← Back to home

TOWN OF WAREHAMLocal Government

EIN: 046001336

UEI: EG8RULJLEKB8

Audited by: CBIZ CPAS P.C.

Oversight agency: 21 [Department of the Treasury]

View federal awards & risk assessment →

Data as of August 28, 2026

TOWN OF WAREHAM9 audit years4 findings
9
Audit Years
4
Total Findings
0
Repeat Findings
$10.3M
Federal Awards Expended (FY 2024)

FY 2024-06-30

$10,312,399 federal awards expendedNo findings recorded this year

Management decision deadline — for entities that funded this organization

The FAC accepted this audit on October 14, 2025. Under 2 CFR 200.521(d), a pass-through entity that provided federal funds to this organization for this audit period must issue a management decision on these findings by April 14, 2026 (139 days ago).

What is a management decision? →

FY 2023-06-30

$6,569,471 federal awards expendedNo findings recorded this year

FAC accepted this audit on March 29, 2024 — management decision was due September 29, 2024.

FY 2022-06-30

LOW-RISK AUDITEE$7,886,142 federal awards expended

FAC accepted this audit on March 30, 2023 — management decision was due September 30, 2023.

2022-001
Cost Allowability
MODIFIED OPINIONSIGNIFICANT DEFICIENCY

Management has not established written guidelines and procedures outlining the time and effort reporting and documentation requirements that department heads must adhere with to ensure compliance with federal and state time and effort reporting requirements. Such guidelines and procedures should indicate under what circumstances semi-annual certifications and personnel activity reports (PARS) are required and should indicate due dates for when this information must be provided to the school business office. Management also has not adopted and implemented standardized forms for semi-annual certifications and PARS that include all data required by federal and state guidelines. Questioned Costs: None reported. Context: Payroll expenditures charged to the programs are required to be supported with documentation substantiating that the employees are eligible to be charged to the grant and that the payroll charged relates to time spent accomplishing grant objectives. This supporting documentation should be standardized and should include all required elements in accordance with Title 2 U.S. Code of Federal Regulations Part 225 Cost Principals for State, Local, and Indian Tribal Governments. The Town did not have an adequate system of internal controls in place to provide sufficient documentation to demonstrate compliance with federal and state time and effort reporting requirements in accordance with the provisions of Title 2 U.S. Code of Federal Regulations Part 225 Cost Principals for State, Local, and Indian Tribal Governments. Effect: The Town has not complied with the federal and state time and effort reporting requirements. Cause: Lack of documented policies, procedures, and guidelines in place to ensure compliance with time and effort reporting requirements. Recommendation: Management should establish written guidelines and procedures outlining the time and effort reporting and documentation requirements that department heads must adhere with to ensure compliance with federal and state time and effort reporting requirements. Such guidelines and procedures should indicate under what circumstances semi-annual certifications and personnel activity reports (PARS) are required and should indicate due dates for when this information must be provided to the school business office. Management should also adopt and implement standardized forms for semi-annual certifications and PARS that include all data required by federal and state guidelines. Once the written guidelines and procedures have been established, training should be provided to ensure that the program managers fully understand the time and effort reporting requirements. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and will establish written guidelines and procedures outlining the time and effort reporting and documentation requirements that department heads must adhere with to ensure compliance with federal and state time and effort reporting requirements. Such guidelines and procedures will indicate under what circumstances semi-annual certifications and personnel activity reports (PARS) are required and will indicate due dates for when this information must be provided to the school business office. Management will also adopt and implement standardized forms for semi-annual certifications and PARS that include all data required by federal and state guidelines. Once the written guidelines and procedures have been established, training will be provided to ensure that the program managers fully understand the time and effort reporting requirements. Management intends to implement these procedures in fiscal 2023.

