GREENFIELD EXEMPTED VILLAGE SCHOOL DISTRICT

EIN: 316000808

UEI: T4LNDPYJR8M9

Data as of August 23, 2026

GREENFIELD EXEMPTED VILLAGE SCHOOL DISTRICT8 audit years4 findings1 repeat
8
Audit Years
4
Total Findings
1
Repeat Findings

FY 2023-06-30

Management decision deadline — for entities that funded this organization

The FAC accepted this audit on September 4, 2025. Under 2 CFR 200.521(d), a pass-through entity that provided federal funds to this organization for this audit period must issue a management decision on these findings by March 4, 2026 (172 days ago).

What is a management decision? →
2023-006
Special Tests & Provisions
MATERIAL WEAKNESSREPEAT

2 CFR Section 3474 gives regulatory effect to the Department of Education for Appendix II to 2 CFR Section 200 which states that, in addition to other provisions required by the Federal agency or non-Federal entity, all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable: (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non-Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144 and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction”). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. The non-Federal entity must place a copy of the current GF prevailing wage determination issued by the Department of Labor in each solicitation. The decision to award a contract or subcontract must be conditioned upon the acceptance of the wage determination. The non-Federal entity must report all suspected or reported violations to the Federal awarding agency. The contracts must also include a provision for compliance with the Copeland “Anti-Kickback” Act (40 U.S.C. 3145), as supplemented by Department of Labor regulations (29 CFR Part 3, “Contractors and Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States”). The Act provides that each contractor or subrecipient must be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he or she is otherwise entitled. The non-Federal entity must report all suspected or reported violations to the Federal awarding agency. 29 CFR Section 5.5(a)(3)(ii)(A) states, in part, that a contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution shall require a clause that the contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the appropriate agency if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the agency. 29 CFR Section 5.6 further states, in part, agencies which do not directly enter into such contracts shall promulgate the necessary regulations or procedures to require the recipient of the Federal assistance to insert in its contracts the provisions of Section 5.5. No payment, advance, grant, loan, or guarantee of funds shall be approved by the Federal agency unless the agency ensures that the clauses required by Section 5.5 and the appropriate wage determination of the Secretary of Labor are contained in such contracts. Sound accounting practices require public officials to design and operate a system of internal control that is adequate to provide reasonable assurance over the reliability of federal information provided for federal reimbursement. In 2023, the School District undertook four projects that were subject to prevailing wage requirements. Education Stabilization Funds were utilized for these project costs. For two projects, the School District did not enter into a formal contract with the contractors. Evidence was provided for all projects that certified payrolls were received by the School District. Without proper controls over wage rate requirements, there is an increased risk that the School District and its contractors and subcontractors are not in compliance with applicable federal regulations. Additionally, noncompliance could result in federal funding being reduced or taken away, or other sanctions imposed by the federal grantor agency. The School District should establish (or perform existing) controls to include the required clauses of 29 CFR 5.5, particularly those concerning prevailing wage rates and the requirement that the contract shall contain required prevailing wage clauses and the contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to (or for transmission to, where applicable) the School District, in its construction contracts (and subcontracts) greater than $2,000 that are covered by the wage rate requirements and take steps to ensure contractors (and subcontractors, if applicable) are in compliance with all labor standards by collecting the required certified payroll documentation in a timely manner. The School District should obtain the necessary information from the contractor to document compliance with the program requirements and report all suspected or reported violations to the Federal awarding agency. Further, the School District should implement procedures to ensure that copies of executed contracts are maintained to support compliance of wage rate requirements.

