Woodland, Port of

EIN: 910830178

UEI: JZR9ZRJWYBN1

Data as of August 22, 2026

Woodland, Port of3 audit years2 findings
3
Audit Years
2
Total Findings
0
Repeat Findings

FY 2024-12-31

Management decision deadline — for entities that funded this organization

The FAC accepted this audit on December 19, 2025. Under 2 CFR 200.521(d), a pass-through entity that provided federal funds to this organization for this audit period must issue a management decision on these findings by June 19, 2026 (64 days ago).

What is a management decision? →
2024-001
Procurement & Suspension/Debarment
MATERIAL WEAKNESS

SCHEDULE OF FEDERAL AWARD FINDINGS AND QUESTIONED COSTS Port of Woodland January 1, 2024 through December 31, 2024 2024-001 The Port did not have adequate internal controls and did not comply with federal procurement and suspension and debarment requirements. Assistance Listing Number and Title: COVID 19 - 21.029 – Coronavirus Capital Projects Fund Federal Grantor Name: U.S. Department of Treasury Federal Award/Contract Number: N/A Pass-through Entity Name: Washington State Department of Commerce Pass-through Award/Contract Number: S21-96401-023 Known Questioned Cost Amount: $0 Prior Year Audit Finding: N/A Background The purpose of the COVID-19 Coronavirus Capital Projects Fund is to fund multi-purpose community centers and broadband-related infrastructure projects designed to deliver reliable internet service that meets or exceeds 100/100 Mbps symmetrical speeds. In 2024, the Port expended $1,327,754 related to broadband-related infrastructure. Federal regulations require recipients to establish, document and maintain effective internal controls that ensure compliance with program requirements. These controls include understanding program requirements and monitoring the effectiveness of established controls. Suspension and Debarment Federal requirements prohibit grant recipients from contracting with or purchasing from parties suspended or debarred from doing business with the federal government. Whenever the Port enters into contracts or purchases goods or services that it expects to equal or exceed $25,000, paid all or in part with federal funds, it must verify that the contractors are not suspended, debarred or otherwise excluded from participating in federal programs. The Port may verify this by obtaining a written certification from the contractor, adding a clause or condition into the contract that states the contractor is not suspended or debarred, or checking for exclusion records in the U.S. General Services Administration’s System for Award Management at SAM.gov. The Port must perform this verification before entering into the contract, and it must maintain documentation demonstrating compliance with this federal requirement. Procurement Federal regulations require recipients to follow their own documented procurement procedures, which must conform to the Uniform Guidance procurement standards found in 2 CFR § 200.318-327. These procedures must reflect the most restrictive of applicable federal, state or local thresholds and methods. When using federal funds to procure goods and services, governments must apply the more restrictive requirements of federal, state or local laws by obtaining quotes or following a competitive procurement process, depending on the estimated cost of the procurement activity. The Port must maintain documentation showing the procurement process it performed. Additionally, federal regulations require recipients to maintain written standards of conduct that cover conflicts of interest and govern the actions of employees and officers involved in selecting, awarding and administering contracts procured with federal funds. Finally, federal regulations require nonfederal entities to incorporate the Build America, Buy America Act (BABAA) preference requirements in all applicable contracts and purchase orders for work performed or products supplied under a federal award with an infrastructure project. Nonfederal entities can meet this requirement by including the BABAA domestic preference provisions in the agreement or obtaining a BABAA waiver. Description of Condition Suspension and Debarment Although the Port has a process to verify the suspension and debarment status for contractors it pays more than $25,000, our audit found the Port did not follow this process and did not verify all five contractors were not suspended or debarred before purchasing from them. Procurement Our audit found the Port’s internal controls were ineffective for ensuring it complied with federal procurement requirements. Although the Port has an established procurement policy, it does not conform with federal requirements. Specifically, it does not include methods and thresholds for purchases, the correct thresholds for public works projects, and requirements included in 2 CFR § 200.321-327. Further, the Port does not have a standards of conduct policy covering conflicts of interest for employees or agents who award contracts, as federal regulations require. Additionally, the Port did not have a process to ensure it followed the most restrictive of federal, state or local procurement requirements when procuring a professional service firm for about $19,750. Finally, the Port did not have a process in place to ensure it included the BABAA preference requirements in all applicable contracts for work performed or products supplied to the infrastructure project. We consider these deficiencies in internal controls to be material weaknesses that led to material noncompliance. Cause of Condition Since the District does not regularly manage federal funds, staff were unaware of the applicable federal requirements. In addition, the project was funded by multiple sources that each had their