Show full finding ▾
Full finding narrative

U.S. DEPARTMENT OF EDUCATION Passed through the Massachusetts Department of Elementary and Secondary Education Special Education Cluster Special Education Grants to States ? Federal Assistance Listing Number 84.027 Special Education Preschool Grants ? Federal Assistance Listing Number 84.173 Education Stabilization Fund ? Federal Assistance Listing Numbers 84.425C, 84.425D, and 84.425W 2022-001: Controls for Monitoring Payroll Charged to the Grants Compliance Requirement: Allowable Costs/Cost Principles Type of Finding: Compliance and Significant Deficiency in Internal Control over Compliance Criteria or Specific Requirement: Grantees must provide reasonable assurance that Federal awards are expended only for allowable activities and that the costs of goods and services charged to Federal awards are allowable and in accordance with the applicable cost principles. Condition: Management has not established written guidelines and procedures outlining the time and effort reporting and documentation requirements that department heads must adhere with to ensure compliance with federal and state time and effort reporting requirements. Such guidelines and procedures should indicate under what circumstances semi-annual certifications and personnel activity reports (PARS) are required and should indicate due dates for when this information must be provided to the school business office. Management also has not adopted and implemented standardized forms for semi-annual certifications and PARS that include all data required by federal and state guidelines. Questioned Costs: None reported. Context: Payroll expenditures charged to the programs are required to be supported with documentation substantiating that the employees are eligible to be charged to the grant and that the payroll charged relates to time spent accomplishing grant objectives. This supporting documentation should be standardized and should include all required elements in accordance with Title 2 U.S. Code of Federal Regulations Part 225 Cost Principals for State, Local, and Indian Tribal Governments. The Town did not have an adequate system of internal controls in place to provide sufficient documentation to demonstrate compliance with federal and state time and effort reporting requirements in accordance with the provisions of Title 2 U.S. Code of Federal Regulations Part 225 Cost Principals for State, Local, and Indian Tribal Governments. Effect: The Town has not complied with the federal and state time and effort reporting requirements. Cause: Lack of documented policies, procedures, and guidelines in place to ensure compliance with time and effort reporting requirements. Recommendation: Management should establish written guidelines and procedures outlining the time and effort reporting and documentation requirements that department heads must adhere with to ensure compliance with federal and state time and effort reporting requirements. Such guidelines and procedures should indicate under what circumstances semi-annual certifications and personnel activity reports (PARS) are required and should indicate due dates for when this information must be provided to the school business office. Management should also adopt and implement standardized forms for semi-annual certifications and PARS that include all data required by federal and state guidelines. Once the written guidelines and procedures have been established, training should be provided to ensure that the program managers fully understand the time and effort reporting requirements. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and will establish written guidelines and procedures outlining the time and effort reporting and documentation requirements that department heads must adhere with to ensure compliance with federal and state time and effort reporting requirements. Such guidelines and procedures will indicate under what circumstances semi-annual certifications and personnel activity reports (PARS) are required and will indicate due dates for when this information must be provided to the school business office. Management will also adopt and implement standardized forms for semi-annual certifications and PARS that include all data required by federal and state guidelines. Once the written guidelines and procedures have been established, training will be provided to ensure that the program managers fully understand the time and effort reporting requirements. Management intends to implement these procedures in fiscal 2023.