Show full finding ▾
Full finding narrative

2 CFR Section 3474 gives regulatory effect to the Department of Education for Appendix II to 2 CFR Section 200 which states that, in addition to other provisions required by the Federal agency or non-Federal entity, all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable: (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non-Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144 and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction”). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. The non-Federal entity must place a copy of the current GF prevailing wage determination issued by the Department of Labor in each solicitation. The decision to award a contract or subcontract must be conditioned upon the acceptance of the wage determination. The non-Federal entity must report all suspected or reported violations to the Federal awarding agency. The contracts must also include a provision for compliance with the Copeland “Anti-Kickback” Act (40 U.S.C. 3145), as supplemented by Department of Labor regulations (29 CFR Part 3, “Contractors and Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States”). The Act provides that each contractor or subrecipient must be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he or she is otherwise entitled. The non-Federal entity must report all suspected or reported violations to the Federal awarding agency. 29 CFR Section 5.5(a)(3)(ii)(A) states, in part, that a contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution shall require a clause that the contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the appropriate agency if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the agency. 29 CFR Section 5.6 further states, in part, agencies which do not directly enter into such contracts shall promulgate the necessary regulations or procedures to require the recipient of the Federal assistance to insert in its contracts the provisions of Section 5.5. No payment, advance, grant, loan, or guarantee of funds shall be approved by the Federal agency unless the agency ensures that the clauses required by Section 5.5 and the appropriate wage determination of the Secretary of Labor are contained in such contracts. Sound accounting practices require public officials to design and operate a system of internal control that is adequate to provide reasonable assurance over the reliability of federal information provided for federal reimbursement. In 2023, the School District undertook four projects that were subject to prevailing wage requirements. Education Stabilization Funds were utilized for these project costs. For two projects, the School District did not enter into a formal contract with the contractors. Evidence was provided for all projects that certified payrolls were received by the School District. Without proper controls over wage rate requirements, there is an increased risk that the School District and its contractors and subcontractors are not in compliance with applicable federal regulations. Additionally, noncompliance could result in federal funding being reduced or taken away, or other sanctions imposed by the federal grantor agency. The School District should establish (or perform existing) controls to include the required clauses of 29 CFR 5.5, particularly those concerning prevailing wage rates and the requirement that the contract shall contain required prevailing wage clauses and the contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to (or for transmission to, where applicable) the School District, in its construction contracts (and subcontracts) greater than $2,000 that are covered by the wage rate requirements and take steps to ensure contractors (and subcontractors, if applicable) are in compliance with all labor standards by collecting the required certified payroll documentation in a timely manner. The School District should obtain the necessary information from the contractor to document compliance with the program requirements and report all suspected or reported violations to the Federal awarding agency. Further, the School District should implement procedures to ensure that copies of executed contracts are maintained to support compliance of wage rate requirements.

Corrective Action Plan

The district engaged in multiple construction projects using ESSER funds. Two projects were not in compliance with the prevailing wage reporting requirements. The district has updated policy 6114 – Cost Principles – Spending Federal Funds on 6/27/2022 and 1/27/2025 to comply with the Davis-Bacon Act. In addition, the district now ensures all construction contracts are presented to and reviewed by legal counsel to ensure compliance with federal, state and local laws.

Prior Finding References

2022-007

About Special Tests and Provisions →
2023-007
Reporting
MATERIAL WEAKNESS

The Department of Education requires Local Education Agencies (LEAs) and educational entities to submit the Final Expenditure Report (FER) by December 1, 2023. LEAs and educational entities must complete the FER at the end of each fiscal year for the prior state fiscal year’s ESSER expenditures. All expenses reported on the FER should be paid. There should be no encumbered amounts. We noted that the School District filed its fiscal year 2023 final expenditure report by the required deadline. However, the School District claimed $451,166 more in expenditures on the final expenditure report than they had identified in eligible expenditures for the program. The School District was able to work with the Department of Education to resubmit their final expenditure report with the proper amounts. Overreporting expenditures could lead to noncompliance with program requirements and questioned costs. We recommend the School District adopt proper procedures to ensure that program expenditures are reported accurately.

Show full finding ▾
Full finding narrative

The Department of Education requires Local Education Agencies (LEAs) and educational entities to submit the Final Expenditure Report (FER) by December 1, 2023. LEAs and educational entities must complete the FER at the end of each fiscal year for the prior state fiscal year’s ESSER expenditures. All expenses reported on the FER should be paid. There should be no encumbered amounts. We noted that the School District filed its fiscal year 2023 final expenditure report by the required deadline. However, the School District claimed $451,166 more in expenditures on the final expenditure report than they had identified in eligible expenditures for the program. The School District was able to work with the Department of Education to resubmit their final expenditure report with the proper amounts. Overreporting expenditures could lead to noncompliance with program requirements and questioned costs. We recommend the School District adopt proper procedures to ensure that program expenditures are reported accurately.