own requirements, which further added to the complexity of ensuring compliance. Effect of Condition Suspension and Debarment The Port did not obtain written certification from the contractors, insert a clause into the contract or retain evidence that it checked for exclusion records at SAM.gov to verify contractors it paid $1,226,616 using federal funds were not suspended or debarred before contracting. Without adequate internal controls, the Port increases its risk of awarding federal funds to contractors that are excluded from participating in federal programs. Any payments the Port made to an ineligible party would be unallowable, and the federal agency could potentially recover them. We subsequently verified the contractors were not suspended or debarred. Therefore, we are not questioning costs. Procurement Without written policies and procedures that conform to federal procurement standards, the Port increases its risk of not complying with standards of conduct requirements when using federal funds. Additionally, without effective internal controls, the Port cannot demonstrate it complied with federal procurement standards, allowed for full and open competition, received the best price or selected the most qualified contractor, and that federal funds were spent on American products. Recommendation Suspension and Debarment We recommend the Port strengthen its internal controls to verify all contractors it pays $25,000 or more, all or in part with federal funds, are not suspended or debarred from participating in federal programs and maintain documentation demonstrating compliance with this requirement. Procurement We recommend the Port update and maintain internal controls to comply with federal procurement requirements, including establishing written procurements and standards of conduct procedures that conform to federal procurement standards in Uniform Guidance (2 CFR 200.318-327). We also recommend the Port establish internal controls to ensure that contracts include the BABAA under a federal award with an infrastructure project, include the BABAA domestic preference provisions in the agreement, or obtain a BABAA waiver. Port’s Response The Port of Woodland thanks the Washington State Auditor’s Office (SAO) for a thorough review of our financial statements and compliance with federal procurement requirements related to the port’s capital infrastructure program. The Port respects the findings of SAO and will implement the recommendations, including improving adequate internal controls related to procurement policies, implementing processes where necessary, and training staff designed to comply with Title 2 U.S Code of Federal Regulations (CFR) Part 180, Part 184, Part 200, and other guidance accepted as best practice for compliance audits. Concerning SAO’s findings related to 2 CFR Part 180, verification of suspension and debarment status of contractors, the Port can state with confidence that none of the contractors were suspended or debarred from participating in federal programs for the duration of their contract with the Port. The Port concurs that it was unable to produce a time-stamped verification that these checks occurred before contract award. The Port will implement new procedures that conform to the Port’s existing policy to verify suspension and debarment status of all applicable contractors in the future. This includes performing verification, modifying future contract language, and retaining evidence of verification. Regarding SAO’s recommendations, designed to ensure the Port complies with federal procurement requirements, the Port intends to review 2 CFR Parts 184 and 200 and modify existing policies and procedures to conform with federal procurement standards. The Port is currently restructuring staffing and work functions, which will provide staff with greater clarity on their specific roles and responsibilities. This will also allow the Port to ensure staff have sufficient training to carry out those responsibilities in accordance with the updated internal controls, including compliance with the Build America, Buy America Act. Auditor’s Remarks We thank the Port for its cooperation throughout the audit and the steps it is taking to address these concerns. We will review the status of the Port’s corrective action during our next audit. Applicable Laws and Regulations Title 2 U.S. Code of Federal Regulations (CFR) Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance), section 516, Audit findings, establishes reporting requirements for audit findings. Title 2 CFR Part 200, Uniform Guidance, section 303, Internal controls, describes the requirements for auditees to maintain internal controls over federal programs and comply with federal program requirements. The American Institute of Certified Public Accountants defines significant deficiencies and material weaknesses in its Codification of Statements on Auditing Standards, section 935, Compliance Audits, paragraph 11. Title 2 CFR Part 180, OMB Guidelines to Agencies on Governmentwide Debarment and Suspension (Nonprocurement), establishes nonprocurement debarment and suspension regulations implementing Executive Orders 12549 and 12689. Title 2 CFR Part 200, Uniform Guidance, section 318, General procurement standards, establishes requirements for written procedures. Title 2 CFR Part 200, Uniform Guidance, section 320, Methods of procurement to be followed, establishes requirements for procuring goods and services, including noncompetitive procurement. Title 2 CFR Part 184, Buy America Preferences for Infrastructure Projects, describes the requirements to purchase iron, steel, manufactured products, and construction materials incorporated into an applicable infrastructure project produced in the United States.