Corrective Action Plan

CORRECTIVE ACTION PLAN Oversight Agency for Audit: U.S. Department of Education The Town of Wareham, Massachusetts respectfully submits the following corrective action plan for the year ended June 30, 2022. Name and address of independent public accounting firm: Powers & Sullivan, LLC 100 Quannapowitt Parkway, Suite 101 Wakefield, MA 01880 Audit period: July 1, 2021 through June 30, 2022 The finding from the June 30, 2022, schedule of findings and questioned costs is discussed below. The finding is numbered consistently with the number assigned in the schedule. FINDINGS?FEDERAL AWARD PROGRAMS AUDITS U.S. DEPARTMENT OF EDUCATION Passed through the Massachusetts Department of Elementary and Secondary Education Special Education Cluster Special Education Grants to States and Special Education Preschool Grants Federal Assistance Listing Numbers 84.027 and 84.173 Education Stabilization Fund Education Stabilization Fund Federal Assistance Listing Numbers 84.425C, 84.425D, and 84.425W 2022-001: Controls for Monitoring Payroll Charged to the Grants Compliance Requirement: Allowable Costs/Cost Principles Type of Finding: Compliance and Significant Deficiency in Internal Control over Compliance Criteria or Specific Requirement: Grantees must provide reasonable assurance that Federal awards are expended only for allowable activities and that the costs of goods and services charged to Federal awards are allowable and in accordance with the applicable cost principles. Condition: Management has not established written guidelines and procedures outlining the time and effort reporting and documentation requirements that department heads must adhere with to ensure compliance with federal and state time and effort reporting requirements. Such guidelines and procedures should indicate under what circumstances semi-annual certifications and personnel activity reports (PARS) are required and should indicate due dates for when this information must be provided to the school business office. Management also has not adopted and implemented standardized forms for semi-annual certifications and PARS that include all data required by federal and state guidelines. Questioned Costs: None reported. Context: Payroll expenditures charged to the programs are required to be supported with documentation substantiating that the employees are eligible to be charged to the grant and that the payroll charged relates to time spent accomplishing grant objectives. This supporting documentation should be standardized and should include all required elements in accordance with Title 2 U.S. Code of Federal Regulations Part 225 Cost Principals for State, Local, and Indian Tribal Governments. The Town did not have an adequate system of internal controls in place to provide sufficient documentation to demonstrate compliance with federal and state time and effort reporting requirements in accordance with the provisions of Title 2 U.S. Code of Federal Regulations Part 225 Cost Principals for State, Local, and Indian Tribal Governments. Effect: The Town has not complied with the federal and state time and effort reporting requirements. Cause: Lack of documented policies, procedures and guidelines in place to ensure compliance with time and effort reporting requirements. Recommendation: Management should establish written guidelines and procedures outlining the time and effort reporting and documentation requirements that department heads must adhere with to ensure compliance with federal and state time and effort reporting requirements. Such guidelines and procedures should indicate under what circumstances semi-annual certifications and personnel activity reports (PARS) are required and should indicate due dates for when this information must be provided to the school business office. Management should also adopt and implement standardized forms for semi-annual certifications and PARS that include all data required by federal and state guidelines. Once the written guidelines and procedures have been established, training should be provided to ensure that the program managers fully understand the time and effort reporting requirements. Views of Responsible Officials and Planned Corrective Actions: Management agrees with the finding and will establish written guidelines and procedures outlining the time and effort reporting and documentation requirements that department heads must adhere with to ensure compliance with federal and state time and effort reporting requirements. Such guidelines and procedures will indicate under what circumstances semi-annual certifications and personnel activity reports (PARS) are required and will indicate due dates for when this information must be provided to the school business office. Management will also adopt and implement standardized forms for semi-annual certifications and PARS that include all data required by federal and state guidelines. Once the written guidelines and procedures have been established, training will be provided to ensure that the program managers fully understand the time and effort reporting requirements. Management intends to implement these procedures in fiscal 2023. If the Oversight Agency has questions regarding this plan, please call Kristin Flynn, Director of Finance at Wareham Public Schools at 508-291-3500, or Derek Sullivan, Town Administrator at 508-291-3100. Sincerely yours, Kristin Flynn Director of Finance Wareham Public Schools Derek Sullivan Town Administrator Town of Wareham

About Allowable Costs / Cost Principles →
2022-002
Equipment & Real Property
OTHER MATTERS

The Town did not have an adequate process to ensure that personnel responsible for grant compliance were aware of the need to obtain prior approval from the pass-through entity for capital expenditures related to the acquisition of general or special purpose equipment. As a result of our audit procedures, we noted the acquisition of two HVAC chillers that were charged to the grant where prior approval was not obtained from the pass-through entity. Questioned Costs: The Town expended a total of $2.1 million in Education Stabilization Funds in 2022, of which $457,000 was charged to supplies, materials and contracted services accounts. Of the total charged to supplies, materials and contracted services, $334,000 was selected for testing and $144,000 was spent on the purchase of two HVAC chillers without prior approval from the pass-through entity. Context: The Town used grant funds to purchase capital equipment without prior approval from the pass-through entity as required by federal and state guidelines. Effect: The Town is not in compliance with grant requirements for the acquisition of capital equipment. Cause: Lack of appropriate controls over charging expenditures to the grant, maintaining documentation for costs charged, and lack of knowledge over grant compliance requirements. The internal control process should include the education of personnel on grant compliance requirements and procedures to ensure that grant activity is spent in accordance with federal and state requirements. Recommendation: Management should implement internal controls to ensure that administrators are aware of all grant compliance requirements including the need to obtain prior written approval from the pass-through entity for capital expenditures paid from the Education Stabilization Fund grants. Views of Responsible Officials and Planned Corrective Actions: Management will implement internal controls to ensure that administrators are aware of all grant compliance requirements including the need to obtain prior written approval from the pass-through entity for capital expenditures paid from the Education Stabilization Fund grants. Management plans to implement these procedures in fiscal 2023.