Corrective Action Plan

Upon becoming Treasurer in March 2024, I noted an inconsistence in the 507 ESSER fund. I realized the former Treasurer had requested reimbursement twice for the same expenditures thus giving the district a positive balance in the fund. I contacted DEW’s Office of Federal Programs to report the issue and determine a resolution. I was able to expend the funds on a project approved for ESSER expenditures prior to all grant deadlines. DEW reopened the final expenditure reports allowing the district to correct the past reporting discrepancy. Per DEW emails and communications, the issue is resolved and closed. This issue was caused by the project cash requests not being made on regular intervals and the advance of federal funds from the general fund. The district now submits project cash requests on a monthly basis, to prevent request date overlap and does not advance federal funding from the general fund.

About Reporting →

FY 2022-06-30

FAC accepted this audit on March 27, 2024 — management decision was due September 27, 2024.

2022-007
Special Tests & Provisions
MATERIAL WEAKNESS

2 CFR Section 3474 gives regulatory effect to the Department of Education for Appendix II to 2 CFR Section 200 which states that, in addition to other provisions required by the Federal agency or non-Federal entity, all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable: (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non-Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144 and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction”). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. The non-Federal entity must place a copy of the current prevailing wage determination issued by the Department of Labor in each solicitation. The decision to award a contract or subcontract must be conditioned upon the acceptance of the wage determination. The non-Federal entity must report all suspected or reported violations to the Federal awarding agency. The contracts must also include a provision for compliance with the Copeland “Anti-Kickback” Act (40 U.S.C. 3145), as supplemented by Department of Labor regulations (29 CFR Part 3, “Contractors and Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States”). The Act provides that each contractor or subrecipient must be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he or she is otherwise entitled. The non-Federal entity must report all suspected or reported violations to the Federal awarding agency. 29 CFR Section 5.5(a)(3)(ii)(A) states, in part, that a contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution shall require a clause that the contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the appropriate agency if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the agency. 29 CFR Section 5.6 further states, in part, agencies which do not directly enter into such contracts shall promulgate the necessary regulations or procedures to require the recipient of the Federal assistance to insert in its contracts the provisions of Section 5.5. No payment, advance, grant, loan, or guarantee of funds shall be approved by the Federal agency unless the agency ensures that the clauses required by Section 5.5 and the appropriate wage determination of the Secretary of Labor are contained in such contracts. Sound accounting practices require public officials to design and operate a system of internal control that is adequate to provide reasonable assurance over the reliability of federal information provided for federal reimbursement. In 2022, the School District undertook two projects that were subject to prevailing wage requirements. Education Stabilization Funds were utilized for these project costs. For one project, the contract documents provided for us to inspect did not include the required wage rate clauses. For the other project, the School District did not enter into a formal contract with the contractor. Evidence was provided for both projects that certified payrolls were received by the School District. Without proper controls over wage rate requirements, there is an increased risk that the School District and its contractors and subcontractors are not in compliance with applicable federal regulations. Additionally, noncompliance could result in federal funding being reduced or taken away, or other sanctions imposed by the federal grantor agency. The School District should establish (or perform existing) controls to include the required clauses of 29 CFR 5.5, particularly those concerning prevailing wage rates and the requirement that the contract shall contain required prevailing wage clauses and the contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to (or for transmission to, where applicable) the School District, in its construction contracts (and subcontracts) greater than $2,000 that are covered by the wage rate requirements and take steps to ensure contractors (and subcontractors, if applicable) are in compliance with all labor standards by collecting the required certified payroll documentation in a timely manner. The School District should obtain the necessary information from the contractor to document compliance with the program requirements and report all suspected or reported violations to the Federal awarding agency. Further, the School District should implement procedures to ensure that copies of executed contracts are maintained to support compliance of wage rate requirements.