Show full finding ▾
Full finding narrative

SCHEDULE OF FEDERAL AWARD FINDINGS AND QUESTIONED COSTS Port of Woodland January 1, 2024 through December 31, 2024 2024-001 The Port did not have adequate internal controls and did not comply with federal procurement and suspension and debarment requirements. Assistance Listing Number and Title: COVID 19 - 21.029 – Coronavirus Capital Projects Fund Federal Grantor Name: U.S. Department of Treasury Federal Award/Contract Number: N/A Pass-through Entity Name: Washington State Department of Commerce Pass-through Award/Contract Number: S21-96401-023 Known Questioned Cost Amount: $0 Prior Year Audit Finding: N/A Background The purpose of the COVID-19 Coronavirus Capital Projects Fund is to fund multi-purpose community centers and broadband-related infrastructure projects designed to deliver reliable internet service that meets or exceeds 100/100 Mbps symmetrical speeds. In 2024, the Port expended $1,327,754 related to broadband-related infrastructure. Federal regulations require recipients to establish, document and maintain effective internal controls that ensure compliance with program requirements. These controls include understanding program requirements and monitoring the effectiveness of established controls. Suspension and Debarment Federal requirements prohibit grant recipients from contracting with or purchasing from parties suspended or debarred from doing business with the federal government. Whenever the Port enters into contracts or purchases goods or services that it expects to equal or exceed $25,000, paid all or in part with federal funds, it must verify that the contractors are not suspended, debarred or otherwise excluded from participating in federal programs. The Port may verify this by obtaining a written certification from the contractor, adding a clause or condition into the contract that states the contractor is not suspended or debarred, or checking for exclusion records in the U.S. General Services Administration’s System for Award Management at SAM.gov. The Port must perform this verification before entering into the contract, and it must maintain documentation demonstrating compliance with this federal requirement. Procurement Federal regulations require recipients to follow their own documented procurement procedures, which must conform to the Uniform Guidance procurement standards found in 2 CFR § 200.318-327. These procedures must reflect the most restrictive of applicable federal, state or local thresholds and methods. When using federal funds to procure goods and services, governments must apply the more restrictive requirements of federal, state or local laws by obtaining quotes or following a competitive procurement process, depending on the estimated cost of the procurement activity. The Port must maintain documentation showing the procurement process it performed. Additionally, federal regulations require recipients to maintain written standards of conduct that cover conflicts of interest and govern the actions of employees and officers involved in selecting, awarding and administering contracts procured with federal funds. Finally, federal regulations require nonfederal entities to incorporate the Build America, Buy America Act (BABAA) preference requirements in all applicable contracts and purchase orders for work performed or products supplied under a federal award with an infrastructure project. Nonfederal entities can meet this requirement by including the BABAA domestic preference provisions in the agreement or obtaining a BABAA waiver. Description of Condition Suspension and Debarment Although the Port has a process to verify the suspension and debarment status for contractors it pays more than $25,000, our audit found the Port did not follow this process and did not verify all five contractors were not suspended or debarred before purchasing from them. Procurement Our audit found the Port’s internal controls were ineffective for ensuring it complied with federal procurement requirements. Although the Port has an established procurement policy, it does not conform with federal requirements. Specifically, it does not include methods and thresholds for purchases, the correct thresholds for public works projects, and requirements included in 2 CFR § 200.321-327. Further, the Port does not have a standards of conduct policy covering conflicts of interest for employees or agents who award contracts, as federal regulations require. Additionally, the Port did not have a process to ensure it followed the most restrictive of federal, state or local procurement requirements when procuring a professional service firm for about $19,750. Finally, the Port did not have a process in place to ensure it included the BABAA preference requirements in all applicable contracts for work performed or products supplied to the infrastructure project. We consider these deficiencies in internal controls to be material weaknesses that led to material noncompliance. Cause of Condition Since the District does not regularly manage federal funds, staff were unaware of the applicable federal requirements. In addition, the project was funded by multiple sources that each had their own requirements, which further added to the complexity of ensuring compliance. Effect of Condition Suspension and Debarment The Port did not obtain written certification from the contractors, insert a clause into the contract or retain evidence that it checked for exclusion records