Show full finding ▾
Full finding narrative

U.S. DEPARTMENT OF EDUCATION Passed through the Massachusetts Department of Elementary and Secondary Education Education Stabilization Fund ? Federal Assistance Listing Numbers 84.425C, 84.425D, and 84.425W 2022-002: Controls for the Purchasing of Capital Equipment Compliance Requirement: Equipment/Real Property Management Type of Finding: Compliance and Internal Control over Compliance ? Other Matter Criteria or Specific Requirement: Grantees must obtain prior approval from the pass-through entity for capital expenditures related to general and special purpose equipment purchases. Condition: The Town did not have an adequate process to ensure that personnel responsible for grant compliance were aware of the need to obtain prior approval from the pass-through entity for capital expenditures related to the acquisition of general or special purpose equipment. As a result of our audit procedures, we noted the acquisition of two HVAC chillers that were charged to the grant where prior approval was not obtained from the pass-through entity. Questioned Costs: The Town expended a total of $2.1 million in Education Stabilization Funds in 2022, of which $457,000 was charged to supplies, materials and contracted services accounts. Of the total charged to supplies, materials and contracted services, $334,000 was selected for testing and $144,000 was spent on the purchase of two HVAC chillers without prior approval from the pass-through entity. Context: The Town used grant funds to purchase capital equipment without prior approval from the pass-through entity as required by federal and state guidelines. Effect: The Town is not in compliance with grant requirements for the acquisition of capital equipment. Cause: Lack of appropriate controls over charging expenditures to the grant, maintaining documentation for costs charged, and lack of knowledge over grant compliance requirements. The internal control process should include the education of personnel on grant compliance requirements and procedures to ensure that grant activity is spent in accordance with federal and state requirements. Recommendation: Management should implement internal controls to ensure that administrators are aware of all grant compliance requirements including the need to obtain prior written approval from the pass-through entity for capital expenditures paid from the Education Stabilization Fund grants. Views of Responsible Officials and Planned Corrective Actions: Management will implement internal controls to ensure that administrators are aware of all grant compliance requirements including the need to obtain prior written approval from the pass-through entity for capital expenditures paid from the Education Stabilization Fund grants. Management plans to implement these procedures in fiscal 2023.