Show full finding ▾
Full finding narrative

2 CFR Section 3474 gives regulatory effect to the Department of Education for Appendix II to 2 CFR Section 200 which states that, in addition to other provisions required by the Federal agency or non-Federal entity, all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable: (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non-Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144 and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction”). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. The non-Federal entity must place a copy of the current prevailing wage determination issued by the Department of Labor in each solicitation. The decision to award a contract or subcontract must be conditioned upon the acceptance of the wage determination. The non-Federal entity must report all suspected or reported violations to the Federal awarding agency. The contracts must also include a provision for compliance with the Copeland “Anti-Kickback” Act (40 U.S.C. 3145), as supplemented by Department of Labor regulations (29 CFR Part 3, “Contractors and Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States”). The Act provides that each contractor or subrecipient must be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he or she is otherwise entitled. The non-Federal entity must report all suspected or reported violations to the Federal awarding agency. 29 CFR Section 5.5(a)(3)(ii)(A) states, in part, that a contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution shall require a clause that the contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the appropriate agency if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the agency. 29 CFR Section 5.6 further states, in part, agencies which do not directly enter into such contracts shall promulgate the necessary regulations or procedures to require the recipient of the Federal assistance to insert in its contracts the provisions of Section 5.5. No payment, advance, grant, loan, or guarantee of funds shall be approved by the Federal agency unless the agency ensures that the clauses required by Section 5.5 and the appropriate wage determination of the Secretary of Labor are contained in such contracts. Sound accounting practices require public officials to design and operate a system of internal control that is adequate to provide reasonable assurance over the reliability of federal information provided for federal reimbursement. In 2022, the School District undertook two projects that were subject to prevailing wage requirements. Education Stabilization Funds were utilized for these project costs. For one project, the contract documents provided for us to inspect did not include the required wage rate clauses. For the other project, the School District did not enter into a formal contract with the contractor. Evidence was provided for both projects that certified payrolls were received by the School District. Without proper controls over wage rate requirements, there is an increased risk that the School District and its contractors and subcontractors are not in compliance with applicable federal regulations. Additionally, noncompliance could result in federal funding being reduced or taken away, or other sanctions imposed by the federal grantor agency. The School District should establish (or perform existing) controls to include the required clauses of 29 CFR 5.5, particularly those concerning prevailing wage rates and the requirement that the contract shall contain required prevailing wage clauses and the contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to (or for transmission to, where applicable) the School District, in its construction contracts (and subcontracts) greater than $2,000 that are covered by the wage rate requirements and take steps to ensure contractors (and subcontractors, if applicable) are in compliance with all labor standards by collecting the required certified payroll documentation in a timely manner. The School District should obtain the necessary information from the contractor to document compliance with the program requirements and report all suspected or reported violations to the Federal awarding agency. Further, the School District should implement procedures to ensure that copies of executed contracts are maintained to support compliance of wage rate requirements.

Corrective Action Plan

In this audit period the requirement for paying the prevailing wage was new and we have taken steps to ensure compliance. Even though both contractors paid prevailing wages, it was not in the written contracts.

About Special Tests and Provisions →

FY 2021-06-30

FAC accepted this audit on September 29, 2022 — management decision was due March 29, 2023.

2021-004
Program Income

Having a sound internal control framework is pertinent to a properly functioning organization. A pertinent element of a properly functioning internal control system is performance of reconciling procedures between records of cash collections and actual cash within cash drawers and maintenance of documentation evidencing those procedures. During testing, we determined that the School District?s established procedure is to reconcile cash collections to sales documented for each day and to maintain such documentation for audit. However, we found that for one of the buildings within the School District, the supporting documentation was not always maintained. The School District should implement procedures to ensure that documentation evidencing performance of established internal controls is properly maintained.

Show full finding ▾
Full finding narrative

Having a sound internal control framework is pertinent to a properly functioning organization. A pertinent element of a properly functioning internal control system is performance of reconciling procedures between records of cash collections and actual cash within cash drawers and maintenance of documentation evidencing those procedures. During testing, we determined that the School District?s established procedure is to reconcile cash collections to sales documented for each day and to maintain such documentation for audit. However, we found that for one of the buildings within the School District, the supporting documentation was not always maintained. The School District should implement procedures to ensure that documentation evidencing performance of established internal controls is properly maintained.

Corrective Action Plan

The District will review with the Cafeteria Manager and implement procedures to maintain documentation.

About Program Income →

Data source: This information comes from the Federal Audit Clearinghouse, the official repository of Single Audit data. All data is public domain. Verify this organization's audit history at fac.gov.

Are you this organization?

Track your findings and corrective action plans across audit cycles.

Start tracking findings →

Do you fund this organization?

Monitor subrecipient audit findings and compliance status.

Start monitoring →

Product

Resources

Legal

Single Audit Intelligence is an independent tool powered by Federal Audit Clearinghouse data. Not affiliated with GSA, OMB, or any federal agency.

© 2026 Single Audit Intelligence. All data is public domain.