at SAM.gov to verify contractors it paid $1,226,616 using federal funds were not suspended or debarred before contracting. Without adequate internal controls, the Port increases its risk of awarding federal funds to contractors that are excluded from participating in federal programs. Any payments the Port made to an ineligible party would be unallowable, and the federal agency could potentially recover them. We subsequently verified the contractors were not suspended or debarred. Therefore, we are not questioning costs. Procurement Without written policies and procedures that conform to federal procurement standards, the Port increases its risk of not complying with standards of conduct requirements when using federal funds. Additionally, without effective internal controls, the Port cannot demonstrate it complied with federal procurement standards, allowed for full and open competition, received the best price or selected the most qualified contractor, and that federal funds were spent on American products. Recommendation Suspension and Debarment We recommend the Port strengthen its internal controls to verify all contractors it pays $25,000 or more, all or in part with federal funds, are not suspended or debarred from participating in federal programs and maintain documentation demonstrating compliance with this requirement. Procurement We recommend the Port update and maintain internal controls to comply with federal procurement requirements, including establishing written procurements and standards of conduct procedures that conform to federal procurement standards in Uniform Guidance (2 CFR 200.318-327). We also recommend the Port establish internal controls to ensure that contracts include the BABAA under a federal award with an infrastructure project, include the BABAA domestic preference provisions in the agreement, or obtain a BABAA waiver. Port’s Response The Port of Woodland thanks the Washington State Auditor’s Office (SAO) for a thorough review of our financial statements and compliance with federal procurement requirements related to the port’s capital infrastructure program. The Port respects the findings of SAO and will implement the recommendations, including improving adequate internal controls related to procurement policies, implementing processes where necessary, and training staff designed to comply with Title 2 U.S Code of Federal Regulations (CFR) Part 180, Part 184, Part 200, and other guidance accepted as best practice for compliance audits. Concerning SAO’s findings related to 2 CFR Part 180, verification of suspension and debarment status of contractors, the Port can state with confidence that none of the contractors were suspended or debarred from participating in federal programs for the duration of their contract with the Port. The Port concurs that it was unable to produce a time-stamped verification that these checks occurred before contract award. The Port will implement new procedures that conform to the Port’s existing policy to verify suspension and debarment status of all applicable contractors in the future. This includes performing verification, modifying future contract language, and retaining evidence of verification. Regarding SAO’s recommendations, designed to ensure the Port complies with federal procurement requirements, the Port intends to review 2 CFR Parts 184 and 200 and modify existing policies and procedures to conform with federal procurement standards. The Port is currently restructuring staffing and work functions, which will provide staff with greater clarity on their specific roles and responsibilities. This will also allow the Port to ensure staff have sufficient training to carry out those responsibilities in accordance with the updated internal controls, including compliance with the Build America, Buy America Act. Auditor’s Remarks We thank the Port for its cooperation throughout the audit and the steps it is taking to address these concerns. We will review the status of the Port’s corrective action during our next audit. Applicable Laws and Regulations Title 2 U.S. Code of Federal Regulations (CFR) Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance), section 516, Audit findings, establishes reporting requirements for audit findings. Title 2 CFR Part 200, Uniform Guidance, section 303, Internal controls, describes the requirements for auditees to maintain internal controls over federal programs and comply with federal program requirements. The American Institute of Certified Public Accountants defines significant deficiencies and material weaknesses in its Codification of Statements on Auditing Standards, section 935, Compliance Audits, paragraph 11. Title 2 CFR Part 180, OMB Guidelines to Agencies on Governmentwide Debarment and Suspension (Nonprocurement), establishes nonprocurement debarment and suspension regulations implementing Executive Orders 12549 and 12689. Title 2 CFR Part 200, Uniform Guidance, section 318, General procurement standards, establishes requirements for written procedures. Title 2 CFR Part 200, Uniform Guidance, section 320, Methods of procurement to be followed, establishes requirements for procuring goods and services, including noncompetitive procurement. Title 2 CFR Part 184, Buy America Preferences for Infrastructure Projects, describes the requirements to purchase iron, steel, manufactured products, and construction materials incorporated into an applicable infrastructure project produced in the United States.

