that meets the requirements outlined by the Uniform Guidance Expected completion date: Completed on 1/27/2022 Party Responsible: Jeanise Wynn Contact Information: jeanise.wynn@epiccharterschools.org (405) 749-4550

About Procurement and Suspension and Debarment →
2021-008
Procurement & Suspension/Debarment
MATERIAL WEAKNESSMODIFIED OPINION

Prior to July 1, 2021, management did not have a formal bid policy in place for contracts that required formal bids that were consistent with requirements outlined by the Uniform Guidance. Cause and Effect: Epic had an expenditure exceeding $25,000 that did not follow the specified process where an open competition occurred, a price analysis was performed, and there was no bid process was followed. Recommendation: We recommend that management establish a formal procurement policy that meets the requirements outlined by the Uniform Guidance.Management Response: We agree with the causes and findings as outlined above. A procurement procedure that meets the requirements outlined by the Uniform Guidance has been in effect since January 2022.

Show full finding ▾
Full finding narrative

Finding 2021-008 ? Proper procurement for contracts Criteria: From the Uniform Guidance sections 200.31-200.326, there are five general procurement standards that cover the purchase of property, supplies and services under the Uniform Guidance: 1. The organization must maintain written policies and procedures for procurement covering the methods available under these regulations. 2. Costs must be reasonable and necessary 3. Must provide for full and open competition 4. The organization must maintain written standards of conduct covering internal and external conflicts of interest 5. The organization must maintain documentation addressing cost and price analysis and vendor selections where applicable based on the method of procurement used. Condition: Prior to July 1, 2021, management did not have a formal bid policy in place for contracts that required formal bids that were consistent with requirements outlined by the Uniform Guidance. Cause and Effect: Epic had an expenditure exceeding $25,000 that did not follow the specified process where an open competition occurred, a price analysis was performed, and there was no bid process was followed. Recommendation: We recommend that management establish a formal procurement policy that meets the requirements outlined by the Uniform Guidance.Management Response: We agree with the causes and findings as outlined above. A procurement procedure that meets the requirements outlined by the Uniform Guidance has been in effect since January 2022.

Corrective Action Plan

Finding 2021-008 Response and Corrective Action In conjunction with our FY21 annual audit, please see the School?s corrective action plan below: In order to ensure proper procurement for contracts, Epic has: Approved and implemented a Federal fund procurement procedure that meets the requirements outlined by the Uniform Guidance Expected completion date: Completed on 1/27/2022 Party Responsible: Jeanise Wynn Contact Information: jeanise.wynn@epiccharterschools.org (405) 749-4550

About Procurement and Suspension and Debarment →

FY 2020-06-30

ADVERSE OPINION, NON-GAAP BASIS$5,913,163 federal awards expendedNo findings recorded this year

FAC accepted this audit on February 8, 2021 — management decision was due August 8, 2021.

FY 2020-06-30

ADVERSE OPINION, NON-GAAP BASIS$3,188,417 federal awards expendedNo findings recorded this year

FAC accepted this audit on February 8, 2021 — management decision was due August 8, 2021.

FY 2019-06-30

ADVERSE OPINION, NON-GAAP BASIS$3,477,647 federal awards expendedNo findings recorded this year

FAC accepted this audit on February 17, 2020 — management decision was due August 17, 2020.

FY 2019-06-30

ADVERSE OPINION, NON-GAAP BASIS$3,102,304 federal awards expendedNo findings recorded this year

FAC accepted this audit on March 19, 2020 — management decision was due September 19, 2020.

FY 2018-06-30

NON-GAAP BASIS$2,291,154 federal awards expendedNo findings recorded this year

FAC accepted this audit on September 13, 2018 — management decision was due March 13, 2019.

FY 2017-06-30

NON-GAAP BASIS$2,140,600 federal awards expendedNo findings recorded this year

FAC accepted this audit on August 21, 2017 — management decision was due February 21, 2018.

FY 2016-06-30

ADVERSE OPINION$1,592,935 federal awards expendedNo findings recorded this year

FAC accepted this audit on August 16, 2016 — management decision was due February 16, 2017.

Data source: This information comes from the Federal Audit Clearinghouse, the official repository of Single Audit data. All data is public domain. Verify this organization's audit history at fac.gov.

Browse other Single Audit organizations in Oklahoma

Are you this organization?

Track your findings and corrective action plans across audit cycles.

Start tracking findings →

Do you fund this organization?

Monitor subrecipient audit findings and filing records.

Start monitoring →

Product

Resources

Legal

Single Audit Intelligence is an independent tool powered by Federal Audit Clearinghouse data. Not affiliated with GSA, OMB, or any federal agency.

© 2026 Single Audit Intelligence. All data is public domain.