Corrective Action Plan

CORRECTIVE ACTION PLAN Oversight Agency for Audit: U.S. Department of Education The Town of Wareham, Massachusetts respectfully submits the following corrective action plan for the year ended June 30, 2022. Name and address of independent public accounting firm: Powers & Sullivan, LLC 100 Quannapowitt Parkway, Suite 101 Wakefield, MA 01880 Audit period: July 1, 2021 through June 30, 2022 The finding from the June 30, 2022, schedule of findings and questioned costs is discussed below. The finding is numbered consistently with the number assigned in the schedule. FINDINGS?FEDERAL AWARD PROGRAMS AUDITS U.S. DEPARTMENT OF EDUCATION Passed through the Massachusetts Department of Elementary and Secondary Education Education Stabilization Fund Education Stabilization Fund Federal Assistance Listing Numbers 84.425C, 84.425D, and 84.425W 2022-002: Controls for the Purchasing of Capital Equipment Compliance Requirement: Equipment/Real Property Management Type of Finding: Compliance and Internal Control over Compliance ? Other Matter Criteria or Specific Requirement: Grantees must obtain prior approval from the pass-through entity for capital expenditures related to general and special purpose equipment purchases. Condition: The Town did not have an adequate process to ensure that personnel responsible for grant compliance were aware of the need to obtain prior approval from the pass-through entity for capital expenditures related to the acquisition of general or special purpose equipment. As a result of our audit procedures, we noted the acquisition of two HVAC chillers that were charged to the grant where prior approval was not obtained from the pass-through entity. Questioned Costs: The Town expended a total of $2.1 million in Education Stabilization Funds in 2022, of which $457,000 was charged to supplies, materials and contracted services accounts. Of the total charged to supplies, materials and contracted services accounts, $334,000 was selected for testing and $144,000 was spent on the purchase of two HVAC chillers without prior approval from the pass-through entity. Context: The Town used grant funds to purchase capital equipment without prior approval from the pass-through entity as required by federal and state guidelines. Effect: The Town is not in compliance with grant requirements for the acquisition of capital equipment. Cause: Lack of appropriate controls over charging expenditures to the grant, maintaining documentation for costs charged, and lack of knowledge over grant compliance requirements. The internal control process should include the education of personnel on grant compliance requirements and procedures to ensure that grant activity is spent in accordance with federal and state requirements. Recommendation: Management should implement internal controls to ensure that administrators are aware of all grant compliance requirements including the need to obtain prior written approval from the pass-through entity for capital expenditures paid from the Education Stabilization Fund grants. Views of Responsible Officials and Planned Corrective Actions: Management will implement internal controls to ensure that administrators are aware of all grant compliance requirements including the need to obtain prior written approval from the pass-through entity for capital expenditures paid from the Education Stabilization Fund grants. Management plans to implement these procedures in fiscal 2023. If the Oversight Agency has questions regarding this plan, please call Kristin Flynn, Director of Finance at Wareham Public Schools at 508-291-3500 or Derek Sullivan, Town Administrator at 508-291-3100. Sincerely yours, Kristin Flynn Director of Finance Wareham Public Schools Derek Sullivan Town Administrator Town of Wareham

About Equipment and Real Property Management →

FY 2021-06-30

LOW-RISK AUDITEE$6,347,938 federal awards expendedNo findings recorded this year

FAC accepted this audit on February 15, 2022 — management decision was due August 15, 2022.

FY 2020-06-30

LOW-RISK AUDITEE$4,794,989 federal awards expendedNo findings recorded this year

FAC accepted this audit on March 22, 2021 — management decision was due September 22, 2021.

FY 2019-06-30

LOW-RISK AUDITEE$4,277,821 federal awards expendedNo findings recorded this year

FAC accepted this audit on March 2, 2020 — management decision was due September 2, 2020.

FY 2018-06-30

LOW-RISK AUDITEE$3,884,515 federal awards expendedNo findings recorded this year

FAC accepted this audit on March 21, 2019 — management decision was due September 21, 2019.

FY 2017-06-30

LOW-RISK AUDITEE$4,281,196 federal awards expendedNo findings recorded this year

FAC accepted this audit on March 26, 2018 — management decision was due September 26, 2018.

FY 2016-06-30

$3,664,794 federal awards expended

FAC accepted this audit on March 20, 2017 — management decision was due September 20, 2017.

2016-001
Reporting
OTHER MATTERS

GSA_MIGRATION

Show full finding ▾
Full finding narrative

GSA_MIGRATION

Corrective Action Plan

GSA_MIGRATION

About Reporting →
2016-002
Cost Allowability
OTHER MATTERS

GSA_MIGRATION

Show full finding ▾
Full finding narrative

GSA_MIGRATION

Corrective Action Plan

GSA_MIGRATION

About Allowable Costs / Cost Principles →

Data source: This information comes from the Federal Audit Clearinghouse, the official repository of Single Audit data. All data is public domain. Verify this organization's audit history at fac.gov.

Browse other Single Audit organizations in Massachusetts

Are you this organization?

Track your findings and corrective action plans across audit cycles.

Start tracking findings →

Do you fund this organization?

Monitor subrecipient audit findings and filing records.

Start monitoring →

Product

Resources

Legal

Single Audit Intelligence is an independent tool powered by Federal Audit Clearinghouse data. Not affiliated with GSA, OMB, or any federal agency.

© 2026 Single Audit Intelligence. All data is public domain.