Corrective Action Plan

CORRECTIVE ACTION PLAN FOR FINDINGS REPORTED UNDER UNIFORM GUIDANCE Port of Woodland January 1, 2024, through December 31, 2024 This schedule presents the corrective action the district plans to take for the findings included in this report, in accordance with Title 2 of the U.S. Code of Federal Regulations (CFR) Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance). Finding ref number: 2024-001 Finding caption: The Port did not have adequate internal controls and did not comply with federal procurement and suspension and debarment requirements. Name, address, and telephone of District contact person: Debbie Karlsson, Interim Deputy Director/Finance Administrator 1608 Guild Road Woodland, WA 98674 (360) 225-6555 Corrective action the auditee plans to take in response to the finding: (If the auditee does not concur with the finding, the auditee must list the reasons for disagreement.) The Port will implement new procedures that conform to the Port’s existing policy to verify suspension-and-debarment status of all applicable contractors in the future. This includes performing verification, modifying future contract language, and retaining evidence of verification. The Port is currently restructuring staffing and work functions, which will provide more clarity to staff on their specific roles and responsibilities. This will also allow the Port to make sure staff have sufficient training to carry out those responsibilities in accordance with the updated internal controls, including compliance with the Build America, Buy America Act. Anticipated date to complete the corrective action: March 31, 2026

About Procurement and Suspension and Debarment →

FY 2021-12-31

FAC accepted this audit on September 14, 2022 — management decision was due March 14, 2023.

2021-001
Reporting / Special Tests & Provisions
MATERIAL WEAKNESS

SCHEDULE OF FEDERAL AWARD FINDINGS ANDQUESTIONED COSTSPort of WoodlandJanuary 1, 2021 through December 31, 20212021-001 The Port did not have adequate controls for ensuring compliance with Davis-Bacon Act (prevailing wage rate) and reporting requirements.CFDA Number and Title: 11.300 ? Investments for Public Works and Economic Development FacilitiesFederal Grantor Name: U.S. economic Development AdministrationFederal Award/Contract Number: 07-01-07554Pass-through Entity Name: Washington State Department of CommercePass-through Award/Contract Number:N/AQuestioned Cost Amount: $0.00BackgroundThe U.S. Economic Development Administration (EDA) provides program assistance through the Public Works program. This program provides resources to meet the construction, design, engineering, and acquisition of related property, machinery and equipment to facilitate economic and infrastructure development. In fiscal year 2021, the Port had federal expenditures of $2,067,400 for the construction of the Rose Way Industrial Park project.Federal regulations require award recipients to establish and implement internal controls that ensure compliance with program requirements. These controls include understanding grant requirements and monitoring the effectiveness of established controls.Description of ConditionWage Rate Requirements (Davis-Bacon Act)The Davis-Bacon Act requires contractors and subcontractors that work on construction contracts in excess of $2,000 financed with federal financial assistance to pay laborers and mechanics prevailing wages?the wage rates the U.S. Department of Labor considers being similar to what local workers have been paid for similar projects. Prevailing wage rate requirements specify that the contract between the Port and the prime contractor includes specific language to ensure contractors and subcontractors are paid at prevailing wage rates. Additionally, the District is required to collect certified payroll reports from contractors and subcontractors, which include copies of their payroll and signed ?Statement of Compliance.?The Port hired one contractor for the Rose Way Industrial Park project. During the fiscal year, the Port used about $1.8 million of federal program funds to pay the contractor on this project. Our audit found the Port did not have adequate internal controls for ensuring compliance with the prevailing wage rate requirements. Specifically, the Port did not ensure the contract with its contractor included the required wage rate clause.Financial ReportingTo comply with federal reporting requirements, the Port must submit financial and performance reports to the EDA. For financial reporting requirements, the Port was required to submit the Federal Financial Report standard form, SF-425, on a semiannual basis. The form was due no later than one month following the end of the semiannual period.Our audit found the Port did not submit these required reports to the EDA.We consider these internal control deficiencies to be material weaknesses, which led to material noncompliance.This issue was not reported as a finding in the prior audit.Cause of ConditionThis is the Port?s first federal program. Employees responsible for ensuring compliance with Davis-Bacon Act and financial reporting requirements had limited experience managing grants, and they did not adequately research all applicable compliance requirements.Effect of ConditionWithout adequate internal controls ensuring it included the required Davis-Bacon clause in its contract, the Port cannot demonstrate it complied with Davis-Bacon Act requirements. The Port could be liable for paying any additional wages if the contractor did not pay prevailing wage rates to laborers working on the contract.Additionally, because the Port did not file the required semiannual SF-425 financial reports in accordance with federal program requirements, the grantor could not assess the Port?s program funding.RecommendationWe recommend that the Port establish and implement internal controls to ensure it complies with federal program requirements. Specifically, we recommend the Port insert the prevailing wage clause into contracts and ensure it completes and submits all required reports to the granting agency timely.Port?s ResponseThe Port of Woodland has reviewed the findings that were identified by the SAO. The Port states no fiscal or inappropriate use of funds occurred and that the findings are a result of ongoing issues with communication between the U.S. Department of Commerce Economic Development Administration and the Port. The EDA staff has had significant staff changes and in the time of the Port?s Rose Way Industrial Park project, has had eight different EDA project managers resulting in a lack of continuity of communication, follow up, assurances and timeliness of documents. The Port addressed these issues numerous times, even convening congressional staff members for further assistance. In one instance, EDA staff had stated verbally to Port staff to not submit any documents because of pending amendments to the original contract. This resulted in two documents not being turned in to EDA. Once it was brought to Port attention, these reports were submitted immediately. The other issue regarding Davis Bacon, the Port had hired a consultant for project management, and they submitted the draft contract to EDA Staff for their review. A statement in the bidder criteria information form that was submitted by the contractor stated that ?This project will be partially funded with Federal funds from the United States Department of Commerce, Economic Development Administration and therefore is subject to the Federal laws and regulations associated with the program.? It was also a requirement that the bidder follow wage law intent and affidavit in accordance to State Law. Finally, that the bidder was provided a copy of the EDA contracting provisions for construction projects. The Port did not have a separate contract for the L&I and Davis Bacon requirements as a standalone item. The EDA Staff that reviewed the contract provisions had signed off on the forms. It was found by the SAO that the form was insufficient for the requirement. The Port has added specific language for the next phase of the construction project to ensure that the contract have itemized provisions for federal conditions to be signed/initialed by the awarded contractor. It should be noted that the contractor met all the conditions of the wage requirements, submitted timely certified payroll, and has had no issues regarding Davis Bacon.Auditor?s RemarksWe appreciate the Port?s commitment to resolve this finding and thank the Port for its cooperation and assistance during the audit. We will review the corrective action taken during our next regular audit.Applicable Laws and RegulationsTitle 2 U.S. Code of Federal Regulations (CFR) Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance), section 516, Audit findings, establishes reporting requirements for audit findings.Title 2 CFR Part 200, Uniform Guidance, section 303, Internal controls, describes the requirements for auditees to maintain internal controls over federal programs and comply with federal program requirements.The American Institute of Certified Public Accountants defines significant deficiencies and material weaknesses in its Codification of Statements on Auditing Standards, section 935, Compliance Audits, paragraph 11.Title 29 CFR, Section 5.5 ? Contract provisions and related matters establishes the requirements for the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part with federal funds the clauses listed, which includes but is not limited to the minimum wages to be paid and payrolls and basic records to be maintained (submission of weekly certified payrolls).

Show full finding ▾
Full finding narrative

SCHEDULE OF FEDERAL AWARD FINDINGS ANDQUESTIONED COSTSPort of WoodlandJanuary 1, 2021 through December 31, 20212021-001 The Port did not have adequate controls for ensuring compliance with Davis-Bacon Act (prevailing wage rate) and reporting requirements.CFDA Number and Title: 11.300 ? Investments for Public Works and Economic Development FacilitiesFederal Grantor Name: U.S. economic Development AdministrationFederal Award/Contract Number: 07-01-07554Pass-through Entity Name: Washington State Department of CommercePass-through Award/Contract Number:N/AQuestioned Cost Amount: $0.00BackgroundThe U.S. Economic Development Administration (EDA) provides program assistance through the Public Works program. This program provides resources to meet the construction, design, engineering, and acquisition of related property, machinery and equipment to facilitate economic and infrastructure development. In fiscal year 2021, the Port had federal expenditures of $2,067,400 for the construction of the Rose Way Industrial Park project.Federal regulations require award recipients to establish and implement internal controls that ensure compliance with program requirements. These controls include understanding grant requirements and monitoring the effectiveness of established controls.Description of ConditionWage Rate Requirements (Davis-Bacon Act)The Davis-Bacon Act requires contractors and subcontractors that work on construction contracts in excess of $2,000 financed with federal financial assistance to pay laborers and mechanics prevailing wages?the wage rates the U.S. Department of Labor considers being similar to what local workers have been paid for similar projects. Prevailing wage rate requirements specify that the contract between the Port and the prime contractor includes specific language to ensure contractors and subcontractors are paid at prevailing wage rates. Additionally, the District is required to collect certified payroll reports from contractors and subcontractors, which include copies of their payroll and signed ?Statement of Compliance.?The Port hired one contractor for the Rose Way Industrial Park project. During the fiscal year, the Port used about $1.8 million of federal program funds to pay the contractor on this project. Our audit found the Port did not have adequate internal controls for ensuring compliance with the prevailing wage rate requirements. Specifically, the Port did not ensure the contract with its contractor included the required wage rate clause.Financial ReportingTo comply with federal reporting requirements, the Port must submit financial and performance reports to the EDA. For financial reporting requirements, the Port was required to submit the Federal Financial Report standard form, SF-425, on a semiannual basis. The form was due no later than one month following the end of the semiannual period.Our audit found the Port did not submit these required reports to the EDA.We consider these internal control deficiencies to be material weaknesses, which led to material noncompliance.This issue was not reported as a finding in the prior audit.Cause of ConditionThis is the Port?s first federal program. Employees responsible for ensuring compliance with Davis-Bacon Act and financial reporting requirements had limited experience managing grants, and they did not adequately research all applicable compliance requirements.Effect of ConditionWithout adequate internal controls ensuring it included the required Davis-Bacon clause in its contract, the Port cannot demonstrate it complied with Davis-Bacon Act requirements. The Port could be liable for paying any additional wages if the contractor did not pay prevailing wage rates to laborers working on the contract.Additionally, because the Port did not file the required semiannual SF-425 financial reports in accordance with federal program requirements, the grantor could not assess the Port?s program funding.RecommendationWe recommend that the Port establish and implement internal controls to ensure it complies with federal program requirements. Specifically, we recommend the Port insert the prevailing wage clause into contracts and ensure it completes and submits all required reports to the granting agency timely.Port?s ResponseThe Port of Woodland has reviewed the findings that were identified by the SAO. The Port states no fiscal or inappropriate use of funds occurred and that the findings are a result of ongoing issues with communication between the U.S. Department of Commerce Economic Development Administration and the Port. The EDA staff has had significant staff changes and in the time of the Port?s Rose Way Industrial Park project, has had eight different EDA project managers resulting in a lack of continuity of communication, follow up, assurances and timeliness of documents. The Port addressed these issues numerous times, even convening congressional staff members for further assistance. In one instance, EDA staff had stated verbally to Port staff to not submit any documents because of pending amendments to the original contract. This resulted in two documents not being turned in to EDA. Once it was brought to Port attention, these reports were submitted immediately. The other issue regarding Davis Bacon, the Port had hired a consultant for project management, and they submitted the draft contract to EDA Staff for their review. A statement in the bidder criteria information form that was submitted by the contractor stated that ?This project will be partially funded with Federal funds from the United States Department of Commerce, Economic Development Administration and therefore is subject to the Federal laws and regulations associated with the program.? It was also a requirement that the bidder follow wage law intent and affidavit in accordance to State Law. Finally, that the bidder was provided a copy of the EDA contracting provisions for construction projects. The Port did not have a separate contract for the L&I and Davis Bacon requirements as a standalone item. The EDA Staff that reviewed the contract provisions had signed off on the forms. It was found by the SAO that the form was insufficient for the requirement. The Port has added specific language for the next phase of the construction project to ensure that the contract have itemized provisions for federal conditions to be signed/initialed by the awarded contractor. It should be noted that the contractor met all the conditions of the wage requirements, submitted timely certified payroll, and has had no issues regarding Davis Bacon.Auditor?s RemarksWe appreciate the Port?s commitment to resolve this finding and thank the Port for its cooperation and assistance during the audit. We will review the corrective action taken during our next regular audit.Applicable Laws and RegulationsTitle 2 U.S. Code of Federal Regulations (CFR) Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance), section 516, Audit findings, establishes reporting requirements for audit findings.Title 2 CFR Part 200, Uniform Guidance, section 303, Internal controls, describes the requirements for auditees to maintain internal controls over federal programs and comply with federal program requirements.The American Institute of Certified Public Accountants defines significant deficiencies and material weaknesses in its Codification of Statements on Auditing Standards, section 935, Compliance Audits, paragraph 11.Title 29 CFR, Section 5.5 ? Contract provisions and related matters establishes the requirements for the contracting officer to insert in full in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part with federal funds the clauses listed, which includes but is not limited to the minimum wages to be paid and payrolls and basic records to be maintained (submission of weekly certified payrolls).

Corrective Action Plan

Finding ref number:2021-001Finding caption:The Port did not have adequate controls for ensuring compliance with Davis-Bacon Act (prevailing wage rate) and reporting requirements.Name, address, and telephone of Port contact person:Carol Moore, Auditor1608 Guild RoadWoodland, WA 98674(360) 225-6555Corrective action the auditee plans to take in response to the finding:(If the auditee does not concur with the finding, the auditee must list the reasons for disagreement).The Port of Woodland has reviewed the findings that were identified by the SAO. The Port states no fiscal or inappropriate use of funds occurred and that the findings are a result of ongoing issues with communication between the U.S. Department of Commerce Economic Development Administration and the Port. The EDA staff has had significant staff changes and in the time of the Port?s Rose Way Industrial Park project, has had eight different EDA project managers resulting in a lack of continuity of communication, follow up, assurances and timeliness of documents. The Port addressed these issues numerous times, even convening congressional staff members for further assistance. In one instance, EDA staff had stated verbally to Port staff to not submit any documents because of pending amendments to the original contract. This resulted in two documents not being turned in to EDA. Once it was brought to Port attention, these reports were submitted immediately. The other issue regarding Davis Bacon, the Port had hired a consultant for project management, and they submitted the draft contract to EDA Staff for their review. A statement in the bidder criteria information form that was submitted by the contractor stated that ?This project will be partially funded with Federal funds from the United States Department of Commerce, Economic Development Administration and therefore is subject to the Federal laws and regulations associated with the program.? It was also a requirement that the bidder follow wage law intent and affidavit in accordance to State Law. Finally, that the bidder was provided a copy of the EDA contracting provisions for construction projects. The Port did not have a separate contract for the L&I and Davis Bacon requirements as a standalone item. The EDA Staff that reviewed the contract provisions had signed off on the forms. It was found by the SAO that the form was insufficient for the requirement. The Port has added specific language for the next phase of the construction project to ensure that the contract have itemized provisions for federal conditions to be signed/initialed by the awarded contractor. It should be noted that the contractor met all the conditions of the wage requirements, submitted timely certified payroll, and has had no issues regarding Davis Bacon.Anticipated date to complete the corrective action: Completed prior to the end of the Audit. The 425 forms were submitted. The Port is working on communication improvements with EDA staff regarding contract requirements for future document submissions and all verbal communication with EDA staff are followed up with a written summary and emailed to all involved in the discussion. Read receipts are also being included for all email communications.

About Reporting, Special Tests and Provisions →

Data source: This information comes from the Federal Audit Clearinghouse, the official repository of Single Audit data. All data is public domain. Verify this organization's audit history at fac.gov.

Are you this organization?

Track your findings and corrective action plans across audit cycles.

Start tracking findings →

Do you fund this organization?

Monitor subrecipient audit findings and compliance status.